}

Tender For Annual Maintenance Of Lawn, Cleaning Of Water Tanks, Storm Water Drains, Roads, Water Table, Etc. In Nddp-Augf Complex At Kalpakkam For The Year 2024-2025., kalpakkam-Tamil Nadu

Indira Gandhi Centre For Atomic Research-IGCAR has published Tender For Annual Maintenance Of Lawn, Cleaning Of Water Tanks, Storm Water Drains, Roads, Water Table, Etc. In Nddp-Augf Complex At Kalpakkam For The Year 2024-2025.. Submission Date for this Tender is 01-05-2024. Drainage Tenders in kalpakkam Tamil Nadu. Bidders can get complete Tender details and download the document.




Tender Notice

43173846
Tender For Annual Maintenance Of Lawn, Cleaning Of Water Tanks, Storm Water Drains, Roads, Water Table, Etc. In Nddp-Augf Complex At Kalpakkam For The Year 2024-2025.
Open Tender
Indian
Tamil Nadu
kalpakkam
01-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Annual Maintenance Of Lawn, Cleaning Of Water Tanks, Storm Water Drains, Roads, Water Table, Etc. In Nddp-Augf Complex At Kalpakkam For The Year 2024-2025.

Key Value

Document Fees
Refer document
EMD
INR 68480.0 /-
Tender Value
INR 34.24 Lakhs /-

Attachment

FileName File Description File Size
8f0a783b-ff12-457f-9dda-f74c57a0edac.html Tender Notice 0 KB
1988FormsACDFGHforfilling_1.xls Tender Document 0 KB
1988part1technicalbid.pdf Tender Document 0 KB
1988Undertakingsandformof_2.pdf Tender Document 0 KB
BOQ_845055.xls Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

Name of Work : Annual maintenance of lawn, cleaning of water tanks, Storm water drains, roads, water table, etc. in NDDP-AUGF Complex at Kalpakkam for the year 2024-2025.
Sl. No. Item Description
1Maintenance of lawn ground cover, climbers, shrubs, etc., by watering daily, satisfactorily, weeding, cutting of thatch areas in the lawn, earthling up near the root one of plants rejuvenation as per requirement in the existing landscaped areas, running lawn movers, application of chemicals / fertilizers to lawn / plants preparation of the area for planting of seasonal,Collecting the cut grass, fallen leaves ,clearing of garden waste and disposing of to the dumping yardwith a lead of 3 KM, spreading / filling of red earth, farm manure in area as per the directions and specifications of the Engineer-in-Charge.(Tools & sufficient garden watering hose pipe, etc., have to be procured by the contractor himself.) Note:-a). The contractor shall engage minimum 3 Nos. Male gardeners,8 Nos. Female gardeners andfor maintenance of the landscaped areas excluding Sundays & national holidays.b)Garden waste to be collected and removed including transporting and dumping the waste to the directeddumping yard/ places.
2Supplying and stacking good quality red earth free from stone, inert matter, breaking the clods, spreading / filling the red earth, mixing with manure, etc., complete all as per the specification and as directed by the EngineerIn Charge.
3Supplying and stacking good quality dry farm yard / manure free from inert matter like stones, grasses, sand, etc., including mixing with red earth, spreading wherever required places, filling the areas, pits, etc., complete all as per the specifications and as directed by the EIC
4Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately)
5Development of lawn including 150 mm digging and levelling the surfaceof earth area, cleaningexisting weeds and plants including roots , Collection , supply and planting ( dibbling method 1: 4)Korean grass of good qualityincluding cost of koreangrass, conveyance and planting and watering for 2 monthsetc all as directed by the Engineer in Charge .
6Earthwork in excavation necessary for Lawns and Compost piutetc. including dressing, trimming and compaction the cut formation in accordance with requirements of lines, levels, cross fall etc. all complete as per specifications and disposal of all cut surplus / unsuitable materials and stacking of suitable materials with all lifts and lead up to 50metres as perspecification for road works and as directed by the Engineer.
7Supply and spreading of fertilizer (urea / DAP), neem cake including cost of fertilizer and neem cake etc., all as per specification at the rate of 0.01kg/sqm for fertilizer and 0.005kg/sqm of neem cake, all as directed by the Engineer-in-charge.
8Removing the heavy / light jungle using JCB by dozing the ground level, uprooting small trees, collecting, removing and stackingjungle waste separately and disposing off with a lead of 4 kilometres etc complete as directed by EIC. Payment will be made on the running hours of the JCB at site. ( Only Actual working Hours alone will be paid)
9Area cleaning/ Clearing the light jungle whenever and wherever required consisting of thorny bushes, velikathan saplings, wild growths and all other growth, collectingand disposing the cut away materials to the far off place with a lead of 4.0 km and burning them with prior approval of the departmental Engineer and all safety measures as directed by the Engineer
10Providing and laying the following sizes PVC water supply line with "Finolex / Varun / Truebore" or approved equivalent make PVC pipes suitable for 6 kg/sq.cm pressure and specials confirming & marked to to IS:4985 including jointing with PVC jointing compound, laying and fixing the pipes in the excavated trenches, cost of all types of specials such as tees, reduces, coupler, reducing bushes, threaded adaptor, elbow, tail pieces, caps etc., and testing the line as directed by the Engineer-in-Charge.
1150mm outer dia PVC pipe
1225mm outer dia PVC pipe
13Supply & fixing of 20mm full circle, radius 6 to 8 Metre spraying capacity standard angle brass sprinkler of approved make made as per IS: 12232 Part 1 specification to the garden water supply line as directed by Engineer-in-charge.
14Supplying and fixingStainless steel BALL VALVE of following sizes (PLATO make or approved) heavy qualityin PVC / GI line with for regulating the water supply line from the main including necessary tool and plants for fixing, threads, solution, etc. complete all as directed by the Engineer- in- Charge.
1550mm Stainless steel BALL VALVE
1640mm Stainless steel BALL VALVE
1725mm Stainless steel BALL VALVE
1820mm Stainless steel BALL VALVE
19Supply and planting following ornamental plants / flowering plants / shrubs of good quality and healty appearance, includingtransporting, planting with initial watering all as per standard practice and as directed by the Engineer.
20Alamanda ( 30cm height) yellow colour
21Bouganvillea Varieties ( 45cm Height)Multicolour
22Supplying and planting of trees in good quality sapplings from approved nurcery including transporting the plants loading and unloading the plants etc. as directed by the Engineer. Note : The plant / tree sample should be approved by the Engineer. The height of the plants 1.5 meter
23Disposal of swept materials, packing materials, wooden waste, waste papers & materials from the dust bin as shown to dumping yard up to 3.0 KM lead by using tractor / lorry including cost of loading and unloading etc complete.
24Trimming of tree branches, which causing hindrance to free vehicle movement, blocking street light and touching the building etc., on road sides,streets and near buildings, including cutting the branches of trees usingnecessary tools, collecting, transporting and disposing them at places shown by the department using their own means of conveyance all as directed by the Engineer -in-charge.
25Beyond 300mm upto and including 600mm Girth Trees
26Beyond 600mm upto and including 1200mm Girth Trees
27Cutting and Removal of unwanted / dried trees of following girth (measured at a height of 1m above ground level) including cutting of tunks, branches , removing the roots , stacking of serviceable materials and disposal of unserviceable materials including filling the pits and depression, etc., all as directed by Engineer-in-charge.
28Beyond 300mm upto and including 600mm Girth Trees
29Beyond 600mm upto and including 1200mm Girth Trees
30Conveyance of fallen trees / branches during monsoon / Cyclonic period / as and when required from road side to dumping yardwith in a lead of 1km including cutting the fallen branches / trees, loading and unloading by using mechanical means like JCB, Tractor, stacking the wood at dumping yard , etc., including hire cost of tractor , driver , manpower for loading and unloading , etc., all complete as directed by the Engineer-in-charge.
31Carrying outdoor fogging operation with hand operated thermalfogger for controlling mosquito menaceusing Deltamethrin chemical at the rate of 30 ml mixed in 3 litres of diesel and fogging all around the building and other open areas of entire plant area at required intervals as directed by the Engineer-in-charge . (The rate shall include cost of chemicals, labours, tools & Plants, transportation etc. all complete)
32Providing and spraying indoor residual spray against Mosquito and other insects by using Cyfluthrin chemical or other approved chemicals diluted at the rate of 10 ml per litre of water and spraying with suitable sprayer inside and surroundings for all types of buildings as directed by the Engineer-in-charge.
33Clearing the Strom water drain once in 3months and when and wherever required including collection of all unwanted leaves, small plants, silt and other unwanted debris materials upto 200m etc.,and stacking for disposal upto 200m leadetc complete as directed by the Engineer-in-charge. - 500mm to 1000mm wide with cover slab Note: 1. Every time cleaning area shall be measured for payment.2. The contractor shall engage minimum 2 numbers of workers daily as directed by the Engineer-in-charge. Failure to deploy the minimum numbers of labour will attract recovery with the minimum wages for every default of labour. 3. The contractor shall supply the necessary PPE to the workers.
34Clearing the Strom water drain once in 3months and when and wherever required including collection of all unwanted leaves, small plants, silt and other unwanted debris materials upto 200m etc.,and stacking for disposal upto 200m leadetc complete as directed by the Engineer-in-charge. - 500mm to 1000mm wide without cover slab Note:1. Every time cleaning area shall be measured for payment.2. The contractor shall engage minimum 2 numbers of workers daily as directed by the Engineer-in-charge. Failure to deploy the minimum numbers of labour will attract recovery with the minimum wages for every default of labour. 3. The contractor shall supply the necessary PPE to the workers.
35Cleaning and disinfection of RCC / PVC Over head water tanks upto a height of 2 metre by mechanized method with following operations in various stages including all tools, materials, fuel, labour, safety belts, helmets, safety shoes, safety goggles, gloves, closing / opening of the scour valve , removing / refixing the manhole cover in position , etc., all complete as per specifications at all lifts and as directed byEngineer-in-charge. Cleaning process :1) Dewatering wherever required for Over head tanks.2) Sludge removal with sludge removal equipment and flush the floor of tank / sump.3) Cleaning the walls , ceiling and floor of the tank / sump to remove all germs , bacteria and calcination by using High pressure rotary water jet cleaning equipment.4) Vacuum cleaning with industrial vacuum cleaner to completely remove the dirt to make the tank / sump totally clean. 5) Sterlization / disinfecting the tank / sump by spraying a Biodegradable anti- bacterial spray of approved make and dilution shall be as per manufacturer instructions with rotary jet pumps. 6)Radiation treatment of the tank using UV radiation to completely destroy the all floating bacteria to make water tank / sump thoroughly clean . Duration of UV treatment shall be between 1 min to 10 mins depending on the size of tank as approved byEngineer-in- charge. Note:1)Care and all precautionary measures shall be taken to avoid asphixation while cleaning .2) Power required for operation of pumps and equipments will be provided at free of cost from Department supply. However contractor shall make their own arrangement to tap the supply from DB / Power points near by location. 3) The labourers engaged for cleaning the water storage tanks / Sintex tanks / reservoirs/ sumps shall obtain the medical certificate by DAE Hospital before attending the work.
36Over head tanks20 to 22.50 Kilo Litre capacity
3713.00to 15.00 Kilo Litre Capacity
388.00 to 9.00 Kilo Litre Capacity
392.00 to 3.00 Kilo Litre Capacity
401.50 to 2.00 Kilo Litre Capacity
41Cleaning the sun shades roof gutters/ rain water gutters at all levels of various building, removing the vegetation growth and cleaning the drain pipes, spouts periodically as and when required, conveying the removed unwanted materials to the bins as directed, cutting and making opening in brick masonry, RCC concrete, removing the debris, disposing off as directed, attending the masonry repairs and making good the sides of hole packing the removed portion of the inside by filling concrete / brick work including finishing the surfaces etc. construction of brick masonry foundation walls wherever required etc. complete all as directed by the Engineer-in-Charge.
42Cleaning of Septic Tank of 5000 litres capacity by mechanical means by engagingsewage tanker fitted with Vaccum pumpincludingpumping the sewage water from Septic Tanks , collection, transportation , disposal of the same to the place as directed by Engineer in charge and cleaning of Sludge if any from the tank.Note: Contrator shall arrange specilisedSewage Tanker along with Operators with valid permits.
43Maintenance of wall Urinals/ EWC/IWC Washbasin/ Inspection chambers by cleaning , removing the chokes and clearing the drainage pipe at regular interval / as and when got choked etc. all complete etc. all complete work as directed by the Engineer-in-charge at site .
44Day to day assistance in the execution of Civil Engineering related activities at various construction or maintenance sites such as assisting to checking at all the stages of each activity of reinforecement fabrication and erection works, checking the shuttering alignment, concreting works, brick work and RR masonry works, plastering, painting works and other finishing works, preventive & breakdown maintenance activites including supervisingall civil activities and assisting in taking the field measurements for estimation and RA billing works and quality assurance related works etc. as directed by the Engineer - in - charge. Note: 1. The contractor shall engage technical personnel having Degree in Civil Engineering orDiploma holder in Civil Engineering with minimum 2 years of experiencein Civil construction field activities with computer knowlegde using MS Office. 2. 8 Hours shift is considered as one operations.
45Overall rebate (Optional)
46INR Zero Only
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail