}

Tender For Increasing Capacity Of Distribution Transformer And Installation Of Additional Transformer In Business Plan Under Edd-Iv, Syana., bulandshahr-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Increasing Capacity Of Distribution Transformer And Installation Of Additional Transformer In Business Plan Under Edd-Iv, Syana.. Submission Date for this Tender is 24-04-2024. Distribution Transformer Tenders in bulandshahr Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43181276
Tender For Increasing Capacity Of Distribution Transformer And Installation Of Additional Transformer In Business Plan Under Edd-Iv, Syana.
Open Tender
Indian
Uttar Pradesh
bulandshahr
24-04-2024

Tender Details

Tender For Increasing Capacity Of Distribution Transformer And Installation Of Additional Transformer In Business Plan Under Edd-Iv, Syana.

Key Value

Document Fees
INR 3540 /-
EMD
INR 25000.0 /-
Tender Value
INR 24.74 Lakhs /-

BOQ Items

Name of Work : fufonk la0&93@2023&24@fo|qr forj.k [k.M&prqFkZ] L;kuk ds vUrxZr vUrxZr forj.k ifjorZdksa dh {kerko`f) djuk vfrfjDr ifjorZd yxkuk ,oa vU; dk;ZA
Sl. No. Item Description
1Carriage of fallowings from ESC BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 Km. approx.
2STP Pole 13 Mtr Long
3PCC Pole 11 Mtr Long
4Pcc Pole 8.5 Mtr Long
5Carriage of ACSR Weasal/Dog Conductor, AB Cable, LT XLPE Cable, G.I. Wire, 11 KV XLPE Cable, 33 KV Disc Insulator with fitting & 11 KV Disc insulator with fitting, 33 Pin Insulator with pin & 11 KV pin insulator with pin, 33 KV V-Type X-arm & 11 KV V-Type Cross Arm, M.S. Channel-Angle, Earthing Rod, Stay Set Complete & Etc as per RESPO Norms.
625 KVA Transformer
763 KVA Transformer
8100 KVA Transformer
9250 KVA Transformer
1010 KVA Single Phase TF
11The following meterial Erection & Fixing as per RESPO manual. It including the cost of labour, T&P, Carrier etc. required for proper completion of work.
12Single support on PCC pole 8.5 Mtr. Long with all accessories.
13Single support on STP Pole 13/PCC 11 Mtr Long with all accessories
14Making of D/P for T/F on PCC pole 8.5 Mtr. Long.
15Grouting concreting & Plinthing of STP/Pcc Pole as per RESPO norms.
16Fixing erection & grouting of Stay set complete with binding & Nozzling of Stay wire.
17Earthing of supports with the help of Earthing rod & GI wire/Earth wire.
18Laying stringing & sagging of Dog conductor in 3 phase
19Laying stringing & sagging of Rabbit conductor in 3 phase
20Laying stringing & sagging of Weasal conductor in 3 phase
21Laying stringing & sagging of 11 KV 3x120 sq mm XLPE Cable
22Laying stringing & sagging of LT XLPE Cable 3.5x240 sq mm
23Laying stringing & sagging of AB Cable (3X50 + 1X35+1X16) sq.mm
24Laying stringing & sagging of AB Cable (3X95 + 1X70+1X16) sq.mm
25Laying stringing & sagging of AB Cable (3X120+1X95+1X16) sq. mm
26Installation of 25 KVA Transformer
27Installation of 63 KVA Transformer
28Installation of 100 KVA Transformer
29Installation of 250 KVA Transformer
30Installation of 10 KVA Single Phase TF
31Making of Plinth of 250 KVA Transformer.
32Earthing of 250 KVA T/F water level
33Fencing of 250 KVA T/F
34Laying stringing & sagging of G.I. Wire 3.15 mm 10 SWG
35Laying stringing & sagging of G.I. Wire 4 mm 6 SWG
36Fixing of Gurding M.S. Angle 65x65x6mm)/1.6 meter
37Installation of Distribution Box
38Providing & Fixing of the following material by the Contractor as per UPPCL/RESPO Rules.
39Gurding M.S. Angle 65x65x6mm)/1.6 meter
40Distribution Box
41MS Channel (Dropper) 100x50x2028
42MS Angle 75x75x6x2028 mm
43M.S. Top Channel (125x65x2240 mm)
44MS T-off Channel 125x65x1300 mm
45F-Clamp
4611 KV Cross Arm Holding Clamp
4733 KV Cross arm Holding clamp
48Danger Board with Clamp
49Grouting of Pole
50Stone Pad
51Clamps for D.B. (40x6 mm)
52Clamps for 10 KVA T/F (75x8 mm)
53Clamp for D/P with Nut & Bolt
54DEAD END CLAMPS WITH I-HOOK (INSULATED)
55LT PIERCING CONNECTOR
56SUSPENSION CLAMPS WITH I-HOOK (INSULATED)
57Clamp for Gurding MS Angle
58Earthing Rod
59The fallowings matarial dismantalling & Carriage from site to ESC BSR including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 Km. approx.
60ACSR Weasal/Rabbit Conductor (Scrap) -
61G.I. Wire (Scrap) -
62XLPE/AB Cable (Scarap / Old And Damaged)
63ST POLE 11 MTR LONG (Iron scrap)
641. Nut, Bolt, Clamps and others necessary items should be provided by contractor. 2. T and P should be and other necessary machinery should be provided by contractor. All work will be done as per UPPCL/RESPO Rules.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail