Central Institute Of Technology has published Tender For Providing Of Outsourced Manpower For Electrical And Plumbing Maintenance Services At Central Institute Of Technology Kokrajhar. Submission Date for this Tender is 16-04-2024. Man Power Supply Tenders in kokrajhar Assam. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply Items |
2 | Earthing with G.I. earth pipe 50 mm dia, 4.5 meter long, including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/coke and salt as and when required. |
3 | Supplying and erection of 33 kV pin insulator (Polymeric) complete with large steel head G.I. pin, nuts, washers etc. as required. |
4 | Supplying and erection of 33 kV Disc insulator (Polymeric) complete with large steel head G.I. pin, nuts, washers etc. as required. |
5 | Supplying and erection of a set of three 11 kV disc insulator (Polymeric) for 11 kV over head lines with galvanised insulator fittings, ball and socket type and complete with galvanised strain clamps, bolts, nuts, washers etc. as required. |
6 | Supplying and erection of a set of three 11 kV pin insulator (Polymeric) for 11 kV over head lines with galvanised insulator fittings, ball and socket type and complete with galvanised strain clamps, bolts, nuts, washers etc. as required. |
7 | Supplying and erection of single piece nonlinear resistor type lightning arrestor suitable for 3 wire, 33 kV overhead lines with rated voltage 30 kV (RMS) with a nominal discharge current rating of 10 kA (station class) and complete with galvanised clamping arrangement, G.I. bolts, nuts, washers etc. as required. |
8 | Supplying and erection of single piece nonlinear resistor type lightning arrestor suitable for 3 wire, 11 kV overhead lines with rated voltage 30 kV (RMS) with a nominal discharge current rating of 5 kA (station class) and complete with galvanised clamping arrangement, G.I. bolts, nuts, washers etc. as required. |
9 | Supplying and Laying out sagging of 33 KV conductor including mid jointing wherever necessary for the three phases (i) For AAA Wolf Conductor |
10 | Fitting of extra clamps |
11 | Total in Figures (A) |
12 | Providing of Manpower |
13 | Electrician (Highly Skilled Category) |
14 | Electrician (Skilled) |
15 | Electrician (Semi Skilled) |
16 | Plumber (Highly Skilled) |
17 | Plumber (Skilled) |
18 | Plumber cum Mason (Semi-Skilled) |
19 | (Sub Total B) = |
20 | Vehicle with Driver Expenditure per Trip |
21 | (Sub Total C) = |
22 | Total with Contractor Profit (F) = |
23 | Add Tools, Tackles, Consumable etc. inclusive of contractor profit and taxes & duties on B @ = |
24 | (Sub Total D) = |
25 | Total Amount of EPF and ESIC Contribution per month = |
26 | Add Overhead Amount Per Month = |
27 | (Sub Total E) = |
28 | GST @ 18% on (F) = |
29 | Add labour Cess @ 1% on F = |
30 | Grand Total Cost for Proving of Manpower per Month = |
31 | Grand Total Cost for Proving of Manpower per Year = |
32 | The Total value of Contract (Supply Item (A) + Manpower) = |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail