| 1 | Particulars |
| 2 | Providing and fixing of MS Pipe Confirming to IS -1239 (2004), Class \"C\" Heavy DN-25 Seamless (Pt-I) Length 4 to 7 Meter each of PCS, OD 33.80 mm with 4.05 Thickness +/- 10% plain end with the Manufacturers Certificate complete in all respect as per the directions of Officer-in-charge. |
| 3 | Providing and fixing of Ball Valve (SW) DN-15 (L and T L3 FBTC) Hand Lever Operated Screwed end 3 Pcs design full bore renewable Teflon Seat Cast Steel Body Ball Valve (MOC - 316 CF8M) Cast Steel (ASTM A216 grade WCB), complete in all respect as per the directions of Officer-in-charge. |
| 4 | Providing and fixing of Schedule 40 MS Seamless Elbow 90% 25mm Size With 3mm thickness pipe fitting welded, MS butt-weld Fitting, complete in all respect as per the directions of Officer-in-charge. |
| 5 | Providing and fixing of SS Pressure Gauge 4\" Dia H Guru 7(Kg) Dial Size - 63 mm which give you clear info. Pressure measuring range - 100Psi with calibration certificates, complete in all respect as per the directions of Officer-in-charge. |
| 6 | Providing and fixing of MS Socket 10mm Seamless Schedule 40 1000Lbs threaded size 10mm-3/8” pipe fitting, complete in all respect as per the directions of Officer-in-charge. |
| 7 | Providing and fixing of MS Adapter 10mm 3/8” Size with both side threaded fitting mild steel, complete in all respect as per the directions of Officer-in-charge. |
| 8 | Providing and fixing of MS Angle support material Size 32mm/4mm or the clumps 25mm Size for hanging the Pipe on the wall, complete in all respect as per the directions of Officer-in-charge. |
| 9 | Providing and fixing of MS 10mm fastener heavy rawl gitti, complete in all respect as per the directions of Officer-in-charge. |
| 10 | Providing and fixing of Rubber hose Pipe for connection the MS Pipe to the Burner (1.5m), complete in all respect as per the directions of Officer-in-charge. |
| 11 | Providing and fixing of Vanas regulator for Gas Control with valve converting and holding the Pressure 7 To 2 Bar as the Burner requirement, complete in all respect as per the directions of Officer-in-charge. |
| 12 | Providing and fixing of Gas Cylinder Bank Regulators for switch On and Off with Non-return valve 1187 UE” Hp Adaptor multi lock bearing aluminium Die Cast Size 25.6mm, complete in all respect as per the directions of Officer-in-charge. |
| 13 | Providing and applying Two or more coat over all pipes etc. and including priming coat of enamel paint of approved make and shade, complete in all respect as per the directions of Officer-in-charge. |
| 14 | Processing for the Testing of Nitrogen or CO2 for finding the leak point in the pipe line and the Safety Purpose or clear the dust from the pipe line, complete in all respect as per the directions of Officer-in-charge. |
| 15 | Making necessary arrangements for Third Party Inspection of all pipes line/Gas Bank System and provide the Certification for Fire safety approved by competent authority. |