Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Tender For Insulation Refractory Work During Oh7. Submission Date for this Tender is 08-05-2024. Ceramic Fibre Products Tenders in SONEBHADRA Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 30-Apr-2024 | Date extension | Date | 08-05-2024 |
FileName | File Description | File Size |
39423671-9348-4709-8b88-e1766bc2ee39.html | Tender Notice | 0 KB |
BOQ_1591724.xls | Tender Document | 0 KB |
tdoc.pdf | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | When new cladding is to be provided with 18-24 Gauge (Aluminium sheet shall be provided by the department free of cost). Work includes fabrication and fixing of cladding structure. When one layer of mineral wool blankets/ of thickness 25/40/ 50/ 60/75 mm, are provided / fixed at site. |
2 | When new cladding is to be provided with 18-24 Gauge (Aluminium sheet shall be provided by the department free of cost). Work includes fabrication and fixing of cladding structure. When more than one layer of mineral wool blankets/ pads pipe section of thickness 25/40/50/60/75 mm, are provided / fixed at site. |
3 | When old/ removed cladding sheets to be fixed with the help of self tapping screws.When one layer of mineral wool blankets of thickness 25/40/ 50/ 60/75 mm, are provided or the old/ removed but usable are provided/ fixed at site. |
4 | When old/ removed cladding sheets to be fixed with the help of self tapping screws,When more than one layer of mineral wool blankets of thickness 25 /40/ 50/ 60 /75 mm, are provided or the old/ removed but usable are provided/ fixed at site. |
5 | Insulation of Headers in Pent House/ out side : When more than one layer of mineral wool blankets /pads of thickness 25/40/50/60/70 mm, are provided /fixed on the headers in pent house etc. |
6 | Appliatione of mineral wool blankets /pads and fixing with G.I wire on H,p/L.P. valves of boiler applicatin of insulating powder , hard lag/mastic compound & finishing /cladding with G.I /Aluminum sheets of 18-24 gauge wherever required as per site requirement or as instructed . |
7 | Application of Refractory in main boiler pressure parts heating zones. |
8 | cleaning of LTSH chamber |
9 | cleaning of ECO chamber |
10 | cleaning of gallery between RH & ARCH TUBES. |
11 | cleaning of pent house above furnace. |
12 | cleaning of gallery between PSH & RH in pent house. |
13 | cleaning of gallery between CRH header & HRH header in pent house. |
14 | cleaning of gallery between divisional superheater to platen superheater in pent house. |
15 | cleaning of gallery between/around all the four divisional superheater headers in pent house. |
16 | cleaning of extended furnace house between ist & iind pass. |
17 | cleaning of economiser hopper |
18 | cleaning of gallery along with water wall header left/right/front in pent house from divisional superheater to platen superheater area. |
19 | cleaning of hot SA duct from APH to windbox(L) |
20 | cleaning of hot SA duct from APH to windbox (-R) |
21 | cleaning of furnace windbox (L) |
22 | cleaning of furnace windbox (-R) |
23 | cleaning of interconnecting duct of hot SA |
24 | cleaning of inlet damper to outlet damper of air and flue gas duct of APH including APH |
25 | cleaning of penthouse roof of boiler |
26 | cleaning of dog house of boiler |
27 | cleaning of S-panel of boiler |
28 | Cleaning of buck stays of 1st and 2nd pass of boiler from 11 meter elevation upto 80 meter. |
29 | Repairing and rectification of boiler skin casing/high crown plate / Expension sheet etc inside penthouse using suitable electrode as per IBR |
30 | External cleaningof boiler |
31 | Providing scaffolding when working place height is beyond 3 mtr. And approach is not avaliable |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail