Public Works Department-PWD has published Tender For Arrangement Of Temporary Electrical Installation Work, Hiring Of Dg Set With Fuel And Engagement Of Manpower For 23 Days In Respect To The Infrastructure Facility To Be Provided At 22 Nos Accommodation Centersunder Serampore Ps Under The Jurisd. Submission Date for this Tender is 02-05-2024. Electrical Maintenance Tenders in hooghly West Bengal. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 15-Apr-2024 | Corrigendum of Date | Date | 17-04-2024 |
2 | 18-Apr-2024 | Corrigendum of Date and time | Date | 22-04-2024 |
3 | 22-Apr-2024 | Corrigendum of Date and Time extend | Date | 26-04-2024 |
4 | 26-Apr-2024 | Corrigendum of Date and Time extendinggg | Date | 30-04-2024 |
5 | 30-Apr-2024 | Corr date and time of this tender | Date | 02-05-2024 |
6 | 30-Apr-2024 | Corrie the date and time of e Tender | Date | 02-05-2024 |
FileName | File Description | File Size |
c52b96bb-17ec-4527-8117-805b98508b63.html | Tender Notice | 0 KB |
BOQ_1499615.xls | Tender Document | 0 KB |
new2911.pdf | Tender Document | 0 KB |
SeramporeInventories.pdf | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | SUB-HEAD 1--CONTROL PANEL AND SWITCHES |
2 | Providing on hire basis following devices etc. on wooden plank board or suitable angle iron frame incl. Providing inter-connection wiring with socketing, earthing attachment etc. and dismentaling at the of end function (with PWD / E.I.C. approved materials) |
3 | 240V, 32 amp, DP Switch Rewireable type(For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.1)b) page no.04) |
4 | 415V, 63 amp TPN switch with rewirable fuse(For 1 to 3 days) (Temporary Schedule of PGE-2024 sl no.1)d) page no.04) |
5 | Providing on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. Providing inter-connection wiring with socketing, earthing attachment etc. and dismentaling at the of end function (with PWD / E.I.C. approved materials) |
6 | 240V, 2+12 Way SPNBDB With 6 - 32 amp SPMCB as Outgoing& 40/63 amp DPMCB as Incoming.( For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.2)a) page no.04) |
7 | 415V, upto 6 way TPNDB with 1 no.-63 amp FPMCB as incoming & 15 no. 6-32 amp SPMCB as outgoing(For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.2)b) page no.04) |
8 | Providing on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. Providing inter-connection wiring with socketing, earthing attachment etc. and dismentaling at the of end function (with PWD / E.I.C. approved materials) |
9 | 415V, 100amp, Offload Change Over Switch(For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.3)a) page no.04) |
10 | SUB-HEAD 2-- CABLE LAYING |
11 | Providing on hire main wiring with1.1 KV grade Aluminium Conductor PVC / XLPE armoured cable of following sizes including laying in trench (at least 230 mm below ground) including dismantling the same and mending good the damages. |
12 | 4 Core 16 Sq. mmPVC / XLPEarmorured cable per meter(For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.5)g) page no.05) |
13 | 2 Core 16 Sq. mmPVC / XLPEarmorured cable per meter(For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.5)h) page no.05) |
14 | SUB-HEAD 3--WIRING |
15 | Supplying & Drawing on Hire Basis Single Phase Dist Wiring With 2.5/4/6Sqmm with Earth Wire (1x 2.5/1x4) Sq mm Or its equivalent PVC copper wiring in suitable alkhathene pipe on the hire basis incl. dismantling the same per meter(For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.7 page no.06) |
16 | Supplying & Drawing on Hire Basis Single Phase Dist WiringWith 3X1.5 Sq mm with Earth WireOr its equivalent PVC copper wiring in suitable alkhathene pipeon the hire basis incl. dismantling the same Avg. run 10 meter(For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.10 page no.06) |
17 | SUB-HEAD 4 - SWITCH BOARD |
18 | Supplying & providing 1 no Seperate 6 amp plug and Switch with 150X100X65mm MS/TW switch Board on Hire basis and dismantaling the same(For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.16 page no.07) |
19 | SUB-HEAD 5 - FITTINGS & FIXTURE |
20 | Supplying & providing onhire basis 150 watt LED Flood light fittings complete with bracket and clamps on the pole including dismantling incl. replacement of fused lamp (As per approved by E.I.C.)(For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.24 page no.07) |
21 | Supplying & providing LED single fitting complete with tube, commercial type (4 ft) fitting on hire basis and dismantling the same (As per approved by E.I.C.) (For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.28 page no.08) |
22 | Supplying & providing on hire basis pendent light fittings with 18 WLED lamp holder shade etc. complete including dismantling the same(For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.32 page no.08) |
23 | SUB-HEAD 6 - FANS |
24 | Supplying & providing on hire basis 240V A. C. 1200 mm / 48" sweep ceiling fan with down rod as required & dismantling the same(For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.35 page no.09) |
25 | Supplying & providing on hire basis 240V A. C. 600 mm / 24" sweep Air Circulater Padestalfan and dismantling the same. (For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.37 page no.09) |
26 | SUB-HEAD 7 - EARTHING |
27 | Providing & Earthing on hire basis with 50 mm dia GI Pipe 2.5 to 3 mtrs. Long and 6/8 SWG GI wire with galvanized nuts and bolts washer etc. below ground level on hire basis and dismantling the same(For 1 to 3 days)(Temporary Schedule of PGE-2024 sl no.38 page no.09) |
28 | SUB-HEAD 8 - Extra for more than 3 days |
29 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Surendranath Roy Balika Bidyalaya of Serampore, Hooghly) |
30 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Serampore Mission Girls High School Serampore, Hooghly ) |
31 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Rajyadharpur Desh Bandhu Bidyapiathof Rajyadharpur PS- Serampore, Hooghly) |
32 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Amulyakanan Bus Stand 2nd Floor Serampore, Hooghly) |
33 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Serampore Textile College) |
34 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Baidyabati Banomali Mukherjee institution of Baidyabati PS- Serampore, Hooghly) |
35 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Sheoraphully Netaji Balika Mandir) |
36 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Baidyabati Vidyaniketan High School of Baidyabati PS- Serampore, Hooghly ) |
37 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Amulya Kanan Bustand 1st FloorPS- Serampore, Hooghly) |
38 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Sheoraphully Surendranath Bidyaniketan of Sheoraphully PS- Serampore, Hooghly) |
39 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Rishra Swatantra Hindi Vidyalaya of Rishra PS- Serampore, Hooghly) |
40 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Baidyabati Charusial Bose Balika Bidyalaya of Baidyabati PS- Serampore, Hooghly) |
41 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Champsara High School Baidyabati PS- Serampore, Hooghly) |
42 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Simla High School of Simla PO- Mallickpara PS- Serampore, Hooghly) |
43 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Nabagram K.D Pal Bidyalaya PS- Serampore, Hooghly) |
44 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Rishra Bidyaptih Boys of Rishra PS- Serampore, Hooghly) |
45 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Serampore High Schoolof N.S AvenuePS-Serampore , Hooghly ) |
46 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Chatra Nandalal Insitution of Chatra PS- Serampore, Hooghly) |
47 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Serampore Girl High Shcoolof J.N Lahiri Road PS- Serampore, Hooghly) |
48 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Rajyadharpur Girl high School of Rajyadarpur PS- Serampore, Hooghly |
49 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Mahesh Parameswari Balika Bidyalaya ofMahesh PS- Serampore, Hooghly) |
50 | Add Extra @2% on the amount for item no. 1 to 13 for each day from 4th day to 23th day(for Serampore Union Institutionof Tin Bazar PS- Serampore, Hooghly) |
51 | SUB-HEAD 9 - D.G. SET |
52 | Supplying & providing & connecting with Existing electrical panel (With appropriate cable supplied by Contractor )on hirebasisdifferent KVAThreephase DG setof Follwing Ratings and dismantling the same, excluding fuel charges |
53 | 10KVA three ph for each day(22 nos.)(Temporary Schedule of PGE-2024 sl no.39.h)i) page no.10) |
54 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Surendranath Roy Balika Bidyalaya of Serampore, Hooghly ) |
55 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Serampore Mission Girls High School Serampore, Hooghly) |
56 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Rajyadharpur Desh Bandhu Bidyapiathof Rajyadharpur PS- Serampore, Hooghly) |
57 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Amulyakanan Bus Stand 2nd Floor Serampore, Hooghly) |
58 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Serampore Textile College) |
59 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Baidyabati Banomali Mukherjee institution of Baidyabati PS- Serampore, Hooghly ) |
60 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Sheoraphully Netaji Balika Mandir) |
61 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Baidyabati Vidyaniketan High School of Baidyabati PS- Serampore, Hooghly) |
62 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Amulya Kanan Bustand 1st FloorPS- Serampore, Hooghly) |
63 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Sheoraphully Surendranath Bidyaniketan of Sheoraphully PS- Serampore, Hooghly) |
64 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Rishra Swatantra Hindi Vidyalaya of Rishra PS- Serampore, Hooghly) |
65 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Baidyabati Charusial Bose Balika Bidyalaya of Baidyabati PS- Serampore, Hooghly) |
66 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Champsara High School Baidyabati PS- Serampore, Hooghly) |
67 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Simla High School of Simla PO- Mallickpara PS- Serampore, Hooghly) |
68 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Nabagram K.D Pal Bidyalaya PS- Serampore, Hooghly) |
69 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Rishra Bidyaptih Boys of Rishra PS- Serampore, Hooghly ) |
70 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Serampore High Schoolof N.S AvenuePS-Serampore , Hooghly ) |
71 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Chatra Nandalal Insitution of Chatra PS- Serampore, Hooghly) |
72 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Serampore Girl High Shcoolof J.N Lahiri Road PS- Serampore, Hooghly) |
73 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Rajyadharpur Girl high School of Rajyadarpur PS- Serampore, Hooghly) |
74 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Mahesh Parameswari Balika Bidyalaya ofMahesh PS- Serampore, Hooghly ) |
75 | 10KVA three ph for each single day more than three days(1 no.)(Temporary Schedule of PGE-2024 sl no.39.h)ii) page no.10)(for Serampore Union Institutionof Tin Bazar PS- Serampore, Hooghly) |
76 | SUB-HEAD 10 - Deployment of man power |
77 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Surendranath Roy Balika Bidyalaya of Serampore, Hooghly) |
78 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Serampore Mission Girls High School Serampore, Hooghly) |
79 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Rajyadharpur Desh Bandhu Bidyapiathof Rajyadharpur PS- Serampore, Hooghly) |
80 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Amulyakanan Bus Stand 2nd Floor Serampore, Hooghly) |
81 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Serampore Textile College) |
82 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Baidyabati Banomali Mukherjee institution of Baidyabati PS- Serampore, Hooghly) |
83 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Sheoraphully Netaji Balika Mandir) |
84 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Baidyabati Vidyaniketan High School of Baidyabati PS- Serampore, Hooghly ) |
85 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Amulya Kanan Bustand 1st FloorPS- Serampore, Hooghly) |
86 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Sheoraphully Surendranath Bidyaniketan of Sheoraphully PS- Serampore, Hooghly) |
87 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Rishra Swatantra Hindi Vidyalaya of Rishra PS- Serampore, Hooghly) |
88 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Baidyabati Charusial Bose Balika Bidyalaya of Baidyabati PS- Serampore, Hooghly) |
89 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Champsara High School Baidyabati PS- Serampore, Hooghly) |
90 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Simla High School of Simla PO- Mallickpara PS- Serampore, Hooghly) |
91 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Nabagram K.D Pal Bidyalaya PS- Serampore, Hooghly) |
92 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Rishra Bidyaptih Boys of Rishra PS- Serampore, Hooghly) |
93 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Serampore High Schoolof N.S AvenuePS-Serampore , Hooghly) |
94 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Chatra Nandalal Insitution of Chatra PS- Serampore, Hooghly) |
95 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Serampore Girl High Shcoolof J.N Lahiri Road PS- Serampore, Hooghly) |
96 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Rajyadharpur Girl high School of Rajyadarpur PS- Serampore, Hooghly) |
97 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Mahesh Parameswari Balika Bidyalaya ofMahesh PS- Serampore, Hooghly) |
98 | Development of One no. Electrician & One no. Helper per shift per day(i.e. Total 3 nos. Electrician & 3 nos. Helper per day for 24 hours) for carring out all kind of EI maintainance & DG operations etc.(Temporary Schedule of PGE-2024 sl no.41 page no.11)(for Serampore Union Institutionof Tin Bazar PS- Serampore, Hooghly ) |
99 | Add GST @ 18%on item no. 1 to 16 |
100 | Add CESS @ 1%on item no. 1 to 17 |
101 | SUB-HEAD 11 - HSD for D.G. SET |
102 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Surendranath Roy Balika Bidyalaya of Serampore, Hooghly) |
103 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Serampore Mission Girls High School Serampore, Hooghly ) |
104 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Rajyadharpur Desh Bandhu Bidyapiathof Rajyadharpur PS- Serampore, Hooghly) |
105 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Amulyakanan Bus Stand 2nd Floor Serampore, Hooghly) |
106 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Serampore Textile College ) |
107 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Baidyabati Banomali Mukherjee institution of Baidyabati PS- Serampore, Hooghly) |
108 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Sheoraphully Netaji Balika Mandir) |
109 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Baidyabati Vidyaniketan High School of Baidyabati PS- Serampore, Hooghly) |
110 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Amulya Kanan Bustand 1st FloorPS- Serampore, Hooghly) |
111 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Sheoraphully Surendranath Bidyaniketan of Sheoraphully PS- Serampore, Hooghly ) |
112 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Rishra Swatantra Hindi Vidyalaya of Rishra PS- Serampore, Hooghly) |
113 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Baidyabati Charusial Bose Balika Bidyalaya of Baidyabati PS- Serampore, Hooghly ) |
114 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Champsara High School Baidyabati PS- Serampore, Hooghly) |
115 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Simla High School of Simla PO- Mallickpara PS- Serampore, Hooghly) |
116 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Nabagram K.D Pal Bidyalaya PS- Serampore, Hooghly) |
117 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Rishra Bidyaptih Boys of Rishra PS- Serampore, Hooghly) |
118 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Serampore High Schoolof N.S AvenuePS-Serampore , Hooghly) |
119 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Chatra Nandalal Insitution of Chatra PS- Serampore, Hooghly) |
120 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Serampore Girl High Shcoolof J.N Lahiri Road PS- Serampore, Hooghly) |
121 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Rajyadharpur Girl high School of Rajyadarpur PS- Serampore, Hooghly) |
122 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Mahesh Parameswari Balika Bidyalaya ofMahesh PS- Serampore, Hooghly) |
123 | Supply & pouring of HSD for the hired DG set incl. handling cost( Log book and Fuel purches voucher is to be submitted with the bill)(Temporary Schedule of PGE-2024 sl no.40 page no.11)(for Serampore Union Institutionof Tin Bazar PS- Serampore, Hooghly) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail