Tender For Construction For Installation Of New 33 Kv Vcb And M And R 33 Kv Vcb And Laying Of 33 Kv Xlpe 3X300 Sq. Mm In The Place Of Damaged Cable Of Various 33 11 Kv Substation Under Biswan Division Sitapur Under Business Plan 2024 25, sitapur-Uttar Pradesh

Madhyanchal Vidut Vitran Nigam Limited has published Tender For Construction For Installation Of New 33 Kv Vcb And M And R 33 Kv Vcb And Laying Of 33 Kv Xlpe 3X300 Sq. Mm In The Place Of Damaged Cable Of Various 33 11 Kv Substation Under Biswan Division Sitapur Under Business Plan 2024 25. Submission Date for this Tender is 15-04-2024. Circuit Breakers Tenders in sitapur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43121768
Tender For Construction For Installation Of New 33 Kv Vcb And M And R 33 Kv Vcb And Laying Of 33 Kv Xlpe 3X300 Sq. Mm In The Place Of Damaged Cable Of Various 33 11 Kv Substation Under Biswan Division Sitapur Under Business Plan 2024 25
Open Tender
Indian
Uttar Pradesh
sitapur
15-04-2024

Tender Details

Construction For Installation Of New 33 Kv Vcb And M And R 33 Kv Vcb And Laying Of 33 Kv Xlpe 3X300 Sq. Mm In The Place Of Damaged Cable Of Various 33 11 Kv Substation Under Biswan Division Sitapur Under Business Plan 2024 25

Key Value

Document Fees
INR 3540 /-
EMD
INR 43050.0 /-
Tender Value
INR 43.05 Lakhs /-

BOQ Items

Name of Work: “CONSTRUCTION FOR Installation of New 33 KV VCB and M& R 33 KV VCB and Laying of 33 KV XLPE 3x300 sq. mm in The Place Of Damaged Cable of Various 33/11 KV Sub-Station under Biswan Division-Sitapur. Under Business Plan 2024-25”.
Sl. No. Item Description
1Safe loading carriage including unloading & proper stacking of following store materials from any Electy.Store of Lucknow Zone to work site.
2Cost of 33 KV line Isolator
3Cost of 33 KV Bus Isolator
4Cost of Post Insulator
5Cost of 33 KV Lightening Arrester
6Cost of 33 KV VCB 800 Amp., 750 MVA
7Cost of 33 KV CT 400/200/1 Amp.
8Cost of 33 KV CT 200/100/1 Amp.
9Cost of 33 KV Single T/F Control Pannel with structure.
10Cost of 33 KV Single Feeder control pannel
1111 KV 3x300 SQ MM XLPE
1211 KV 3x120 SQ MM XLPE
13MS Channel 125x65, 3.2Mtr. Long 1,2,3,4 No Pieces for Top channel. 13.10 Kg/Mtr.+wastage.
14MS Angles 75x75x8, 2.6mtr long, total 5.2 @ 8.9 Kg/Mtr.
15MS Angles 75x75x6mm (6.8 Kg/Mtr.) for Neutral/CableStand
16Cost of ACSR Panther Conductor
17MS Channel 100x50 mm (9.6 Kg/Mtr.) for Cable Stand
1811 KV 3x300 SQ MM XLPE Cable Outdoor
1911 KV 3x300 SQ MM XLPE Cable Indoor
2011 KV 3x120 SQ MM XLPE Cable Outdoor
2111 KV 3x120 SQ MM XLPE Cable Indoor
22Lightening Arrestor, P.I. & CT Structure : Fabrication of Lightening Arrestor, P.I. & CT Structure 3.5 mtr. in height as per Drg. digging of two no pits of size 1.075x0.9x0.3 mtr. providing stone pad at the bottom of the pit and grouting of two legs of the Structure in CC(cement coarse sand and stone grit of 20mm gauge) of the ratio 1:4:8 in block of 1.075x0.3 mtr. including all civil material, T&P complete in all respect. The work includes dragging, shifting up to 40 Mtr., raising and erecting the two legs with runner on proper alignment and level and plumb. Both plinths of the structure shall be properly finished with smoothing of edges.
23Providing & Laying ,welding of G.I. strip 50x6mm size withLine Isolator structure.
24Isolator Structure: Fabrication of Isolator Structure 3.5 mtr in height as per Drg. digging of two no. pits of size 1.075x0.9x0.3 mtr. providing Stone Pad at the bottom of the pit and grouting of two legs of the isolator structure in CC(cement coarse sand and stone grit of 20mm gauge) of the ratio 1:4:8 in block of 1.075x0.3 mtr. including all civil material, T&P complete in all respect. The work includes dragging, shifting up to 40 Mtr., raising and erecting the two legs with runner on proper alignment and level and plumb. Both plinths of the isolator structure shall be properly finished with smoothing of edges.(All decentralised materials to be provided by Contractor).
25Fabrication and erection of cable support made of two pieces of MS channel 100x50mm, 3.0 mtr. long joined to each other by means of 5 no. MS Flat 50x6mm pieces of size 150mm long each by welding at equal intervals as per drawing and grouting in block of size 300x300x700mm (1:4:8) complete. This includes providing of required MS Clamp made of MS Flat holding the cable including nuts & bolts and fixing of XLPE cable.
26Plinth of VCB : Construction of Plinth of size 2.0 mtrx1.5mtrx0.9mtr. suitable for erection of upper structure of 33KV VCB including grouting of anchor bolts in proper alignment and level. Scope of work includes excavation of foundation base concreting in CC 1:3:6 (cement, find sand & brick ballast) 1st class brick work in cement mortor ratio 1:4:8 (cement, coarse sand and stone grit of 20mm gauge).
27Earthing for power T/Fby way of boaring and lowering of 40mm dia, 2.9 mm thick GI Pipe from ground upto the water level (minimum 60 feet deep) as per standard practice as per REC Drg.
28Earthing of 11 KV, 33 KV Switchgears equpiment by lowaring and boring of Chemical Earting outsite of switchyard and connecting through G.I. Strip 50x6mm with indoor/outdoor equipments. (All the matrial provided by the contrertor)
29Repair and Whole Maintenance of Existing 33 KV VCB ,Control Relay Panneland Line/ Bus Isolator.( All Defective item /parts in all these equipments will be supplied and replacedby the contractor.)
30Installation of VCB: Installation of 33KV VCB complete work including commissioning & testing.
31Supply of Fixing of24 Volt Battery & Battery Charger with Cabinet.
32Making vertical/horizontal/ jumper connections using Panther Conductor with existing busbargantry through PG Clamps and connecting all equipments with each other through connecting clamps. The work includes all the jumpes from busbar toT/F (1no. T/F bay) ( Change Old Dog Jumper by Panther Conducter In the area of EDD- Biswan )PG Clamps Provided by the contractor.
33Drilling and Laying of 3x300 Sqmm 33 KV, XLPE insulated U/G Cable in HDPE Pipe size of 150 mm dia (Pipe to be laid by Diggingmethod) doublecircuit below minimum 1.5 mtr. Depth from ground level.(HDPE.Pipeto be provided by contractor)
34Laying of 33 KV, 3x300 Sqmm XLPE Cable (single circuit) by HDDmethod depth minimum 1.2 mtr. Below ground level.
35Laying of 33 KV, 3x300 Sqmm XLPE Cable (single circuit) by digging method depth minimum 1.2 mtr. Below ground level and 750 mm wide by excavation of earth. The work include supplying of fine sand ,bricks,stone slab ,refilling and ramming of the left out soil and levelling etc.,Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring Making Joint Box by Cable Joint Kit Outdoor/ S/th.nd sealing both ends of the cable. (All the matrical provided by the contrector Expect Cable).
36Interpolling & ErectionOf Supports (STP 11 Mtr.& 13 Mtr.) with all fittingsin Midspan Pole In Old line For Maintaine Sag in 33 KV Line
37Opening and Removing OfOld & Existing Conductor From Existing 33 KV LineThen Laying , stinging and Final Sagging of ACSR Dog Conductoron The Pole.
38Hoisting of 33 KV 3X300 Sq. mm. XLPE cable on double pole including G.I. pipe of size 6" dia 3 M long and its jumpering complete with clamps, nuts and bolts. (GI Pipe,clamps ,PG Clamps, nut bolt etc to be provided by contractor,)
39Installation of P.I. & Lightening Arrestors : Assembling, installation & mounting of 3 No.(1set) L.A. & Post insulator on the L.A & P.I. Structure/complete with making earth connections (separate) and line connections. The work includes fabrication for fixing if required.
40Installation of CT: Installation of 3 No.(1 set) CT on the CT Structure along with CT Junction Box. The work includes fabrication for proper fixing of C.T.Ifrequired and proper commissioning & testing.
41Installation of Isolators: Assembling and installation of line/ bus isolator on the isolator structure adjusting of opening mechanis in proper alignment so as to ensure smooth operation of the same. In case of line isolator proper operation of earth links shall also be ensured. The work includes fabrication & proper connection with earthmat by G.I. erth strip 50x6mmfor proper flexing if required.
42Shifting carefully and installation of 33KV Single Transformer Control Panel in Control Room including fixing, bolting & grouting of above as per requared and testing, commisioning satisfaction of site incharge.
43Laying & dressing of 11KV 3x300 Sq.mm U/G cable from 5MVA T/F to 11KV incoming Switchgear by excavation of earth in the trench 450mm wide, 900mm deep providing 150mm fine sand cushion belowthe cable. The cable shall be duly protected by bricks, sand & stone slab and refilling & ramming of the left out soil. Spare cable shall be left and buried in the trench in the shape of rings at both ends. Cable laying work includes unrolling, cutting, making ring ,Making Joint Box by Cable Joint Kit Outdoor/ S/th.and sealing both ends of the cable. (All the matrical provided by the contrector Expect Cable).
44Supply and laying of following size Armoured Copper Control Cable through underground/cable trench/trenching SGR interlinking through proper connections to T/F Control panel/protection board/Battery and Battery Charger/Bunch joints, Relay 33/11KV T/F junction Box/33KV VCB, CTs etc. as per site conditions: (All the matrical provided by the contrector).
45Control Cable Tray
462x2.5 sq.mm.
474x2.5 Sq.mm
486x2.5 Sq.mm
49Painting of all structures and equipments.
50High Pressure Testing
51Road Cutting NOC charges documentation & approval fees etc
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail