Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Tender For Shifting/Ug Work Of 33 Kv Electrical Utilities Due To Widening Of Banda-Bahraich Marg (Kachehari Chauraha To Mawai-By-Pass Chauraha) Under Eudd, Banda. Submission Date for this Tender is 04-05-2024. Transmission Line Tenders in banda Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 24-Apr-2024 | Date Exten. Corr.3 | Date | 30-04-2024 |
2 | 30-Apr-2024 | Date Extension Corr.2 | Date | 04-05-2024 |
FileName | File Description | File Size |
4a722c16-8dd0-468f-978c-8095b0d287ac.html | Tender Notice | 0 KB |
BOQ_1593603.xls | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Tendernotice_2.pdf | Tender Document | 0 KB |
Tender_Document_SED2324_1_1.rar | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | The work of erection of new 33 KV DISTRICT COURT OVERHEAD Line by shifting of underground 33 KV Lines of District Court, Banda with hoisting of 33 KV Cable at double pole structure District Hospital side from 132 KV Sub-Station to Court gate no. 2 via Maharana Pratap Chauk due to road widening of Banda-Bahraich Marg (Chilla Road to Ghoda Chauraha & Kachehari Chuaraha) from 33/11 KV Sub-Station, Chilla Road, Banda UNDER FULL DEPOSIT SCHEME YEAR 2023-24 under EUDD, BANDA (Turn-key Basis), including carriage of all required material from E.S.C., BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/damaged scraped material/TFs from site to store centre, if any. All works like erection, fixing, installation, laying & grouting etc. shall be done by firm as per direction of Engineer incharge/RESSPO manual. During the erection of lines/poles has to be done including cartage. Various type petty materials/work, which are not mentioned in scope of work, but actual required has to be arranged by contractor at his own cost. No extra payment will be made to such petty requirement. All steel material supplied by firm have to Galavanised, Details of the work as given below :- |
2 | SUPPLY OF MATERIAL - |
3 | ST Pole 11.0 Mtr. Long SP-55 |
4 | F/E-Bracket with N & B for fitting Top Insulator 33 KV |
5 | 33 KV Pin Insulator |
6 | 33 KV GI Pin with Nut |
7 | Cable All. 3x120 Sq.mm. XLPE 33 KV |
8 | 33 KV Cable Jointing Kit for 3x120 Sq.mm. XLPE Cable |
9 | GI Pipe 6 Inch Dia (3 Mtr. Each Pipe) with supporting clamps. |
10 | MS Angle Iron 65x65x6x2700 mm Long Bracing with 4 Clamps & Nut-Bolts. |
11 | Top Channel 125x65x6x2240 mm |
12 | MS Dropper Channel 100x50x2028 mm |
13 | PG Clamp |
14 | Danger Board with clamp & Nut/Bolt for 33 KV |
15 | Clamp with Nut-Bolts for Channel and for supporting cable |
16 | Stay Set Complete (GI Stay rod 20x1800 mm, Stay wire 7/8 SWG 10 Kg., Stay clamp, Bolt-Nut & Washer with Grounting) for ST Pole. |
17 | Earthing Rod Complete |
18 | Nut, Bolt & Washer of suitable sizes |
19 | ERECTION WORK - |
20 | Erection & fixing of ST Pole 11.0 Mtr. Long SP-55 as single/double pole structure with 33 KV fittings. |
21 | Erection & fixing of F/E-Bracket with N & B for fitting Top Insulator 33 KV |
22 | Erection & fixing of 33 KV Pin Insulator |
23 | Erection & fixing of 33 KV GI Pin with Nut |
24 | Erection & fixing of GI Pipe 6 Inch Dia (3 Mtr. Each Pipe) with supporting clamps. |
25 | Erection & fixing of MS Angle Iron 65x65x6x2700 mm Long Bracing with 4 Clamps & Nut-Bolts. |
26 | Erection & fixing of Top Channel 125x65x6x2240 mm |
27 | Erection & fixing of MS Dropper Channel 100x50x2028 mm |
28 | Erection & fixing of PG Clamp |
29 | Erection & fixing of Danger Board with clamp & Nut/Bolt for 33 KV |
30 | Erection & fixing of Clamp with Nut-Bolts for Channel and for supporting cable |
31 | Erection & fixing of Stay Set Complete |
32 | EARTHING OF POLE BY EARTHING ROD |
33 | Concreting/Grouting of erected 11 Mtr. long STP Poles with muffing as per direction of Engineer incharge/RESSPO manual. The support shall be grouted with cement, sand and brick ballast /stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each), including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. as per actual site requirement. (arrangement of grouting material by firm). |
34 | Making of Cable J/Kit 33 KV & Hanging and fixing on double pole with proper contact. |
35 | Laying of XLPE Cable in trench with required sand. |
36 | Dismentalling of line material/poles and deposit to central store. |