Madhyanchal Vidut Vitran Nigam Limited has published Tender For Installation Of New Distribution Transformer In The Area Of Electricity Distribution Division-Sandila Under Business Plan 2024-25. Submission Date for this Tender is 02-05-2024. Distribution Transformer Tenders in hardoi Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 23-Apr-2024 | DateE222 | Date | 02-05-2024 |
FileName | File Description | File Size |
23231c31-495b-45d9-932a-bca9a70b5fd5.html | Tender Notice | 0 KB |
BOQ_1593262.xls | Tender Document | 0 KB |
TD163.pdf | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Safe carriage, loading-unloading with proper stacking of following material from store centre to pit site/JE dump store. |
2 | P.C.C. /ST Pole 8.5/11 mtr long |
3 | 11 KV Pin Insulator with Pin |
4 | 11 KV Disc Insulator with fitting |
5 | ACSR Weasel Conductor |
6 | Earthing Rod |
7 | Stay Set |
8 | G.I. Wire 6/8/10 SWG |
9 | ABC Cable (3×50/3x95/3x120) mm2 |
10 | LT XLPE Cable Aluminum 3.5×400mm2 |
11 | LT XLPE Cable Aluminum 1×240mm2 |
12 | 100 KVA T/F |
13 | 250 KVA T/F |
14 | Line Meterial |
15 | Distribution Box 3-phase |
16 | Work |
17 | Erection of PCC/ STP 8.5/11mtr long single pole with Grouting & with all accessories for LT line or 11 Kv line(Only Pole and Insulator Supplied by department) |
18 | Erection of PCC/ STP 8.5/11mtr long double pole with Grouting & with all accessories(Only Pole and Insulator Supplied by department) |
19 | Grouting and Nozzling of 11 KV stay set complete including fixing of necessary clamps. Accessories required including its grouting by civil material (sand, brick blast & cement). All material except stay wire shall be supplied by the contractor. |
20 | Ordinary earthing by 11 KV MS earth Rod 2500 mm long as per RESPO schedule. All material except earthing rod shall be supplied by the contractor. |
21 | Laying of LT XLPE Cable of different size |
22 | Earthling by way of Boring and lowering the "B" class GI pipe (Gindal ) of 50mm dia from ground upto water level not less than 20mtr as per standard practice |
23 | Placement of 11/0.4 KV T/Fs from dump place to newly constructed T/Fs plinth & installation, commissioning of 100/250/400/630 KVA T/Fs of T/FPlinth and including jumpering with the system ( Alltherequiredmartial for abovejob shall be provided by contractor except T/Fs) |
24 | Stringing & Sagging of three phase 11 kv line |
25 | Stringing & Sagging ABC |
26 | Installation & commissioning of Distribution Box for ABC Bunch Conductor |
27 | Looping & chopping of tree branches for clearance of HT/LT line after clearance of line throughout pieces of tree branches of site |
28 | Supply & Fixing of LT Fuse unit for 250 & 400 With Grout (All Material Arrange by Contractor at his own cost) |
29 | Supply and Fixing of HT Fuse Set |
30 | Concreating of Pole |
31 | Construction of toe wall around the 11/0.4 kv S/S, fuse unit size 0.75 Mt. At Base and 0.23 Mt. At top as per RESSPO Normsby lst class bricks in the ratio 1:6, Base concreting of the wall to be done in ratio 1:6:12 and plaster 12 mm thick in ratio 1:4.& fabrication of fencing with wire mesh 10SWG(37mmx50mm)(all material to bearranged by contractor). |
32 | Construction of T/F plinth of size 2x2x1.5 m on a padding 0.25M deep in ground 1:5:10 cement sand and brick ballast on the top of padding brick work Ist class brick of 0.95 mtr height & 0.35 mtr wall will be constructed. Rest wall should be 0.23 mtr thick. Brick work in ratio 1:4 cement & cores Sand in the hollow portion the sand should be filled from the ground level up to 15 centimetres below from the top of wall, Cement, sand & brick Ballasts should be filled up to 15 centimetre. Two no. of channel 100x50 in length 1500mm will be grouded.0.35 CM.RCC will be done with cores sand, cement and stone ballast in the ratio of 1:2:4.The T/Fs plinth should be plastered on all sides 12mm thick in ratio 1:6 by cement and cores sand.(All the material to be arranged by the contractor). |