Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Installation Of Transformer At Verious Site Bp 2024-25, Work To Increase The Capacity Of Distribution Transformers Of Various Capacities Installed Near Jain College Road, Rajput Colony, In Front Of P&T Centre, Gurudev Nagar, Amanpuram Colony, G. Submission Date for this Tender is 25-04-2024. Distribution Transformer Tenders in Saharanpur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 18-Apr-2024 | date extended 25-04-2024 | Date | 25-04-2024 |
Sl. No. | Item Description |
1 | Safely carriage of STP 11 mtr long steel pole fromPVVNL, Store to site including loading & unloading at both ends. |
2 | Errection of11 mtr. Long ST Pole (grouting concreating of pole and making plinth) as per Resspo norms. |
3 | Safely carriage of PCC 8.5 mtr long fromPVVNL, Store to site including loading & unloading at both ends. |
4 | Errection of PCC 8.5 mtr long (grouting concreating of pole and making plinth) as per Resspo norms. |
5 | Safely carriage of line material fromPVVNL, Store to site including loading & unloading at both ends. |
6 | Carriage of250 KVA T/F FromPVVNL, Store to site including loading and unloading at both ends. |
7 | Mounting and installation of upto 250 KVA T/F on plinth as per Resspo norms. |
8 | Carriage of 100 KVA T/F FromPVVNL, Store to site including loading and unloading at both ends. |
9 | Mounting and installation of 100KVA T/F onD/P as per Resspo norms. |
10 | Carriage of 63 KVA T/F FromPVVNL, Store to site including loading and unloading at both ends. |
11 | Mounting and installation of 63 KVA T/F onD/P as per Resspo norms. |
12 | Safely Carriage of ACSR Dog condutor from PVVNL, Store to site of work including loading & unloading at both ends. |
13 | Laying stringing and sagging ofACSR Dog conductor including binding and jumpering as per Resspo norms. |
14 | Safely Carriage of LT AB condutor (3x120+1x95+1x16) from PVVNL, Store to site of work including loading & unloading at both ends. |
15 | Laying stringing and sagging of LT AB condutor (3x120+1x95+1x16) as per Resspo norms. |
16 | Safely Carriage of LT AB condutor (3x95+1x70+1x16) from PVVNL, Store to site of work including loading & unloading at both ends. |
17 | Laying stringing and sagging of LT AB condutor (3x95+1x70+1x16) as per Resspo norms. |
18 | Safely Carriage of ACSR weasel condutor from PVVNL, Store to site of work including loading & unloading at both ends. |
19 | Laying stringing and sagging ofACSR Weasel conductor including binding and jumpering as per Resspo norms. |
20 | Safely carriage of LT XLPE Cable 3.5x240 sqmm from PVVNL, Store to site of work including loading & unloading at both ends. |
21 | Laying lifting, stringing and sagging of LT XLPE cable 3.5x240 sqmm as per Resspo norms. |
22 | Safely carriage of LT XLPE Cable 3.5x70 sqmm from PVVNL, Store to site of work including loading & unloading at both ends. |
23 | Laying lifting, stringing and sagging of LT XLPE cable 3.5x70 sqmm as per Resspo norms. |
24 | Safely carriage of LT XLPE Cable 1x400 sqmm from PVVNL, Store to site of work including loading & unloading at both ends. |
25 | Laying lifting, stringing and sagging of LT XLPE cable 1x400 sqmm as per Resspo norms. |
26 | Fixing of MS channel 100x50x6 as per Resspo norms. |
27 | Fixing of MS Angle 65x65x6 as per Resspo norms. |
28 | Fixing of 11KV TPMO set as per Resspo norms. |
29 | Fixing of 11kv fuse set as per Resspo norms. |
30 | fixing of GI wire 6swg |
31 | Providing & fixing different type Nut & bolt as per site condition. |
32 | Providing & fixing J-Hook with suspention clamp as per Resspo norms. |
33 | Providing & fixing dead end clamp as per Resspo norms. |
34 | Providing & fixing round pole/holding clamp with Nut & bolt as per Resspo norms. |
35 | Providing & fixing of piercing connector as per Resspo norms. |
36 | Providing & fixing of PG Clamp as per Resspo norms. |
37 | Fixing of Stay set complete as per resspo norms |
38 | Fixing of 3 Phase Distribution box as per Resspo norms. |
39 | Providing & fixing of 1x35 PVC cable as per Resspo norms. |
40 | Providing & fixing of Aluminium lugs for LT XLPE cable as per Resspo norms. |
41 | Fixing of MS Earth rod 20x2540 mm as per resspo norms |
42 | Construction of plinth 5"x5"x4 for placing upto 250 KVA T/F including cost of brick ballast, Ist class Brick , sand, cement, concrete and labour and plastring of plinth 12 mm thick as per Resspo norms. |
43 | Earthing of T/F boaring & fixing of 60 ft. deep G.I. Pipe of class "B" 1.5 dia and connected with G.I. strip of size 30x5 mm including providing required charcoel & salt as per Resspo norms. |
44 | Fencing of T/F as per Resspo Norms. |
45 | Fixing of disc insulator as per Resspo norms. |
46 | Fixing of disc fitting as per Resspo norms. |
47 | Fixing of pin insulator as per Resspo norms. |
48 | Dismantling of T/F 100KVA 11/0.4 KV old and used |
49 | Dismantling of T/F 63KVA 11/0.4 KV old and used |
50 | Dismantling of T/F 25KVA 11/0.4 KV old and used |
51 | Carrige of Dismantled 17 No. T/Fand other line material from site to PVVNL, Store including loading & unloading at both ends. |