Madhyanchal Vidut Vitran Nigam Limited has published Tender For For Increasing Capacity Of Existing Distribution Transformer And Installation Of New Distribution Transformer Of Various Capacity At Various Places Under Business Paln 2024-25 (Summer Plan) Scheme Under Edd-1 Bareilly. Submission Date for this Tender is 01-05-2024. Distribution Transformer Tenders in Bareilly Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 24-Apr-2024 | 98/EDCB/2023-24 | Date | 01-05-2024 |
FileName | File Description | File Size |
14b6713d-2149-4cd9-a685-33d3a1fa4d4d.html | Tender Notice | 0 KB |
BOQ_1593382.xls | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Tender_form.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | The work of safe carriage of the following material from CB Ganj store center to work siteunder the jurisdiction of EDD-I, Bareilly Approx. distance upto 85 Km. Including safe loading and unloading. |
2 | PCC Pole 8.5 Mtr |
3 | STP 11 Mtr |
4 | ACSR Weasal Conductor |
5 | AB Cable 3x50 sqmm |
6 | AB Cable 3x95 sqmm |
7 | AB Cable 3x120 sqmm |
8 | 11/0.4 KV 3 Phase 250 KVA T/F |
9 | 11/0.4 KV 3 Phase 100 KVA T/F |
10 | 11/0.4 KV 3 Phase 63 KVA T/F |
11 | 11/0.4 KV 3 Phase 25 KVA T/F |
12 | LT Cable 1x120 sqmm |
13 | LT Cable 1x240 sqmm |
14 | LT Cable 3.5x70 sqmm |
15 | Other Line material i.e., 33 KV & 11 KV pin insulater/stay/earthing complete/Disc Fitting/Disc Insulators/Dropper Channel/Crossing Bracing/ Top Channel/Binding Wire/Danger Board/Barbed Wire/numberplate/stone pad/Control Cable etc |
16 | Construction of T/F plinth 1.5x1.5x2 m3 for mounting 250 KVA T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect |
17 | Cage fencing of 250 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattleaccidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5"(L)x5"(W)x8’(H) by strenghtening of wire mesh 20x3 mm M.S. flat haorizentally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation. |
18 | Pipe Earthing of Transformer (By boring of 4 inch diameter 20 m deep, 40 mm diameter A class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5 m length is inserted at the bottom. Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture.To complete the work Contractor will provide all material, Manpower, T&P, safe carriage of material to worksite.Above work will be carried out under supervision of concerned JE/SDO/EE) |
19 | Dismentaling of 100 KVA Transformer as per norms complete in all respect |
20 | Dismentaling of 16 KVA Transformer as per norms complete in all respect |
21 | Dismentaling of 10 KVA Transformer as per norms complete in all respect |
22 | Mounting of 250 KVA T/FTransformers as per norms complete in all respect - |
23 | Mounting of 100 KVA T/FTransformers as per norms complete in all respect - |
24 | Mounting of 63 KVA T/FTransformers as per norms complete in all respect - |
25 | Mounting of 25 KVA T/FTransformers as per norms complete in all respect - |
26 | Installation of 11 KV Fuse set unit to be installed on midway of 11 KV Double Pole Structure Complete in all respect |
27 | Erection of Single/Double pole in H.T/L.T lines including fitting of all accessories as per RESSPO Norms |
28 | PCC Pole 8.5 Mtr (Single) |
29 | STP 11 Mtr (Single) |
30 | PCC Pole 8.5 Mtr (Double) |
31 | STP 11 Mtr (Double) |
32 | Grouting of following Pole with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms |
33 | PCC Pole 8.5 Mtr (Single) |
34 | STP 11 Mtr (Single) |
35 | PCC Pole 8.5 Mtr (Double) |
36 | STP 11 Mtr (Double) |
37 | Laying of LT Cable 1x120 sq mm complete in all respect |
38 | Laying of LT Cable 1x240 sq mm complete in all respect |
39 | Laying of LT Cable 3.5x70 sq mm complete in all respect |
40 | The work of Driving the earthing electrode and making connections with 6 S.W.G. GI wire as per RESSPO Norms |
41 | Laying, Stringing & Sagging of Following Conductor complete in all respect |
42 | ACSR Weasal Conductor |
43 | AB Cable 3x50 sqmm |
44 | AB Cable 3x95 sqmm |
45 | AB Cable 3x120 sqmm |
46 | The work of digging of pits, erection of Stay Clamp, Insulator etc. |
47 | Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. |
48 | Fixing of 3 Pahse Distribution Box complete in all respect |
49 | Supply and Fixing of Following Material as per RESPO norms complete in all respect (would be Provided by contractor through approved vendors of Discom at his own cost) |
50 | Stone Pad 300x300x75 mm |
51 | Danger Board With Clamp |
52 | Barbed Wire |
53 | Aluminium Lug 70 sqmm with Nut&Bolt |
54 | Aluminium Lug 120 sqmm with Nut&Bolt |
55 | Aluminium Lug 150 sqmm with Nut&Bolt |
56 | Aluminium Lug 240 sqmm with Nut&Bolt |
57 | Tailless Unit 400 Amp |
58 | Tailless Unit 600 Amp |
59 | Holding Clamp for S/s |
60 | Distrinution Box Clamp |
61 | Stay Clamp |
62 | LT Clamp with Nut & Bolt |
63 | Stay Insulator |
64 | PG Clamp |
65 | Piercing Connector |
66 | LT Shackle Insulator |
67 | Cost of Nut & Bolt for Shackle Insulator |
68 | Earthwire Clamp |
69 | LT T-Off |
70 | X Arm Holding Clamp |
71 | F Clamp With Nut & Bolt |
72 | Safe back carriage of Following item (if any) from work siteto C.B. Ganj store Bareilly approx distance upto 85 Km including loading & unloading. |
73 | 11/0.4 KV 3 Phase 100 KVA T/F |
74 | 11/0.4 KV 3 Phase 16 KVA T/F |
75 | 11/0.4 KV 3 Phase 10 KVA T/F |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy