Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Various Site Existing 11 Kv Feeder Line Old And Jar Jar Conductor Replacement Work In Business Plan 2024-25, Under The Work Area Of Executive Engineer, Electricity Distribution Division-I, Muzaffarnagar, Under The Business Plan 2024-25,Replacem. Submission Date for this Tender is 23-04-2024. Feeder Pillar Tenders in Muzaffarnagar Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) |
2 | PCC Pole 8.5 Meter |
3 | ST Pole 11 Meter |
4 | ACSR Weasel Conductor |
5 | ACSR Rabbit Conductor |
6 | 11 KV XLPE CABLE 3x185 Sqmm |
7 | 11 KV OUTDOOR CABLE JOINTING KIT 3x185 Sqmm |
8 | LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.) |
9 | Complete work of installing the electrical material received from the store center at the site. |
10 | Complete work of Laying/Installing ACSR WEASEL CONDUCTOR on the Established electric poles installed as per RESPO norms. Including opening / dismantling of old / damaged conductor of the line |
11 | Complete work of Laying/Installing ACSR RABBIT CONDUCTOR on the Established electric poles installed as per RESPO norms. Including opening / dismantling of old / damaged conductor of the line |
12 | Complete work of UNDERGROUND Laying / Installing 11 KV XLPE CABLE 3x185 Sqmm on the site as per RESPO norms. |
13 | Complete work of Laying / Installing 11 KV XLPE CABLE 3x185 Sqmm by Installing G.I. Pipe (12 Mtr.) on the Established electric poles installed as per RESPO norms. |
14 | Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be payable by the Contractor/Firm. |
15 | Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be payable by the Contractor/Firm. |
16 | Work of Fixing/Installing Double Pole by installing 01 no. additional PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be payable by the Contractor/Firm. |
17 | Work of Fixing/Installing Single Pole of the ST Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be payable by the Contractor/Firm. |
18 | Replace Damage V-Type Cross-Arm to New 11 KV V-Type X-Arm Fixing/installation on Established Single Pole of Line As per the RESPO standards. |
19 | Complete work of installation of Stay Set Complete on Established Double pole & Single Pole of Line As per the RESPO standards. |
20 | Complete work of Installing and Commissioning of 11 KV OUTDOOR CABLE JOINTING KIT 3x185 Sqmm as per RESPO standards. |
21 | Complete work of Pole concreting on Established Double Pole / Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be payable by the Contractor/Firm. |
22 | Complete work of Pole Guarding by installing G.I.Wire and MS Angle on Established Pole as per RESPO standards. In which necessary decentralized material will be payable by the Contractor/Firm. |
23 | Complete work of cutting and Chopping the branches of tree standing between the lines established on the site. |
24 | Supply of NUT & BOLT as per RESPO standards |
25 | Supply of F-BRACKET as per RESPO standards |
26 | Supply of X-ARM HOLDING CLAMP as per RESPO standards |
27 | Supply of CLAMP as per RESPO standards |
28 | Supply of GI Pipe 6" DIA as per RESPO standards |
29 | SUNDRIES ITEMS |
30 | As per rules, the work of delivering the old material includes loading and unloading on both sides from the site to Store Center Muzaffarnagar. |
31 | ACSR CONDUCTOR (OLD & USED / SCRAP) |
32 | ST POLE DAMAGE |