Border Security Force-BSF has published Tender For Repair And Maintenance Of Damaged Retaining Wall Of Various Places Of Pck Location Under Shq Bsf Srinagar. Submission Date for this Tender is 24-04-2024. Wall construction Tenders in Srinagar Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earthworkinexcavationbymechanicalmeans(Hydraulicexcavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge:All kinds of soil |
2 | Fillingavailableexcavatedearth (excludingrock)intrenches,plinth.sidesof foundationsetc.inlayersnotexceeding 20cmindepth,consolidatingeach deposited layer by ramming and watering, lead up to 50 m and for all lift |
3 | Providingandlayinginpositioncementconcreteof specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) |
4 | Providingandlayinginpositioncementconcreteof specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)) |
5 | Reinforcedcement concreteworkinwalls(any thickness), includingattachedpilasters,buttresses,plinthandstring courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1cement :1.5 coarsesand(zone-III)derivedfrom natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
6 | Reinforced cement concrete work in beams, suspended foors, roofshavingslopeupto 15°landings,balconies,shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
7 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns, etc. for mass concrete |
8 | Centering and shuttering including strutting, propping etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
9 | Centering and shuttering including strutting, propping etc. and removal of form for :Lintels, beams, plinth beams, girders, bressumers and cantilevers |
10 | Centering and shuttering including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts |
11 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. |
12 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) |
13 | Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand) |
14 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) |
15 | Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured):In cement mortar |
16 | Credit to work for using available Hard stone for ranndom rubble masonry in foundation and plinth including cleaning & stacking of Good stone etc at site (cleaning & stacking of good will be paid seprately) as per direction of Engineer in charge. |
17 | Add for revised GST @18% in place of 12% @6.33% for Item No 1 to 16 |
18 | Add Cost Index @21.00% for Item No 1 to 15 |