Uttar Pradesh Power Transmission Corporation Limited-UPPTCL has published Tender For Supply And Replacement Of Mog And Aircel For 40 Mva T/F-I At 132 Kv S/S Kaudihar Under Etd-I, Prayagraj.. Submission Date for this Tender is 03-05-2024. Transmission Line Tenders in Allahabad Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 24-Apr-2024 | date extension T-06 | Date | 03-05-2024 |
FileName | File Description | File Size |
6225fb06-db39-4fdd-aae5-b70ff5f902c4.html | Tender Notice | 0 KB |
BOQ_1593313.xls | Tender Document | 0 KB |
TD.pdf | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Supply of MOLG with rod and float 250mm dia for main conservator tank of 40 MVA Transformer-Ist ( Technical Associatesmake) at 132 KV SubstationKaurihar Prayagraj. |
2 | Supply of MOLG with rod and float150 mm dia for main conservator tank of 40 MVA Transformer-Ist ( Technical Associatesmake) at 132 KV SubstationKaurihar Prayagraj. |
3 | Supply of flexible nitrile rubber Aircel of 2 mm thickness and replaced by dismantling of all connected pipe lines and removed of conservator tank from 40 MVA transformer-Istbody to ground after draining oil from conservator tank, then opening of inspection cover and replacement of damaged air cell by new, fixing of all inspection cover of conservator with new 10 mm gasket ( provided by contractor ) then commissioning of Aircel , riffling of oil upto mark then erection of conservator on 40 MVA T/F-I by re-fixing of all connection pipe lines. |
4 | Replacement of defective MOLG with rod and float of main & OLTC conservator tank by new and also replaced gasket of size 10 mm. |
5 | Dismantling of all connected pipe lines and removed of conservator tank from 40 MVA T/F-I body to ground after draining oil from conservator tank, then opening of inspection cover and repairing of damaged air cell by making puncture , fixingof all inspection cover of conservator with new 10 mm gasket ( Provided by contractor ) then commissioning of Aircel, riffling of oil upto mark then erection of conservator on 40 MVA T/F-I by re-fixing of all connection pipe lines. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail