Tender For For Various Electrification Work In Business Plan-2024-25 Under Various 33 / 11 Kv S / S Area Under Edd-Iv ( Ujhani ) , Budaun, 1 The Work Of Safe Carriage Of The Following Material From Store Center , Budaun-Uttar Pradesh

Madhyanchal Vidut Vitran Nigam Limited has published Tender For For Various Electrification Work In Business Plan-2024-25 Under Various 33 / 11 Kv S / S Area Under Edd-Iv ( Ujhani ) , Budaun, 1 The Work Of Safe Carriage Of The Following Material From Store Center . Submission Date for this Tender is 29-04-2024. Civil Work Tenders in Budaun Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43161075
Corrigendum : Tender For For Various Electrification Work In Business Plan-2024-25 Under Various 33 / 11 Kv S / S Area Under Edd-Iv ( Ujhani ) , Budaun, 1 The Work Of Safe Carriage Of The Following Material From Store Center
Open Tender
Indian
Uttar Pradesh
Budaun
29-04-2024

Tender Details

Tender For For Various Electrification Work In Business Plan-2024-25 Under Various 33 / 11 Kv S / S Area Under Edd-Iv ( Ujhani ) , Budaun, 1 The Work Of Safe Carriage Of The Following Material From Store Center Nawada To Work Site Under The Jurisdiction Of Edd-Iv ( Ujhani ) , Budaun Approx. Distance Upto 0-60 Km. Including Safe Loading And Unloading. 2 11 Kv 3X300 Sqmm Xlpe Cable 3 11 Kv 3X300 Sqmm Xlpe Cable Box Indoor Jointing Kit 4 11 Kv 3X300 Sqmm Xlpe Cable Box Jointing Kit Outdoor 5 11 Kv 3X185 Sqmm Xlpe Cable 6 11 Kv 3X185 Sqmm Xlpe Cable Box Indoor Jointing Kit 7 11 Kv 3X185 Sqmm Xlpe Cable Box Outdoor 8 11 Kv Vcb O / G 9 11 Kv Vcb I / C 10 33 Kv P.T. 11 33 Kv Fuse Set 12 33 Kv Lightening Arrestor 13 33 Kv Vcb O / D 14 33 Kv Control Pannel For Single Transformer 15 33 Kv Control Pannel For Double Transformer 16 33 Kv C.T., 400 / 200 / 1-1-1 Amp. 17 33 Kv Line Isolator 18 Pcc Pole Support 8.5 Mtr. Long 19 St Pole Support 11 Mtr. Long 20 11 Kv Ms T-Off Channel 21 Top Channel ( 125X65x2240 Mm ) 22 11 Kv Disc Insulator Composite 45 Kn ( T&C Type ) 23 11 Kv Pin Insulator Composite 24 11 Kv X-Arm V Type 25 Acsr Rabbit Conductor 26 Stay Complete 27 Earthing Complete 28 Abc Cable ( 3X95+1X70+1X16 ) Sqmm 29 Abc Cable ( 3X50+1X35+1X16 ) Sqmm 30 3 Phase Distribution Box 31 1 Phase Distribution Box 32 L.T. Lead Lt Xlpe Cable 1X400 Sqmm 33 G.I. Wire 6 Swg 34 G.I. Wire 10 Swg 35 Dismentaling Of Following Old & Damaged Equipment’Sas Per Norms Complete In All Respect 36 11 Kv Vcb O / G 37 11 Kv Vcb I / C 38 33 Kv P.T. 39 33 Kv Lightening Arrestor 40 33 Kv Vcb O / D 41 33 Kv Control Pannel 42 33 Kv C.T., 400 / 200 / 1-1-1 Amp. 43 33 Kv Line Isolator 44 Erection / Installation Of Following 11 Kv Panel ( Vcb ) In Control Room And Cable Joint Of The Panel To Pole Including Earthing, Grouting Of Anchor Bolt Of Panel And Making / Repairing Of Pocket For Cable To Insert In Panel From Trench And Fixing, Taping Of Bus Bar With Wiring For Pt. Ac, Dc Connection Including Providing Of Ac & Dc Supply. 45 11 Kv Vcb O / G 46 11 Kv Vcb I / C 47 Mounting And Installation Including Mechanical / Electrical Fixing And Adjusting Of The Following Equipment On Their Respective Structures Including Proper Adjustment As Per Resspo Norms. 48 33 Kv P.T. 49 33 Kv Fuse Set 50 33 Kv Lightening Arrestor 51 33 Kv Vcb O / D 52 33 Kv Control Pannel For Single Transformer 53 33 Kv Control Pannel For Double Transformer 54 33 Kv C.T., 400 / 200 / 1-1-1 Amp. 55 33 Kv Line Isolator 56 Laying Of Control Cable From 33 Kv Panel To Vcb 2X2.5 Sqmm Aramourd Cable Under Ground In Trench Making Proper Complete In All Respect As Per Resspo Norms. 57 Laying Of Control Cable From 33 Kv Panel To Vcb 4X2.5 Sqmm Aramourd Cable Under Ground In Trench Making Proper Complete In All Respect As Per Resspo Norms. 58 Erection Of Single Pcc Pole 8.5 Mtr. Long In H.T / L.T Lines Including Fitting Of All Accessories As Per Resspo Norms ( All Necessary Clamps, Nut & Bolts Etc. Shall Be Provided By The Contractor For Execution Of Work As Per Resspo Norms ) . 59 Erection Of Single St Pole 11 Mtr. Long In H.T / L.T Lines Including Fitting Of All Accessories As Per Resspo Norms ( All Necessary Clamps, Nut & Bolts Etc. Shall Be Provided By The Contractor For Execution Of Work As Per Resspo Norms ) . 60 Grouting Of Pcc Pole 8.5 Mtr. Long & St Pole 11 Mtr. Long With 1:4:8 Mixture In Size ( 450X450x1500mm. ) Including Cost Of Cement / Bb & Sand Required As Per Resspo Norms. ( All Grouting Material Shall Be Provided By The Contractor ) . 61 Grouting Of Stays, 1:4:8 Cc Ratio ( 600X600x300mm. ) As Per Respo Norms. ( All The Grouting Material Shall Be Provided By The Contract For Execution Of Work ) . 62 The Work Of Driving The Earthing Electrode And Making Connections With Gi Wire. 63 Dismentaling Of Following Old & Damaged Line As Per Norms Complete In All Respect 64 Acsr Weasel Conductor 65 Abc Cable 66 Laying, Stringing, Sagging & Jumpring Of Following Conductor Complete In All Respect As Per Resspo Norms. 67 Acsr Rabbit Conductor 68 Abc Cable ( 3X95+1X70+1X16 ) Sqmm 69 Abc Cable ( 3X50+1X35+1X16 ) Sqmm 70 L.T. Lead Lt Xlpe Cable 1X400 Sqmm 71 Underground Laying Of 11 Kv 3X300 Sq.Mm Xlpe Cable In Single Circuit Complete In All Respect Along With Road Restoration. 72 Fixing Of 11 Kv 3X300 Sq.Mm Xlpe Cable Inoutdoor Jointing Kits After Carefully Removing The Insulation Of The Cable Duly Plumbing And Taping Of Cable Providing, Fixing And Crimpling Of Proper Size Good Quality Lugs And Complete Work. 73 Fixing Of 11 Kv 3X300 Sq.Mm Xlpe Cable Outdoor Jointing Kits After Carefully Removing The Insulation Of The Cable Duly Plumbing And Taping Of Cable Providing, Fixing And Crimpling Of Proper Size Good Quality Lugs And Complete Work. 74 Underground Laying Of 11 Kv 3X185 Sq.Mm Xlpe Cable In Single Circuit Complete In All Respect Along With Road Restoration. 75 Fixing Of 11 Kv 3X185 Sq.Mm Xlpe Cable Inoutdoor Jointing Kits After Carefully Removing The Insulation Of The Cable Duly Plumbing And Taping Of Cable Providing, Fixing And Crimpling Of Proper Size Good Quality Lugs And Complete Work. 76 Fixing Of 11 Kv 3X185 Sq.Mm Xlpe Cable Outdoor Jointing Kits After Carefully Removing The Insulation Of The Cable Duly Plumbing And Taping Of Cable Providing, Fixing And Crimpling Of Proper Size Good Quality Lugs And Complete Work. 77 Fixing Of Danger Board On Each Location And G.I. Barbed Wire Including Proper Clamping As Per Resspo Norms. ( Danger Board Shall Be Provided By The Contractor As Per Resspo Norms ) Complete In All Respect. 78 Erraction / Fixing Of Tailess Unit ( 600 A ) ( Tailess Unit Shall Be Provided By The Contractor As Per Resspo Norms ) . Complete In All Respect As Per 79 Errection And Commissioning Of 3 Phase Distribution Box On The Lt Poles ( All The Material Required Shall Be Arranged By The Contractor For Errection And Commissioning Of Distribution Boxes Except Distribution Box ) . 80 Errection And Commissioning Of 1 Phase Distribution Box On The Lt Poles ( All The Material Required Shall Be Arranged By The Contractor For Errection And Commissioning Of Distribution Boxes Except Distribution Box ) . 81 Construction Of 250 Kva T / F Plinth 1.5X1.5X2 Mtr. For Mounting T / F Including Foundation Work ( Below Ground 0.5 M ) , Brick Work, Rcc Slab Of 4” Thickness And Plastering In 1:6 Ratio With 02 Nos Channel Pieces Of 1.5 Mtr Long Of Size 100X50x6 Mm Compete In All Respect As Per Resspo Norms. 82 Cage Fencing Of 250 Kva Plinth Mounted Transformer In Town Areas To Avoid Electrical Human / Cattle Accidents By Fabrication Of Cage ( 1 Inch Sq Wiremesh ) Made Of 10 No Gauge In Suitable Size Angle Iron Frame Of Size 7.5 ( L ) X5 ( W ) X8’ ( H ) By Strenghtening Of Wire Mesh 20X3 Mm M.S. Flat Haorizentally As Well As Vertically, Grouting The Panel With 1:2:4 Cement / Coorse Send / Brick Ballast. The Frame Should Be Bolted On Angles At The Four Corners So That Frame May Be Un-Bolted / Bolted At The Time Of Replacement Of The Transformer. Provision Of 1 Gate Should Be There For Maintenance Of The Transformer. Painting ( 1 Coat Of Red Oxide + 2 Coat Of Bus Green Enamel Paint ) . The Wire Mesh Should Be Earthed With 50X6 Mm Ms Earthing Strip With Existing Earthing Of Transformer Body. All Men, Material And T&P Provided By The Contractor To Complete The Fabrication, Transportation And Installation. 83 Pipe Earthing Of Vcb ( By Boring Of 4 Inch Diameter 20 M Deep, 40 Mm Diameter A Class Gi Pipe Is Inserted To A Depth Of 20 M And A Holed Pipe Of 1.5M Length Is Inserted At The Bottom, Tighten One End Of The Ms Strip Of Size 50X6mm With The Nut Bolt With The Neutral Of The Converter And Weld The Other End With The Gi Pipe Inserted In The Boring For Earthing. Putting A Socket On The Upper Part Of The Pipe ( Mouth ) So That Water Can Be Poured Into It To Retain Moisture. To Complete The Work Contractor Will Provide All Material, Manpower, T&P, Safe Carriage Of Material To Worksite. Above Work Will Be Carried Out Under Supervision Of Concerned Je / Sdo / Ee ) . 84 Construction Of Plinth & Foundation Suitable Size Of Vcb Compete In All Respect As Per Resspo Norms ( All Material Shall Be Provided By The Contractor For Construction Of Plinth & Foundation ) . 85 Guarding Of Ht / Lt / Telephone Line / Road / River Crossing Etc. And Making Net With Difference Of 1.00 Mtr. Completely Including Fixing Of All Channel / Angle Etc. With Proper Locking At Each Support. All Type Nut & Bolt Shall Be Provided By The Contractor. 86 Fixing & Fabrication Of Ct Structure Complete In All Respect As Per Resspo Norms. 87 Fixing & Fabrication Of Pt Structure Complete In All Respect As Per Resspo Norms. 88 Repairing And Overhauling Of 33 Kv Vcb 89 Providing And Fixing Of Damaged Charging Garai And Non-Bearing Complete For 33 Kv 90 Complete Repairing Of Tripping Machanish System And Replacement Of Lever, Spring, Bush Etc For 33 Kv Vcb 91 Providing And Fixing Of 03 No. Eye Bolt And Contactor 33 Kv Vcb 92 Providing And Fixing Of Handing And Pumping Relay For 33 Kv Vcb 93 Complete Repairing Of 3 Kv Vcb Motor And Garari Complete For 33 Kv Vcb 94 Providing And Fixing Of Damaged Triping Coil Complete For 33 Kv Vcb 95 Providing And Fixing Of Fiber Closing Rodfor 33 Kv Vcb 96 Providing Of 2.5 Mmsq. Pvc Copper Wire And Repairing Of Damaged Burnt Wiring Complete Of 33 Kv Vcb 97 Complete Overhauling, Proper Connection And Providing And Fixing Of Missing Nut & Bolts And Proper Functioning Of 33 Kv Vcb 98 Repairing And Overhauling Of 33 Kv Control Panel 99 Providing & Fixing Of Local Remote Switch For 33 Kv Control Panel 100 Providing & Fixing Of Indicator Lamp 06 No. Of Different Colour And Proper Connections 101 Providing & Fixing Of 63 Amp. Kit-Kat With Tubular Fuse 08 Nos. Complete And Proper Connection 102 Complete Repairing Proper Connection And Providing Of Missing Nut & Bolts For Proper Functioning Of 33 Kv Control Panel 103 Providing And Laying Of 4X2.5 Mmsq. Control Cable From 33 Kv Vcb To 33 Kv Control Panel Under Ground In Trench Making Proper 104 The Following Decentralized Material Shall Be Provided By The Contractor For Execution Of Work As Per Respo Norms ( The Material Shall Be Purchased From Approved Vendor Of Discom ) . 105 Holding Clamps For S / S With Bolt & Nuts 106 Holding Clamps For Guarding Angle 107 Holding Clamps For Lt T-Off 108 11 Kv F Clamp With Nut & Bolt 109 X-Arm Holding Clamp With Nut & Bolt 110 Pg Clamp 111 Stone Pad 112 Danger Board 113 Barbed Wire 114 Distribution Box Clamps 115 Piercing Connector 116 Lt Shackle Insulator 117 N&B For Shackle Insulator 118 Lt Clamps With N&B For Shackle Insulator 119 Al. Lugs For 400 Kv Sqmm Cable 120 Stay Insulator 121 11 Kv Guarding Angle 122 Fuse Wire 23 Swg 123 Fuse Wire 27 Swg 124 Lt Tailess Unit ( 600A ) 125 Control Cable From 33 Kv Panel To Vcb 2X2.5 Sqmm Aramourd 126 Control Cable From 33 Kv Panel To Vcb 4X2.5 Sqmm Aramourd 127 Structure For Ct 128 Structure For Pt 129 Safe Back Carriage Of Following Item ( If Any ) From Work Site To Store Center, Nawada, Budaun Approx Distance Upto 0-60 Km Including Loading & Unloading. 130 Material Jarjar Weasal Conductor 131 Material Abc Scrap 132 Material Gi Scrap 133 33 Kv Vcb O / D Damage 134 Old Damaged Ct / Pt 135 33 Kv Control Panel Damage 136 11 Kv Vcb O / D Damage 137 33 Kv Line Isolator Scrap.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 18-Apr-2024 DATE EXTENSION3 Date 22-04-2024
2 23-Apr-2024 DATE EXTENSION03 Date 26-04-2024
3 27-Apr-2024 DATE EXTENSION4 Date 29-04-2024

Key Value

Document Fees
INR 3540 /-
EMD
INR 62000.0 /-
Tender Value
INR 61.59 Lakhs /-

BOQ Items

Name of Work: For various electrification work in Business Plan-2024-25 under various 33/11 KV S/s area under EDD-IV (Ujhani), Budaun.
Sl. No. Item Description
1The work of safe carriage of the following material from store center Nawada to work site under the jurisdiction of EDD-IV (Ujhani), Budaun Approx. distance upto 0-60 Km. Including safe loading and unloading.
211 KV 3X300 Sqmm XLPE Cable
311 KV 3X300 Sqmm XLPE Cable Box Indoor Jointing Kit
411 KV 3X300 Sqmm XLPE Cable Box Jointing Kit Outdoor
511 KV 3X185 Sqmm XLPE Cable
611 KV 3X185 Sqmm XLPE Cable Box Indoor Jointing Kit
711 KV 3X185 Sqmm XLPE Cable Box Outdoor
811 KV VCB O/G
911 KV VCB I/C
1033 KV P.T.
1133 KV Fuse Set
1233 KV Lightening Arrestor
1333 KV VCB O/D
1433 KV Control Pannel for Single Transformer
1533 KV Control Pannel for Double Transformer
1633 KV C.T., 400/200/1-1-1 Amp.
1733 KV Line Isolator
18PCC Pole Support 8.5 Mtr. Long
19ST Pole Support 11 Mtr. Long
2011 KV MS T-Off Channel
21Top Channel (125x65x2240 mm)
2211 KV Disc Insulator Composite 45 KN (T&C Type)
2311 KV Pin Insulator Composite
2411 KV X-Arm V Type
25ACSR Rabbit Conductor
26Stay Complete
27Earthing Complete
28ABC Cable (3x95+1x70+1x16) sqmm
29ABC Cable (3x50+1x35+1x16) sqmm
303 Phase Distribution Box
311 Phase Distribution Box
32L.T. LEAD LT XLPE Cable 1x400 Sqmm
33G.I. Wire 6 SWG
34G.I. Wire 10 SWG
35Dismentaling of following old & damaged equipment’sas per norms complete in all respect
3611 KV VCB O/G
3711 KV VCB I/C
3833 KV P.T.
3933 KV Lightening Arrestor
4033 KV VCB O/D
4133 KV Control Pannel
4233 KV C.T., 400/200/1-1-1 Amp.
4333 KV Line Isolator
44Erection/Installation of following 11 KV Panel (VCB) in control room and cable joint of the panel to pole including earthing, grouting of Anchor bolt of Panel and making/repairing of pocket for cable to insert in panel from trench and fixing, taping of bus bar with wiring for PT. AC, DC connection including providing of AC & DC Supply.
4511 KV VCB O/G
4611 KV VCB I/C
47Mounting and installation including mechanical/electrical fixing and adjusting of the following equipment on their respective structures including proper adjustment as per RESSPO Norms.
4833 KV P.T.
4933 KV Fuse Set
5033 KV Lightening Arrestor
5133 KV VCB O/D
5233 KV Control Pannel for Single Transformer
5333 KV Control Pannel for Double Transformer
5433 KV C.T., 400/200/1-1-1 Amp.
5533 KV Line Isolator
56Laying of control cable from 33 KV Panel to VCB 2x2.5 Sqmm Aramourd cable under ground in trench making proper complete in all respect as per RESSPO Norms.
57Laying of control cable from 33 KV Panel to VCB 4x2.5 Sqmm Aramourd cable under ground in trench making proper complete in all respect as per RESSPO Norms.
58Erection of Single PCC pole 8.5 Mtr. Long in H.T/L.T lines including fitting of all accessories as per RESSPO Norms (All necessary clamps, Nut & Bolts etc. shall be provided by the contractor for execution of work as per RESSPO Norms).
59Erection of Single ST pole 11 Mtr. Long in H.T/L.T lines including fitting of all accessories as per RESSPO Norms (All necessary clamps, Nut & Bolts etc. shall be provided by the contractor for execution of work as per RESSPO Norms).
60Grouting of PCC Pole 8.5 Mtr. Long & ST pole 11 Mtr. Long with 1:4:8 mixture in size (450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms. (All Grouting material shall be provided by the contractor).
61Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. (All the grouting material shall be provided by the contract for execution of work).
62The work of driving the earthing electrode and making connections with GI wire.
63Dismentaling of following old & damaged Line as per norms complete in all respect
64ACSR Weasel Conductor
65ABC Cable
66Laying, Stringing, Sagging & Jumpring of Following Conductor complete in all respect as per RESSPO Norms.
67ACSR Rabbit Conductor
68ABC Cable (3x95+1x70+1x16) sqmm
69ABC Cable (3x50+1x35+1x16) sqmm
70L.T. LEAD LT XLPE Cable 1x400 Sqmm
71Underground Laying of 11 KV 3x300 sq.mm XLPE cable in Single circuit complete in all respect along with road restoration.
72Fixing of 11 KV 3x300 Sq.mm XLPE Cable Inoutdoor jointing kits after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work.
73Fixing of 11 KV 3x300 Sq.mm XLPE Cable outdoor jointing kits after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work.
74Underground Laying of 11 KV 3x185 sq.mm XLPE cable in Single circuit complete in all respect along with road restoration.
75Fixing of 11 KV 3x185 Sq.mm XLPE Cable Inoutdoor jointing kits after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work.
76Fixing of 11 KV 3x185 Sq.mm XLPE Cable outdoor jointing kits after carefully removing the insulation of the cable duly plumbing and taping of cable providing, fixing and crimpling of proper size good quality lugs and complete work.
77Fixing of danger board on each location and G.I. barbed wire including proper clamping as per RESSPO Norms. (Danger Board shall be provided by the contractor as per RESSPO Norms) complete in all respect.
78Erraction/Fixing of Tailess Unit (600 A) (Tailess Unit shall be provided by the contractor as per RESSPO Norms). complete in all respect as per
79Errection and commissioning of 3 Phase Distribution Box on the LT Poles (All the material required shall be arranged by the contractor for errection and commissioning of distribution boxes except distribution box).
80Errection and commissioning of 1 Phase Distribution Box on the LT Poles (All the material required shall be arranged by the contractor for errection and commissioning of distribution boxes except distribution box).
81Construction of 250 KVA T/F plinth 1.5x1.5x2 Mtr. for mounting T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect as per RESSPO Norms.
82Cage fencing of 250 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5"(L)x5"(W)x8’(H) by strenghtening of wire mesh 20x3 mm M.S. flat haorizentally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation.
83Pipe Earthing of VCB (By boring of 4 inch diameter 20 m deep, 40 mm diameter A Class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5m length is inserted at the bottom, Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work contractor will provide all material, manpower, T&P, safe carriage of material to worksite. Above work will be carried out under supervision of concerned JE/SDO/EE).
84Construction of Plinth & Foundation Suitable size of VCB compete in all respect as per RESSPO Norms (All material shall be provided by the contractor for construction of plinth & foundation).
85Guarding of HT/LT/Telephone Line/Road/River crossing etc. and making net with difference of 1.00 Mtr. Completely including fixing of all channel/angle etc. with proper locking at each support. All type nut & bolt shall be provided by the contractor.
86Fixing & Fabrication of CT Structure complete in all respect as per RESSPO Norms.
87Fixing & Fabrication of PT Structure complete in all respect as per RESSPO Norms.
88Repairing and overhauling of 33 KV VCB
89Providing and Fixing of damaged Charging Garai and Non-bearing complete for 33 KV
90Complete repairing of Tripping Machanish System and replacement of lever, spring, bush etc for 33 KV VCB
91Providing and Fixing of 03 No. eye bolt and contactor 33 KV VCB
92Providing and Fixing of handing and pumping relay for 33 KV VCB
93Complete repairing of 3 KV VCB Motor and garari complete for 33 KV VCB
94Providing and Fixing of damaged triping coil complete for 33 KV VCB
95Providing and Fixing of fiber closing rodfor 33 KV VCB
96Providing of 2.5 mmsq. Pvc Copper wire and repairing of damaged burnt wiring complete of 33 KV VCB
97Complete Overhauling, proper connection and providing and fixing of missing nut & bolts and proper functioning of 33 KV VCB
98Repairing and overhauling of 33 KV Control Panel
99Providing & Fixing of Local remote switch for 33 KV Control Panel
100Providing & Fixing of indicator lamp 06 No. of different colour and proper connections
101Providing & Fixing of 63 Amp. Kit-kat with tubular fuse 08 Nos. Complete and proper connection
102Complete repairing proper connection and providing of missing nut & bolts for proper functioning of 33 KV Control Panel
103Providing and laying of 4x2.5 mmsq. Control cable from 33 KV VCB to 33 KV control panel under ground in trench making proper
104The following Decentralized material shall be provided by the contractor for execution of work as per RESPO Norms (the material shall be purchased from approved vendor of Discom).
105Holding Clamps for S/s with Bolt & Nuts
106Holding Clamps for Guarding Angle
107Holding Clamps for LT T-OFF
10811 KV F Clamp with Nut & Bolt
109X-Arm Holding Clamp with Nut & Bolt
110PG Clamp
111Stone Pad
112Danger Board
113Barbed Wire
114Distribution Box Clamps
115Piercing Connector
116LT Shackle Insulator
117N&B for Shackle Insulator
118LT Clamps with N&B for Shackle Insulator
119Al. Lugs for 400 KV Sqmm Cable
120Stay Insulator
12111 KV Guarding Angle
122Fuse Wire 23 SWG
123Fuse Wire 27 SWG
124LT Tailess Unit (600A)
125Control Cable from 33 KV Panel to VCB 2x2.5 Sqmm Aramourd
126Control Cable from 33 KV Panel to VCB 4x2.5 Sqmm Aramourd
127Structure For CT
128Structure For PT
129Safe back carriage of Following item (if any) from work site to Store Center, Nawada,Budaun approx distance upto 0-60 Km including loading & unloading.
130Material Jarjar Weasal Conductor
131Material ABC Scrap
132Material GI Scrap
13333 KV VCB O/D Damage
134Old Damaged CT/PT
13533 KV Control Panel Damage
13611 KV VCB O/D Damage
13733 KV Line Isolator Scrap
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail