Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Tender For Cleaning Of Main And Sub Tranches Of Conveyor K-10 And K-16 Of Coal Yard Of Btps, Obra And The Work Of Bunker Cleaning And Shifting Of Coal Removed From Coal Bunkers Of 5X200mw And Round The Clock Poking For Removal Of Rat Hole/Choked Coal. Submission Date for this Tender is 09-05-2024. Mechanical engineering Service Tenders in obra Uttar Pradesh. Bidders can get complete Tender details and download the document.
FileName | File Description | File Size |
21625186-5e31-428b-a627-cf1ae73a5228.html | Tender Notice | 0 KB |
BOQ_1592903.xls | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Tendernotice_2.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Removal / cleaning of coal from the main & sub trenches of following conveyors and shifting the same to the coalyard of BTPS: |
2 | Conveyor- 16 |
3 | Conveyor- 10 |
4 | To provide additional man power for removal of chockingof crusher, transfer tower and chutes of CHP, BTPS, Obraduring rainy season.( one shift of 8 hrs. considered as 01 job) |
5 | Protection of coal stacked in BTPS coal yard from rain by covering the coal stack/heap with tarpaulin sheet, placing boulders/stone/any other heavy material available to kept it in proper position.( One shift of 8 hrs.= One job |
6 | Removal of coal , ash and metallic and conveyor belt scrap lying on roof of DG Set & Compressor house building/inside compressor room or air canon system and its shifting to BTPS coal yard/scrap yard by means of Truck/Trolley. |
7 | DIGGING OF COAL & COLLECT SPILL COAL near Conveyor |
8 | The work of Bunker Cleaning and Shifting of coal removed from Coal Bunkers of 5x200MW of Coal Handling Plant, ‘B’TPS |
9 | Cleaning of Raw Coal Bunker of CHP, BTPS, (5x200MW) during running condition of unit |
10 | Cleaning of Raw Coal Bunkers of CHP, of 5x200 MW during Shutdown |
11 | Shifting of coal removed from coal bunker at‘0’ Mtr. level to coal yard by Tractor trolley or Truck. |
12 | The work of Round the clock poking for removal of rat hole/choked coal inside Raw Coal Bunkers for smooth coal feeding in RC Feeder of Unit No. 9th, 10th, 11th, 12th & 13th during rainy season of CHP, BTPS, Obra |
13 | Round the clock poking during rainy season for removal of rat hole/choked coal inside Raw Coal Bunkers of any two Units of BTPS, Obra |
14 | Round the clock poking during rainy season for removal of rat hole/choked coal inside Raw Coal Bunkers of any two Units of BTPS, Obra. |
15 | Round the clock poking during rainy season for removal of rat hole/choked coal inside Raw Coal Bunkers of any one Unit of BTPS, Obra. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail