Tender For Construction Of New 33 Kv Line And New Substation, (1) Construction Of New 33 Kv Line Harpur Tiwari From 132/33 Kv S/S Baikuthpur Distt- Mahrajganj To 33 /11 Kv S/S Harpur Tiwari Distt. Maharajganj And (2) - Construction Work Of 1X5 Mb 90 33/11, mahrajganj-Uttar Pradesh

Purvanchal Vidyut Vitaran Nigam Limited has published Tender For Construction Of New 33 Kv Line And New Substation, (1) Construction Of New 33 Kv Line Harpur Tiwari From 132/33 Kv S/S Baikuthpur Distt- Mahrajganj To 33 /11 Kv S/S Harpur Tiwari Distt. Maharajganj And (2) - Construction Work Of 1X5 Mb 90 33/11. Submission Date for this Tender is 03-05-2024. Overhead Line Tenders in mahrajganj Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43191752
Corrigendum : Tender For Construction Of New 33 Kv Line And New Substation, (1) Construction Of New 33 Kv Line Harpur Tiwari From 132/33 Kv S/S Baikuthpur Distt- Mahrajganj To 33 /11 Kv S/S Harpur Tiwari Distt. Maharajganj And (2) - Construction Work Of 1X5 Mb 90 33/11
Open Tender
Indian
Uttar Pradesh
mahrajganj
03-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Tender For Construction Of New 33 Kv Line And New Substation, ( 1 ) Construction Of New 33 Kv Line Harpur Tiwari From 132 / 33 Kv S / S Baikuthpur Distt- Mahrajganj To 33 / 11 Kv S / S Harpur Tiwari Distt. Maharajganj And ( 2 ) - Construction Work Of 1X5 Mb 90 33 / 11 Kv Power Substation Harpur Tiwari District Maharajganj And Related 11 Kv Line On Semi Turnkey Basis Under The Business Plan Year 2024-25 ( Phase-Ii ) Under The Electrical Secondary Works Department, Gorakhpur.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 24-Apr-2024 Date Extention Date 29-04-2024
2 30-Apr-2024 dateextention-2 Date 03-05-2024

Key Value

Document Fees
INR 5900 /-
EMD
INR 197000.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
0dd33174-8350-46fc-96ed-1cdadda9e793.html Tender Notice 0 KB
67TenderForm.rar Tender Document 0 KB
BOQ_1593510.xls Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

Name of Work: fo|qr ek/;fed dk;Z [k.M] xksj[kiqj ds {ks=kUrxZr fctusl Iyku o"kZ 2024&25 ¼Qst&II½ ds vUrxZr ¼1½ Construction of New 33 KV Line Harpur Tiwari From 132/33 KV S/S Baikuthpur Distt- Mahrajganj To 33/11 KV S/S Harpur TiwariDistt. Maharajganj rFkk ¼2½ 1x5 ,e0oh0,0 33@11 ds0oh0 fo|qr midsUnz gjiqj frokjhtuin& egjktxat dk fuekZ.k dk;Z ,oa rRlEcfU/kr 11 ds0oh0 ykbZu dk fuekZ.k dk;Z lseh VuZdh vk/kkj ijA
Sl. No. Item Description
1WORK-1 Part-A(Materials Provided by contractor) Particulars
233KV ‘XLPE’ C/J Kit 3x300mm² Straight through
333KV ‘XLPE’ C/J Kit 3x300mm² Outdoor
433KV ‘V’ Type Cross Arm 100x50x6mm, MS Channel ( 7.9 Kg/m)
533 KV Polymer Pin Insulator
6Number Plate
7Danger Board with Clamp
8Barbed wire
9Bolts, Nuts, & Washers
10X-armclamp with nut bolt for ST Pole 11 mtr with nut bolt by 50x8 mm MSflat Iron make
11X-arm clamp with nut bolt for PCC Pole 9 mtr with nut bolt by 50x8 mm MSflat Iron make
12Complete Stay (GI Stay rod 20x1800mm, stay wire 7/8 SWG 10 Kg, stay clamp, bolt, nut& washer with concerte grouting)
13MS Earthing Rod 20x2500 mm
1433 KV Polymer Disc Insulator 70 KN B&S Type
15Disc fitting 70 KNB&S Type for DOG
16P.G. Clamp for DOG
17‘E’ Bracket for 33 KV
18M.S. Angle Iron 65x65x6mm bracing with clamps
1933 KV. Top channel ( 125x65mmX3200 mm ( 10.7 Kg/m) with clamps
2033 KV Guarding angle
21GI Wire 5 mm
2233 KV Guarding angle Clamp with nut bolt for PCC Pole 9 mtr. /ST Pole 11mtr. with Nut and Bolt by 50x8 mm MS Flat Iron make.
23F-bracket with nut bolt for ST Pole 11 mtr & PCC Pole 9 mtr with nut bolt by 50x8 mm MSflat Iron make
24Alluminium Paint
25Red Oxide Paint
26PART- BWORK (DETAILS OF WORK) Shifting,loading and carriageof following materials on private truck at store centre Maharajganj & Un-loading of the same with proper stacking at work site .
27P.C.C.Pole9 M long
28S.T. Pole – 11 Mtr. Long
2933 KV ‘XLPE’ Cable 3x300mm²
30ACSR ‘Dog’ Conductor
31Laying of 33 KV 3x300 mm² ‘XLPE’ cable of double circuit by digging pit below ground level by fixing bricks(4½?)on both side of trench wall and 9? brick work at the centre of the trench along the cable.Fixing brick slab on top after filling sand around both the cable including cost of bricks/ HDD Method by drillingmachine as per site requirement.
32Laying of 33KV ‘XLPE’ cable in air after providing 6” dia. M.S pipe 3 m long Complete work.(Rs 1475/mtr)
33Providing & Cable jointing charges of 33 KV XLPE Cable Outdoor.
34Providing & Cable jointing charges of 33 KV XLPE Cable Straight Through
35GI PipeEarthing Complete forCable jointing Kit with materials
36Erection of Single pole structure on 9 Mtr PCC Pole including all works of evocation of pit, pole erection & fitting of all accessories for single circuit ( "V" type cross arm 100 x 50 x 6 mm, M.S. Channel (7.9 Kg./M) clamps with bolt and nut, composite polymer pin insulator, danger board with clamp,barbed wire earthing, etc. complete as per RESSPO).
37Erection of Double pole structure on 9 Mtr PCC Poleincluding all works of evocation of pit, pole erection & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp,barbed wire earthing, etc. complete as per RESSPO) .
38Erection of Four pole structure on 9 Mtr PCC Poleincluding all works of evocation of pit, pole erection & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp,barbed wire earthing, etc. complete as per RESSPO) .
39Erection of Single pole structure on 11mtr ST. (SP-55) Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above & fitting of all accessories for single circuit ( "V" type cross arm 100 x 50 x 6 mm, M.S. Channel (7.9 Kg./M) clamps with bolt and nut, composite polymer pin, insulator, danger board with clamp, Alluminium paint, red oxide paint, barbed wire earthing, etc. complete as per RESSPO.
40Erection of Double pole structure on 11 mtr ST Pole including all works of evocation of pit, pole erection & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, Alluminium paint, red oxide paint, barbed wire earthing, etc. complete as per RESSPO) .
41Erection of four pole structure on 11 mtr ST Pole including all works of evocation of pit, pole erection & fitting of all accessories (M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, Alluminium paint, red oxide paint, barbed wire earthing, etc. complete as per RESSPO) .
42Laying, spreading, lifting and final sagging of 3 phases of ACSR Dog conductorin accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel.
43Grouting of stay rods (20 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing.
44Grouting of PCC Pole in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming.
45Grouting of ST Pole in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & making plinth for pole 30 cm above from ground level.
46Earthing of pole by M.S. Earthing rod of 20x2500mm.and 6 SWG earthing wire etc.
47Painting of S.T Pole 11 mtr. Long with Alluminium paint and red oxide paint etc.
48Chopping of branches of trees of eucalyptus, Neem, Keekar and other kind of trees along the route of the line and disposal of the same at suitable place.
49Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. as per drawing.
50WORK-2 Part-ASUB-STATION MATERIALS Shifting Loading Carriage & Unloading of following materials from store centre Maharajganj to work site
5111 KV I/C, Switch Gear ‘VCB’ CTR-600/ 300/5A, 350MVA
5211 KV O/G, Switch Gear ‘VCB’ CTR-200/ 100/5A, 350MVA
5311 KV H.T. Cable 3x300mm2 ‘XLPE’
5411 KV H.T. Cable 3x185mm2 ‘XLPE’
55T/F 63 KVA.
5633 KV ‘VCB’ withStructure
5733 KV C.T.R. 400/200/1A (1set=3No)
5833 KVSingle T/F Control Pannel
59ACSR Dog Conductor.
6033 KV PT
6133 KV Isolator structure
6233 KV L.A. structure
6333 KV Postinsulator structure
6433 KV fuse set structure
6533 KV CT structure
6633 KV PT structure
6733 KV Line isolator
6833 KV Bus isolator
6933 KV L.A. (3 Nos.L.A.Per set)
7033 KV Postinsulator complete
7133 KV fuse set complete
7290lbs, Rail pieces for Transformer ( 44.64 Kg /M)
73SUB-STATION WORK Providing By Contractor of following structures as perRESSPO Drawing & Erection,Grouting of following fabricated structures as perRESSPO Drawing with complete earthing.
7433 KV Terminal Gantry
7533 KV Busbar Gantry
76Erection,Grouting of following fabricated structures as perRESSPO Drawing with complete earthing.
7733 KV Line Isolator structure
7833 KV Bus Isolator structure
7933 KV L.A. structure
8033 KV Postinsulator structure
8133 KV fuse set structure
8233 KV CT structure
8333 KV PT structure
84Erection,mounting and fitting of equipment on erected structures as perRESSPO Drawing.
8533 KV Line isolator complete
8633 KV Bus isolator complete
8733 KV L.A. (3 Nos.L.A.Per set)
8833 KV Postinsulator complete
8933 KV fuse set complete
90Plinth for 5 MVA Transformer
91Construction of plinth for 5 MVA, 33/11 KV Transformer of size (4.5 x 3.5 x1)m (0.50m below ground level and 0.5 m above ground level) as per details & drawing attached :–
92Excavation of earth (4.70 x 3.70 x 0.5) m
93Flooring of plinth in C. C. 1 : 4 : 8 (cement, sand & brick ballast) for making foundation bed. Size (4.70 x 3.70 x 0.15) m
94Ist Class brick work for side walls size 0.345 m wide upto 0.3 M height and 0.23 m wide upto 0.35 m height cm C.C. ratio of 1 : 4 (cement & find sand)
95Filling of brick ballast in plinth in ratio 1 : 4 : 8 (cement, coarse sand & brick ballast) with proper ramming. Size (4.0 x 3.0 x 0.65) m
96R.C.C. work in the top layer of plinth in ratio 1:2:4 in size (4.46 x 3.46) m and 0.20 m thickness by using MS bar of 12mm both ways. The work also includes binding of steel reinforcement.
97Quantity of M.S. Tor of size 12mm dia required for reinforcement of plinth in RCC work should be 18 nos. bars of 3.4 mtr. length and 12 nos. bars of 4.4 Mtr. length. Works also includes cutting, bending and laying etc. in the T/F Plinth.
98Grouting of 02 Nos. 90 / 105 lb. Rail pieces of 3.46 M long and (50 x 50 x 6) mm M.S. Angle in R.C.C. work at the top of plinth work also includes cutting of rail and angle pieces etc.
9912 mm thick plaster with cement mortar ratio 1 : 4 (cement & fine sand) of plinth of 0.5 M above ground level.
100Earth Mat Work
101Excavation of earth of size (0.5 x 0.75 x 369) m & (0.5 x 0.75 x 60) m in switchyard area as per drawing for laying of 32 mm dia M.S. Round and 50 x 6 mm size M.S. strip and refilling & ramming of the same earth into the trenches after completion of work
102Laying of 32 mm dia M.S. Round Bar in 0.75 m deep trenches as excavated in items.
103Welding with lap joint minimum length 150mm over lapping on both side of item, hall be done so that all the edges may fill completely with high quality Arc welding. All joints shall be painted with black bituminous paint.
104Jointing of 32 mm dia M.S. Round in earth mat at cross joint using high quality Arc welding. 75 mm piece of 32 mm Dia M.S. Round shall also be welded to make the joints strong for transfer the fault current. Work also included cutting welding and painting with black bituminous paint of joint etc.
105Fabrication of 32 mm dia bar for3.0 m long electrodes and diggingthem into ground so that jointing of earth electrode with the Earth Mat can be done by using 75mm long piece of M.S. Round using high quality Arc welding and paints of joints with black bituminous paint.
106Laying ofM.S.Earth Strip :–
107Layingof M.S. Earth strip of size 50 x 6 mm (min. weight = 2.4 Kg/m) about 160 mtr. length for connecting the Earth Mat with steel structure.
108The work also includes cutting, bending, straigh - tening, over-lapping and welding the Earth Strip with Earth Mat and various steel structures by using high quality Arc welding in already digging trenches.
109Painting of Earth Strip of size (40 x 6) mm with one coat of ready mixed primer with two coats of ISI mark synthetic channel green paint.
110Laying of stringing of 33 KV Bus-bar on ACSR Dog conductorincluding fitting & mounting of disc insulator B&S type with fitting complete.
11133KVBus Bar Jumpering :
112Stringing of 33 KV bus bar by using ACSR Dog Conductor and including fixing of 33 KV Disc Insulators and tension fittings to complete work with proper sagging of Bus Bar etc.
113Jumpering, including clamping / binding with ACSR dog conductor:
114Terminal gantry to 33 KV Line Isolator.
11533 KV Line Insulator to 33 KV bus bar through post insulators
11633 KV Bus bar to 33 KV Bus Isolator.
11733 KV Bus Isolator to 33 KV VCB
11833 KV VCB to 33 KV C.T.
11933 KV C.T. to 33 KV P.T.s
12033 KV P.T. to 33 KV Fuse Set
12133 KV C. T. Setto 33/11Power Transformer through 33 KVLightening Arrestors work includes supply & installation of proper size copper lugs with power Transformer.
122Installation of 33/11 KV, 5 MVA Transformer as per following
123Shifting of 5 MVA 33/11 KV, Transformer to transformer plinth in Switch Yard.
124Erection of shifted Transformer at plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect.
125Boring and lowering of G.I. Pipe size 32 mm dia… into the ground up to water level 20 Mtr., with the lower end of solid copper cone Approx 225mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
126Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100 x 50 mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300 x 300 x 700 mm and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexiblecopper bond, M.S. Bolt and washer.
127Fabrication and erection of cable support made of two pieces of M.S. Angle (50 x50 x 6) / 65 x 65 x 6) mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Flat (50×6)mm pieces of size 150 mm long each by welding at equal intervals and grouting in a block of size (300 x 300 x 700) mm in CC 1 : 3 : 6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50 x 6) mm M.S. Flat for holding the cable including nuts and bolts.
128Installation of 11 KV Switch Gears in Control Room :
129Carefully & safely shifting of11 KV switch gears from outsideto inside the switch gear room, groutingof foundation boltsin C.C.ratioof 1 : 2 : 4(including cutting of RCC floor and finishing ofRCC floor) as per requirement placing, aligningand fixing of 11 KVanchor GIboltsandnuts of proper size for completion of work.
130Safely mountingof 11 KV PT on 11 KV Incoming switch gear filling of oil (if required) making all electrical connections and testing & commissioning of work.
131Proper fixingand making bus bar connection in between two switch gears after proper cleaning. Workalso include proper insulation, taping byempire, PVC andH.T. tapeetc.
132H.T. Power Cable Laying :
133Laying 11 KV, (3 x 300) mm2 XLPE, Cable from power transformer to 11 KV Incomingswitch gear in the cable trench 0.45 m wide, 0.90m depth. Providing 150 mm local sandfor cushion beneath and 150 mm above the cable (quantity of local sand required 0.375 cubm/m in length). The cable shall be duly protected bybrick. On both side of cable by laying brick verticallyandbricks would also be laid horizontally on top of vertically laid bricks along the cable(minimum 18 Nos. of bricks per mtr. lengthareto be laid top andouter side along the cable.
134Laying11 KV, 3 x 185 mm2  XLPE, Power cable fromoutgoing switch gear to11 KVdoublepoles in the cable trench 0.45m wide, 0.90m depth. Providing 150 thickness mm local sand for cushion beneath and150mm above thecable (quantity oflocalsandrequired 0.375 cubm/m in length). The cable shall be duly protected by brick. On both side of cable by laying bricks vertically and bricks would also be laid horizontally on top of vertically laid bricks along the cable (minimum 18 Nos. per mtr. length are to be laid top and outer side along the cable.
135Filling of sand in cable trench in the Switch Gear Room.
136Jointingof following 11KVPower Cable ends :
137Making of 11 KV XLPE Heat shrinkable out door jointing kits after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs.
138Making of 11 KV XLPE heat shrinkable indoor jointing kits in switch gears after carefully removing the insulation of cable, providing and crimping of proper size of lugs, plumbing and taping of cable with good quality available insulation tape with J/Kit boxes. Fixing and insulating of lugs on cable with switch gear complete in all respect.
139Providing & wearing of 100 mm dia 3.5 mm long G.I. pipe in the feeder cable of size of (3 x 185)mm2 XLPE power cable before making the outdoor cable boxes. The work includes the sealing of G.I. Pipe, top end and lower end of the pipe is to be buried in to the ground about ½ m and proper dressing of cable etc. The work includes lifting, mounting and clamping of 11 KV feeder cable boxes on the feeder with double pole structure and making connections.
140Providing and Installation of 24 (12+12 volt) Volt battery and Inverter ( Exide tubuler battery) with cabinet.(1 Set=2 No. Battery 12 Volt and 01 No. Inverter)
141Armoured Copper ContralCable Laying as per following :
142Providing and Laying of different sizeof Armoured Copper control cables i.e.(2 x 2.5)mm2 / (4 x 2.5) mm2from Buchholz realy to Marshalling box Marshalling box to indication protection board in switch gear room, 33 KV CT"s to CT"s Junction Box, CT 33 KV,V.C.B. Control Panel , and capacitor Bank Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box and indication board as per required for installed equipment.
143Earthing of 11 KV Switch Gears :
144Preparation of earth mat for earthing of indoor equipments by means of M.S. earth strips (40 x 6) mm connecting to 4 Nos. earthingelectrodes of 32 mm dia. (including fabrications of earthing electrodes)3m long on either side (as per RESSPOdrg. RES-40). This work includes driving of earthing electrodes, driving them into earth so that its top remains 500 mm below ground level, earth work, laying, bending, welding of M.S. earth strips (40 x 6) mm and also layingof theM.S. strip (40 x 6) mm in trench of control room and connecting to both sides squares including cost of earth strip (40 x 6) mm approx. 40m length.
145Earthing of all indoor equipments by laying and providing M.S. earth strip (40 x 6) mm including cutting, bending and welding etc.
146Erection and groutung of 33 KV VCB Structure and Construction of plinth for the structure of 33 KV VCB and Installation of 33 KV VCB as per following Assembling and installation of 33KV VCB on the VCB out doorstructure on the plinth. Adjustment of operating mechanismin proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing,ifrequired.
147Erection and groutung of 33 KV CT Structure and Installation of 33 KV CT as per following. Assembling and installation of 33KV CT on the CTout doorstructure on the plinth. Adjustment of operating mechanismin proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing,ifrequired.
148Installation of 33 KV PT on erected structureas per Assembling and installation of 33KV PT on the PToutdoorstructure on the plinth. Adjustment of operating mechanismin proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing, ifrequired.(1 SET=3 No) with complete connection by providing required length of armouredcopper control cable with complete work.
149Installation of 33 KV control panel for “VCB” with complete earthing and respectivelyinstallation of battery and battery charger in control room and making connection.
150Lighting Arrangement of 33/11 KV Sub-Stationoutdoor switch yard and approch road :
151Erection of 8.5 Mtr. long PCC Pole for street lightwith 1.0 Mtr. long street light brackets including fixing and supply of junctions box, grouting of support in C.C. ratio 1:4:8 (cement, sand and brick ballast) in size (0.40 x 0.4 x 1.2) m. Lighting poles shall also be earthed by connecting to earth mat.
152Fixing of sodium vapour lamps 250 W with fittings, Choke, ignitor etc. of standard quality ISI Mark with water tight elbow fitting etc. complete in all respect and suitable for above street light supports.
153Providing and Laying of 4 x 16 mm2 PVC LT cable from 11/0.4 KV, 63 KVA T/F to L.T. distribution board in switch gear room after digging trench for laying cable and refilling of trench including connections at both ends after providing and crimping of lugs of propersize for completion of work and laying brick over & both sides of L.T. cableafterdigging trench of 0.3 m wide & 0.5 m depth and providing and wearing 75 mm dia G.I. Pipe of 2.5 M length over L.T. Cable complete in all respect.
154Fabrication of L.T. distribution boardof size (1 x 0.75 x 1.4)Mby using M.S. Angle of size (65 x 65 x 6) mm and grouting the stand in ground floor in switch gear room at proper place. 12 mm thick Indian wooden ply with sunmica top will be fixed on the ply frame and frame will be painted by one coat of primer red oxide and two coats of smoke grey paint.
155Construction of 3 phase 5 wireL.T. line for switchyard & control room including, erection, groutingmakingplinth on 8.5 M PCC poles including binding with fittings&grouting of stays.
156Construction of 11 KV Double Poles :
157Erection and grouting of 2 Nos. S.T. Poles 11 m long for making DP Structure including fabrication & fixing of M.S. Channel, M.S. Angle, Providing TPMO Fuse Set, disc. Insulators, composite polymar pin etc. The work includes supply and fixing of necessary clamps with nuts, bolts and washers. The work also includes grouting of Double pole support in C.C. 1:4:8 (cement, sand & brick ballast) in block of size (0.45m x 0.45 x 1/6 length of the pole) including earthing of Double pole with M.S. earthing rod complete in all respect.
158Erection and installation of 11/0.4 KV, 63 KVA T/F on double pole including shifting of the same upto double pole and making of 11 KV connections of Transformer complete the work in all respects.
159Painting of all steel section mounted on the 11 KV Double Poles with one coat of Ready Mix Primer and two coats of I.S.I. marks Aluninium Paints after rubbing with sand paper to the surface of steel section including labour and T&P complete in all respects.
160Construction of Control cable and power cable trench as per details
161Excavation of earth in size 0.650 x 0.40 x 40 m.
162C.C. work in foundation in ratio 1 : 4 : 8 (Cement, sand & Brick Ballast) with proper ramming in size 0.650 x 0.15 Mtr.
163First Class Brick work in cement mortar in ratio 1:4 in size 0.115/0.23 x 0.32 Mtr.
16425 mm thick C.C. in floor of Cable Trench (0.3 Mtr. width) in ratio 1 : 2 : 4 (cement, course-sand and Stone ballast)
165Grouting of M.S. Strip of size 450 x 25 x 6 mm in cable trench 100mm above floor level and at equal space distance 300mm
166Plastering of Trench in Cement, Mortar inration 1:4, 12 mm thick in cable trench.
167Fabrication and fixing cable trench cover of M.S. Angle Iron size 40 x 40 x 6 mm of size 0.3m wide 0.5 to 1.0 mtr. length with proper welding of 8 mm size of bar 2 Nos. in length and 6 Nos. in width as per following-
1680.5 Mtr. long
1691.00 Mtr. long
170Tripping, Single line diagram, Protection and 33/11 KV Sub-Station Board :
171Fixing of tripping board of size (1500 x 900) mm made of Indian plywood of 6 mm thick fitted on wooden frame made of salwood of size (50 x 38) mm. Two support of size 900mm shall be used on back side of board. The frame of the board shall be tapered on the font side and properly finished. The board shall be painted with black enamel paint in two coats after the one coat of primer. The primer paint shall be used in both side. The prescribed matter shall be written neatly with white enamel paint.
172Providing & fixing of single line diagram board for 33/11 KV substations of size (1200 x 900) mm made of Indian Plywood 6 mm thick fitted on wooden frame made of salwood of size (50 x 30) mm. Two support of salwood of size 1200 mm and two supports of size 900 mm shall be tapered on the front side and properly finished, the board shall painted with white enamel paint in two coats after one coat of primer shall be used in both side. The prescribed matter/chart shall be written neatly with red, green and black paint as required.
173Providing and fixing of protection board made of teak wood with white sunmica top of size (300 x 450) mm, duly fitted with good quality ISI mark 3 nos. bells, 3 nos. on-off switches, 3 nos. indication lamps with holders test button switches. The indication lamps for T/F protection board will be mounted on switch gear room wall, which will be duly wired with 3/20 SWG PVC copper wires, complete job with the cost of all materials required.
174Supply, fabrication, erection & grouting of 33/11 KV Sub-Station board of size (0.75 x 1.5) mt, 2.40 mt. high frame of M.S. Angle iron of size (40 x 40 x 6) mm, two cross bracing of M.S. Flat of size (25 x 6) mm shall be fixed with the frame, board shall be mde of 18 SWG M.S. steel of size (0.75 x1.5) mt. shall be fitted in frame with Rivet. Letters should be written by black paint on yellow background.
175Providing Furniture for S/S ( 1 set=Two Nos movable Chair, 2 Nos long Table with drawer 3x 4 feet size , One long Bench three seater, One Stool ,1 No chauki 4x6 feet size wooden make)Godrej/charan make/ISI Mark
176Providing Rubber mat as per RESSPO Size.
177Providing Fire Buckets stand with Buckets (4 No.buckets.)as per RESSPO Size
178Painting of following structure with Rubbing of old rust,1st coat with red oxide primer & two coats with good quality of aluminum paints & 0.5 M on top with post office red paint including cost of all materials and paints :
17933 KV Terminal Gantry/ bus bar gantry
18033 KV Bus isolator & line Isolator structure
18133 KV L.A. structure
18233 KV Postinsulator structure
18333 KV fuse set structure
184Writing of following particulars on 11 KV pannel in English Script in Block letters with white enamel paint including cost of paints.1. Name for feeder on front & back side of pannel, 2. Date of testing, 3. Date of commissioning, 4. Date of Over hauling
185Name of Sub-station woth blue paints on yellow back ground in Hindi script.
186Construction of approach road inside the switchyard 1.5 Mtr wide with1 st class Interlocking brick worktipping complete work including cost of all materials.
18711 KV Line work PART - A- MATERIAL PROVIDED BY CONTRACTOR
18811 KV ‘V’ Type Cross Arm 65x65x6mm, MS Channel
18911 KV Polymer Pin Insulator
190Number Plate
191Danger Board with Clamp
192Barbed wire
193Bolts, Nuts, & Washers
194X-arm clamp with nut bolt for PCC Pole 8.5 mtr with nut bolt by MSflat Iron make
195X-arm clamp with Clamp for ST Pole 11mtr. with Nut and Bolt by MS Flat Iron make.
196Complete Stay (GI Stay rod 16x1800mm, stay wire 7/8 SWG 5 Kg, stay clamp, bolt, nut& washer with concerte grouting)
197MS Earthing Rod 20x2500 mm
19811 KV Polymer Disc Insulator 45 KN B&S Type
199Disc fitting 45 KNB&S Type for Weasel
200P.G. Clamp for Weasel
201‘E’ Bracket for 11 KV
20211 KV T-off Chanel With clamp
203M.S. Angle Iron 65x65x6mm,2700mm long bracing with clamps
20411 KV.Top channel (100x50mmX2240 mm with clamps
20511 KV Guarding angle
206GI Wire 5 mm
20711 KV Guarding angle Clamp with nut bolt forPCC Pole 8.5 mtr./ST Pole 11mtr. with Nut and Bolt by MS Flat Iron make.
208F-bracket with nut bolt for ST Pole 11 mtr & PCC Pole 8.5 mtr with nut bolt by MSflat Iron make
209Alluminium Paint
210Red Oxide Paint
211PART - B-WORK Shifting Loading Carriage & Unloading of following materials from store centre Maharajganj to work site.
212P.C.C. Pole 8.5mtrs. Long.
213S.T. Pole 11 mtrs. Long.
214ACSR Weasel Conductor.
215ErectionofSingle pole structure on 8.5 mtr. PCC Pole including all works ofexcavation of pit, pole erection,grouting in the ratio 1 : 4 : 8 (cement, sand, 40mm brick ballast)back filling of earth,proper ramming & fitting of allaccessories ("V" type cross armclamps with bolt and nut,"F" bracket,composite polymar pin,insulator, danger boardwith clamp,barbed wire earthing,etc.complete) The work includescarriage & handling of all materials from site store to pit site.
216Erection of Double pole structure on 8.5mtr.PCC Pole including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories For Single Circuit (M.S. angle iron bracing with clamps, top channel with clamps, disc isulator B & S type, disc fitting B & S type,composite polymar pin, insulator, P.G. Clamp, "E" bracket, danger board with clamp,barbed wire earthing, etc. complete) . The work includes carriage & handling of all materials from site store to pit site.
217Erection of Single pole structure on 11mtr ST. (SP-55) Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above , grouting in the ratio 1:4:8 (cement, sand, 40mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories( "V" type cross arm 100 x 50 x 6 mm, M.S. Channel (7.9 Kg./M) clamps with bolt and nut, composite polymer pin, insulator, danger board with clamp, Alluminium paint, red oxide paint, barbed wire earthing, etc. complete).
218Erection of Double pole structure on 11 mtr ST Pole including all works of evocation of pit, pole erection, making plinth for poles 30 cm above , grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories ((M.S. angle iron 65 x 65 x 6 mm bracing with clamps, top channel 125 x 65 x 3200 mm with clamps, danger board with clamp, Alluminium paint, red oxide paint, barbed wire earthing, etc. complete)) .
219Making of Sectional T-offPole with all fitting complete work.
220Grouting of stay rods (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing. The work includes supply, carriage & handling of stay from site store to pit site.
221Guarding between two poles like single poles, double poles, four poles, etc. to guard LT, 11 KV Line telephone and river crossing, road crossing etc. with G.I. wire no. 6 SWG and G.I. wire no. 8 SWG, including supply, cutting, fabrication and fixing of guarding channel 75 x 40 x 3010 mm with clamps nut & bolts etc. as per drawing.
222Chopping of branches of trees of eucalyptus, Neem, Keekar and other kind of trees along the route of the line and disposal of the same at suitable place (1 Job = 110 branches/bomboos)
223Laying, spreading, lifting and final sagging of 3 phases of ACSR Weasal conductor in accordance with profile and sag chart including binding, Jumpering and fixing of P.G. Clamp as per requirement in 03 Nos. conductor in parallel. The work includescarriage & handling of all materials from site store to pit site.
224Making H.T. Connections of the proposed line, on to the existing 11 KV line from where line is eminating and another at the end of line to the existing 11 KV line. The work consists of fixing of tension fitting, insulators, jumpering, clamping and binding etc. at the end as per site conditions.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail