Indian Oil Corporation Limited-IOCL has published Tender For Lowering Of Pipe At Ch. 2.05Km Of Three Points Of Magpl (M-A Section) At Nrpl Mathura. Submission Date for this Tender is 08-05-2024. Pipe Laying Tenders in mathura Uttar Pradesh. Bidders can get complete Tender details and download the document.
FileName | File Description | File Size |
8275f9ee-3284-4b10-9add-9b935b6fa258.html | Tender Notice | 0 KB |
BOQ_186900.xls | Tender Document | 0 KB |
FAQs-IOCL-Online-EMD.pdf | Tender Document | 0 KB |
PMJTS24001.pdf | Tender Document | 0 KB |
PPE_Matrix.pdf | Tender Document | 0 KB |
Special_Instructions_to_t_1.pdf | Tender Document | 0 KB |
Tender-Acceptance-Format.pdf | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Lowering of Pipe at Ch. 2.05km of three points of MAGPL (M-A section) at NRPL MATHURA |
2 | Profiling of existing ground of ROW, exposed pipeline before lowering and final lowered pipeline at each 2.0m distance with Total Station machine including labour and all incidental costs & Preparing soft copy & 3 Nos. hard copies of profile. |
3 | Excavation & Backfilling in all types of ordinary & hard soils including hard murrum for exposing the pipeline for lowering including de-watering the excavated pits necessary shoring, strutting including backfilling, stacking selected excavated material for backfilling and/or disposing outside the premises of IOCL as per Special Conditions of Contract, Technical Specifications and directions of the Engineer-In-Charge. The depth of excavation shall be up to 5m and existing pipeline shall be made clear off at least 2.8m to 0.8m underside the pipeline for lowering purpose. The depth may vary due to bund/ heap of earth present on ROW land. Back filling shall be only allowed with soft soil with restoration of site to earlier stage including positioning of top soil. Only manual excavation shall be permitted around pipe (around 400mm distance from pipe surface) |
4 | Refurbishment of Coating & Wrap of pipeline with cold applied tape in case of coating is found damaged as per procedure (IOC will supply Coating & wrapping materials). |
5 | Supply & providing Sand bags as a support snuggly fit under the pipe before lowering with the help of hydra crane, side boom, etc. at every 10.0m distance and lowering the pipeline by puncturing the sand bags and with the help of Hydra/ Side Boom as per Technical Specifications & as per directions of the Engineer-In-Charge. The pipeline shall be lowered as per calculation in accordance with latest edition of API-1117 (Movement of In- Service Pipeline) and approved by the Engineer-In-Charge. |
6 | "The work includes Providing and laying in position empty HDPE cementbags (Good condition & with filled material load bearing strength)filled with cement sand in the ratio 1:10 (1 cement:10 coarse sand),sewing the bags, handling, placing & watering etc. complete as directed by Engineer-In-Charge at washout sites along the pipeline " |
7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 [1 cement : 4 coarse sand (Zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources] |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail