Corrigendum : Tender For Manufacture And Supply Of Pre-Stressed Mono Block Concrete Isolated Sleepers For 1 In 12 Psc Turnouts {Crossing Portion Sleeper No. 65 To 74 (43.76 Rmt)} As Per Rdso Drg. No. Rdso/T-4218, Guntakal-Andhra Pradesh
TDR : 43163511
Tender Notice
BOQ
Expired
Guntakal
Andhra Pradesh
Corrigendum : Tender For Manufacture And Supply Of Pre-Stressed Mono Block Concrete Isolated Sleepers For 1 In 12 Psc Turnouts {Crossing Portion Sleeper No. 65 To 74 (43.76 Rmt)} As Per Rdso Drg. No. Rdso/T-4218
Manufacture And Supply Of Pre-Stressed Mono Block Concrete Isolated Sleepers For 1 In 12 Psc Turnouts {Crossing Portion Sleeper No. 65 To 74 (43.76 Rmt)} As Per Rdso Drg. No. Rdso/T-4218
2
Manufacture and supply of Pre-stressed Mono Block Concrete Isolated Sleepers for 1 in 12 PSC Turnouts {crossing portion sleeper No. 65 to 74 (43.76 RMT)} as per RDSO Drg. No. RDSO/T-4218 with Latest Alterations and part drawing thereof to suit 60 kg (UIC Rail)/52kg rail and to IRS specification T-45 (4th rev Mar-21), both as amended up to date duly loaded into Wagons/Road vehicles. [ Warranty Period: 60 Months after the date of delivery ]
3
Manufacture and supply of Pre-stressed Mono Block Concrete Isolated Sleepers for 1 in 12 PSC Turnouts {Lead portion Sleeper No. 22 to 64 (145.38 RMT)} as per RDSO Drg. No. RDSO/ T-4218 with Latest Alterations and part drawing thereof to suit 60 kg (UIC Rail)/52kg rail and to IRS specification T-45 (4th rev Mar-21), both as amended up to date duly loaded into Wagons/Road vehicles. [ Warranty Period: 60 Months after the date of delivery ]SE/PW/CTYL, SCR Telangana 145.38 MetreSSE/PW/DKD, SCR Andhra Pradesh 145.38 MetreSSE/PW/GID, SCR Andhra Pradesh 145.38 MetreSSE/PW/GNT, SCR Andhra Pradesh 145.38 MetreSSE/PW/N/GNT, SCR Andhra Pradesh 145.38 Metre
4
Manufacture and supply of Pre-stressed Mono Block Concrete Isolated Sleepers for 1 in 12 PSC Turnouts {crossing portion sleeper No. 65 to 74 (43.76 RMT)} as per RDSO Drg. No. RDSO/T-4218 with Latest Alterations and part drawing thereof to suit 60 kg (UIC Rail)/52kg rail and to IRS specification T-45 (4th rev Mar-21), both as amended up to date duly loaded into Wagons/Road vehicles. [ Warranty Period: 60 Months after the date of delivery ]SE/PW/CTYL, SCR Telangana 43.76 MetreSSE/PW/DKD, SCR Andhra Pradesh 43.76 MetreSSE/PW/GID, SCR Andhra Pradesh 43.76 MetreSSE/PW/GNT, SCR Andhra Pradesh 43.76 MetreSSE/PW/N/GNT, SCR Andhra Pradesh 43.76 Metre
5
Manufacture and supply of Pre-stressed Mono Block Concrete Isolated Sleepers for 1 in 12 PSC Turnouts {crossing portion sleeper No. 65 to 74 (43.76 RMT)} as per RDSO Drg. No. RDSO/T-4218 with Latest Alterations and part drawing thereof to suit 60 kg (UIC Rail)/52kg rail and to IRS specification T-45 (4th rev Mar-21), both as amended up to date duly loaded into Wagons/Road vehicles. [ Warranty Period: 60 Months after the date of delivery ]
6
Manufacture and supply of Pre-stressed Mono Block Concrete Isolated Sleepers for 1 in 12 PSC Turnouts {Switch portion sleeper No. 1 to 21 (59.94 RMT)} as per RDSO Drg. No. RDSO/ T-4218 with Latest Alterations and part drawing thereof to suit 60 kg (UIC Rail)/52kg rail and to IRS specification T-45 (4th rev Mar-21), both as amended up to date duly loaded into Wagons/Road vehicles. [ Warranty Period: 60 Months after the dateof delivery ]
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.