Western Railway-WR has published Supply Of Roof Mounted Ac Package Unit (Rmpu) & Control Unit For Air Conditioned Ac Emu Rakes. One Coach Set Of Rmpu & Control Unit Consisting Of 1) 2 Nos. Of Rmpu Complete , Generally Confirming To But Not Limited To Rdso/Pe/Spec/Ac/ D/0168-2012, Rev.. Submission Date for this Tender is 14-05-2024. Air Conditioner Tenders in mumbai Maharashtra. Bidders can get complete Tender details and download the document.
FileName | File Description | File Size |
4878398.pdf | Tender Document | 0 KB |
4878404.pdf | Tender Document | 0 KB |
4878567.pdf | Tender Document | 0 KB |
4878572.pdf | Tender Document | 0 KB |
ea6f3fd0-01a9-4566-a374-d2a838073564.pdf | Tender Notice | 0 KB |
Sl. No. | Item Description |
1 | Supply Of Roof Mounted Ac Package Unit (Rmpu) & Control Unit For Air Conditioned Ac Emu Rakes. One Coach Set Of Rmpu & Control Unit Consisting Of 1) 2 Nos. Of Rmpu Complete , Generally Confirming To But Not Limited To Rdso/Pe/Spec/Ac/ D/0168-2012, Rev.(0) Including Complete Accessories As Per Clause 2.2 And 2) 1 No. Microprocessor Controller , Generally Confirming To But Not Limited To Rdso/Pe/Spec/Ac/ 0139-2009 (Rev.1) Without Display Unit 3) The Tenderer May Follow The Oga Drawing No. Icf/Sk3-7-6-040 Alt.Bof Rmpu General Guidance 4) The Tenderer May Follow The Oga Drawing No. Icf/Sk3-7-5-026 Col. I&Ii For Control Panel Of Rmpu For Tc And Dmc/Ndmc Respectively For General Guidance. 5)Coordination With Propulsion System Supplier For Interface ( Physical Layout, Communication Protocol & Algorithm) With Tcms & Power Supply System Will Be The Responsibility Of Successful Bidder.( Scope Of Supply: 2 Nos. Of Rmpu And 1 No. Of Microprocessor Controller Unit Per Coach Set) . |
2 | Supply of Roof Mounted AC Package Unit (RMPU) & control unit for Air conditioned AC EMU rake s. One coach set of RMPU & control unit consisting of 1) 2 nos. of RMPU complete , generally confirming to but not limited to RDSO/PE/SPEC/AC/ D/0168-2012, Rev.(0) including complete accessories as per clause 2.2 and 2) 1 no. microprocessor controller , generally confirming to but not limited to RDSO/PE/SPEC/AC/ 0139-2009 (re v.1) without display unit 3) The tenderer may follow the OGA drawing no. ICF/SK3-7-6-040 alt.Bof RMPU general guidance 4) The tenderer may follow the OGA drawing no. ICF/SK3-7-5-026 col. I&II for control panel of RMPU f or TC and DMC/NDMC respectively for general guidance. 5)Coordination with propulsion system supplier for inte rface ( physical layout, communication protocol & algorithm) with TCMS & power supply system will be the resp onsibility of successful bidder.( Scope of supply: 2 nos. of RMPU and 1 no. of microprocessor controller unit per coach set) . [ Warranty Period: 30 Months after the date of delivery ] |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail