Indian Rare Earths Limited-IREL has published Tender For Renovation Of Existing Monazite Plant Area (Providing Rcc Drain And Flooring) In Connection With The Up Grading Of Monazite Recovery Plant At Irel Chavara. Submission Date for this Tender is 06-05-2024. Drainage Tenders in chavara Kerala. Bidders can get complete Tender details and download the document.
FileName | File Description | File Size |
cc5c07a4-da8f-4e2f-99cb-c692b0104876.html | Tender Notice | 0 KB |
BOQ_211928.xls | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Demolishing cement concrete floor in Monazite plant area for drainage and collection pit etc.including clearing away the debris within a distance of 150 M etc. all labour charges, tools and plants etc. complete as per standard specification |
2 | Supplying & PlacingRMCM-25 (Cement 350Kg/M3) mix for Floor concrete etcincluding all cost and conveyance of RMC with add mixtures,hire charges for concrete motor pumps and boom placers,shuttering materials, all labour charges, watering, curing etc.complete as per standard specification but excluding cost ofMS reinforcement. (Concrete should becompacted with mechanical/electric vibrator) RMC M-25 Concrete Specification: Grade: M35, Mix Ratio: Approximately(FineAggregates 768 kg/M3 :Coarse Aggregates ( 20mm744 kg/M3& 12 mm496 kg/M3), Characteristic Compressive Strength: 20 MPa (After 28 days), Cement Type: Portland Cement 53 grade (Type OPC or similar), Maximum Aggregate Size: Typically 20mm, Water-Cement Ratio: As per mix design Admixtures: As per mix design (if required), Workability: Slump value as per project requirement Costs and Services: Material Cost & Conveyance: The material cost at the work site, within IREL premises, covers essentials such as cement, aggregates, water, and any necessary admixtures. The item rate includes the transportation of RMC from the batching plant to the IREL construction site in Transit mixers and it should be clean, in good working condition, and capable of preventing segregation of the concrete during transportation. Concrete Motor Pump & Boom Placer Hire Charges: Concrete placement requires the use of concrete motor pumps and boom placers. The hire charges & operational charges & all other charges are included in the Contractor"s quoted rates. Testing and Certification: To guarantee quality and adherence to specifications, RMC test certificates shall be submitted. These certificates outline mix proportions, compressive strength, and other pertinent properties. The cost associated with testing and certification may be incorporated into the in the Contractor"s quoted rates. It is important to note that IREL does not entertain any price escalation beyond the initially quoted rates at any circumstances such influenced by market dynamics, raw material prices, and other relevant factors. THE BIDDER SHOULD BE GO THROUGH THE SPECIAL CONDITIONS OF THE CONTRACT (SCOC) FOR THE AWARENESS BEFORE QUOTED THEIR RATES |
3 | Reinforced Cement concrete1:2:4 using20mmhardbrokenstoneforSide wall, drain, Rcc cover slab etc at all heights and levelsincludingcost& conveyanceofall materials, all labour charges for shuttering,boxing, mixing, placing, ramming, curingandhirechargesfor all tools and plants vibrator, scaffoldingetccomplete as perstandard specificationbutexcludingcost of cement & MS reinforcement. |
4 | MS reinforcement (FE 550 - Make: TATA, JSW, VISAK) bent, tied and placed in position for all RCC works using approved make at all heights & levels including all cost and conveyance of MS bars & binding wire, loading unloading charges, , all labour charges for straightening, cutting, bending, binding with approved annealed binding wires or welding wherever required etc.complete as per std. Specification. |
5 | Plastering in cm 1:3, 15mm thick one coat at all heights and levels floated hard and troweledsmooth including all cost and conveyance of materials, water proofing admixtures and labour charges, providing necessary scaffolding, watering and curing etc. complete as per standard specification but excluding cost of cement. |
6 | Sundry and petty repair worksMan mazdoor |
7 | Supply & stacking ISI mark best qualityPortlandcement (OPC/PPC) approved make in paper bag including all cost and conveyance of materials, loading & unloading charges, stacking at suitable place for consuming as and when required etc. complete as per standard specification(Payment will be made only for actual quantity of cement consumed) |