}

Tender For Consultancy Services For Preparation Of Detailed Project Report For 4 Lane Bypasses To Villages (I) Lahli (Ii) Singhani (Iii) Kharak (Iv) Bamla On Nh-709E In Bhiwani Distt And Bypass To Tohana Town On Nh-148B In Fatehabad District In The H, Bhiwani-Haryana

Ministry Of Road Transport And Highways has published Tender For Consultancy Services For Preparation Of Detailed Project Report For 4 Lane Bypasses To Villages (I) Lahli (Ii) Singhani (Iii) Kharak (Iv) Bamla On Nh-709E In Bhiwani Distt And Bypass To Tohana Town On Nh-148B In Fatehabad District In The H. Submission Date for this Tender is 23-05-2024. Detail Project Report Tenders in Bhiwani Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

43131150
Tender For Consultancy Services For Preparation Of Detailed Project Report For 4 Lane Bypasses To Villages (I) Lahli (Ii) Singhani (Iii) Kharak (Iv) Bamla On Nh-709E In Bhiwani Distt And Bypass To Tohana Town On Nh-148B In Fatehabad District In The H
Open Tender
Indian
Haryana
Bhiwani
23-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Consultancy Services For Preparation Of Detailed Project Report For 4 Lane Bypasses To Villages ( I ) Lahli ( Ii ) Singhani ( Iii ) Kharak ( Iv ) Bamla On Nh-709E In Bhiwani Distt And Bypass To Tohana Town On Nh-148B In Fatehabad District In The Haryana

Key Value

Document Fees
INR 5000 /-
EMD
Refer document
Tender Value
Refer document

Attachment

FileName File Description File Size
ae8d24f3-7e53-4fe1-826a-b539b2b8b2df.html Tender Notice 0 KB
BOQ_844443.xls Tender Document 0 KB
RFP_DPR_NH709E_NH148B.pdf Tender Document 0 KB
RFP_DPR_NH709E_NH148B.rar Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

Name of Work:Consultancy Services for Preparation of Detailed Project Report for Bypasses to Villages (i) Lahli (ii) Singhani (iii) Kharak (iv) Bamla on NH-709E in Bhiwani Distt and Bypass to Tohana Town on NH-148B in Fatehabad District in the State of Haryana
Sl. No. Item Description
1I. Remuneration for Local Staff (Including per diem allowance) Professional Staff:
2Team Leader cum Highway Engineer
3Bridge Engineer
4Highway Engineer
5Meterial Engineer cum Geotechnical Engineer
6Survey Engineer
7Traffic/Road Signage/Marking and Safety Expert
8Environmental Specialist
9Quantity Surveyor
10Land Acquistion Expert
11Utility Expert
12SUB-TOTAL-1
13SUB-PROFESSIONAL STAFF :
14Sub-Professional-1
15Sub-Professional-2
16Sub-Professional-3
17Sub-Professional-4
18Sub-Professional-5
19Sub-Professional-6
20Sub-Professional-7
21SUB-TOTAL-2
22Total (Sub Total 1 + Sub Total 2):
23Note: For proper assessment of utility estimates and proper drainage system provisions, DPR consultant shall also engage an utility expert and drainage expert at sub-professional level, with relevant technical expertise in respective fields.
24II. SUPPORT STAFF
25Office Manager
26Typist
27Office Boy
28Night Watchmen
29Total:
30III. Transportation (Fixed Costs) Rate/Month
31The vehicles provided by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
32Total:
33IV. Duty Travel to Site (Fixed Costs): Note: Rate quoted includes Hotel charges, travel cost etc. complete.
34Duty Travel to Site (LS)
35Total:
36V. Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairing etc. (Rate per Month)
37Office Rent (Fixed Costs)
38Total:
39VI. OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) Rate/Month
40Office Supplies
41Drafting Supplies
42Computer Running Costs
43Domestic and International Communication
44Total:
45VII. OFFICE FURNITURE AND EQUIPMENT (Rental)
46Office Furniture and Ecquipment (LS)
47Total:
48VIII. REPORTS & DOCUMENTS PRINTING (Rate per Copy)
49Monthly report (3 copies per Month)
50Inception Report & QAP
51Environment and Social Impact Screening Report
52Draft Feasibility Report
53Final Feasibility Report
54Strip Plan with LA Reports
55Draft LA and Clearances I Report
56Final LA and Clearances I Report
57Draft Environmental Assessment Report & RAP
58Final Environmental Assessment Report and RAP
59Draft Detailed Design Report & Drawings etc.
60Draft EMP
61Draft Bidding Documents
62Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
63Final EMP.
64Final Bidding Documents
65Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each)
66LA & Clearances II Report
67Total:
68Note: In case of splitting of the project in packages after alignment is finalized, the additional payment in respect of reports and document printing shall be made on prorate basis of accepted financial proposal according to additional number of documents submitted, as mentioned above
69IX.Survey and Investigation: A. Topographical Survey (Fixed Rate)
70Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
71Detailed topographic surveys using mobile / aerial LiDAR or better Technology
72B. Investigation (Fixed Cost)
73Road and Bridge Inventory
74FWD Test and Pavement Evaluation
75Roughness Survey
76Axle Load Survey
77Material Survey and Investigation
78Sub-grade Investigation
79Traffice Survey
80Socio-economic & Census Survey/Studies
81Land Acquisition Studies
82Any other Investigations/Surveys
83*Sub-Soil Investigation (Boring)
84a) Boring in all type of soils (other than hard rock)
85b) Boring in hard rock
86Total:
87Note:*Quantities of boring shall be taken from Financial Proposal Form No.V. for financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, payment shall be made on the actual quantity of boring at rates quoted above by the consultant, which may be substantially more or less than the estimated quantities.
88C. Network Survey and GPR
89Network Survey of the existing Highways as a repository for civil works as per directions from Authority.
90GPR Survey for detection of under ground utilities
91Total:
92X. Cost of Supply and Fixing Boundary pillars
93Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
94Total:
95XI. Land Acquisition Team including support staff and logistics/ transportation. [A.] Land Acquisition Team including support staff :
96Ex-Land Revenue Inspector/ Officer or equivalent (1x8)
97Ex-Kanoogo/Girdwar or equivalent (1x8)
98Ex-Patwari or Equivalent (1x8)
99Typist (2x8)
100Peon (1x8)
101Number of Land acquisition Teams (One Only)
102Sub-Total [A]:
103B. Logistics for Land Acquisition Team
104Computer including necessary peripherals (2x8)
105Printers (2x8)
106Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km (1x8)
107Number of Land acquisition Teams (One Only)
108Sub-Total [B]:
109Total (Sub Total [A] + Sub Total [B]):
110Note: (i) The consultant shall provide one land acquisition expert along with allied team and supporting logistic as envisaged in clause 5.1.5.1 of TOR for each 100 km stretches proposed for DPR preparation or part thereof subject to the condition that such 100 km length shall not stretch beyond two adjoining districts (For example total length of package is 343 km, there will be four team).
111Estimate of costs for Expatriate consultants (in Indian Rupees) I. REMUNERATION OF EXPATRIATE STAFF including per diem allowances.
112Staff
113Sub-Professional-1
114Sub-Professional-2
115Sub-Professional-3
116Sub-Professional-4
117Sub-Professional-5
118Sub-Professional-6
119Sub-Total-I:
120II. Mobiliation and Demobilization
121A. International Airfares (Fixed costs)
122B. Inland Travel in Home Country (Fixed costs)
123C. Other Misscexpenses (like DA, internal travel expenses other incidentals)
124SUB-Total-II:
125Total(Sub Total-I + Sub Total-II):
126Total Cost Net of Goods and Service Tax: **Total cost net of Goods and Service Tax shall be considered for Financial Evaluation. Note: Payment will be made as per stipulations of the conditions of conntract.
127Goods and service Tax
128TOTAL COSTS (Including GST)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail