| 1 | Rewiring for light point/ fan point/exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable and 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable as earth wire in existing surface/recessed steel conduit including dismantling as required |
| 2 | Group -A |
| 3 | wiring for ciruits/submain wiring alongwith earth wire with the following sizes of FRLS PVS insulated copper conductor, single core cable in surface/ recessed as required. |
| 4 | 2 X 2.5 sq. mm + 1 X 2.5 sq. mm earth wire |
| 5 | 2 X 4 sq. mm + 1 X 4 sq. mm earth wire |
| 6 | 2x6 sqmm + 1 X 6 sq. mm earth wire (Submain) |
| 7 | Supplying and fixing two module stepped type electronic fan regulator on the existing modular plate switch box including connections but excluding modular plate etc. as required |
| 8 | Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess, including providing and fixing 3 pin 5/6 A modular socket outlet and 5/6 A modular switch, connections etc. as required |
| 9 | Supplying and fixing suitable size GI box with modular plate and cover in front on surface or in recess, including providing and fixing 6 pin 5/6 & 15/16 A modular socket outlet and 15/16 A modular switch, connections etc. as required. |
| 10 | Supplying and fixing 3 pin, 5 amp ceiling rose on the existing junction box/ wooden block including connection etc as required. |
| 11 | Supplying and fixing brass batten/ angle holder including connection etc. as required |
| 12 | supply and fixing following rating double pole 240 volts isolator in the existingMCB DB complete with connection testing and commissioning etc |
| 13 | 63 AMP 4 POLE ISOLATOR |
| 14 | Supply and fixing following four Pole, 415 volts, isolator in the existing MCB DB complete with connections, testing and commsissioning etc. As required. |
| 15 | 40 A |
| 16 | Installation, testing and commissioning of ceiling fan, including wiring the down rods of standard length (upto 30 cm) with 1.5 sq. mm FRLS PVC insulated, copper conductor, single core cable, including providing and fixing phenolic laminated sheet cover on the fan box etc. as required |
| 17 | Supplying and fixing of following sizes of medium class PVC conduit along with accessoies in surface /recess including cutting the wall and making good the same in case of recessed conduitas required |
| 18 | 20mm |
| 19 | Installation of exhaust fanin existing , opening , including making good the damage, connection, testing, commisioning etc.as required |
| 20 | Supplying& fixingfolling way single pole and netural sheet MCBDistributan bord bus bar earth bar campleted in all respect. |
| 21 | 8 Way MCBDouble door distribution board |
| 22 | 12 way, Double Door |
| 23 | Supplying and fixing 5 A to 32 A rating, 240/415 V, 10 kA, \"C\" curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required |
| 24 | providing fixing 4.00MMdia copper wire on surface or in recess for loop earthing as required |
| 25 | Earthing with copper earth plate 600mm x3 mm thick including aecessorics and providing masonry encluding with cover plate having locking arrangement and watering pipe 2.7 meter long .etc. With charcoal/ coke and salt complete in all respect |
| 26 | Supply and erection of factory fabricated and wired Unit Comple Rate metal clad dust and vermin proof floor mounting panel TPN switch board complete with the following HRC type heavy duty TPN fuse switches with fuses and instrument chamber etc. complete in all respects.The instrument chamber shall be separate and shall comprise of flush type ammeter, voltmerer, selector switches for ammeter and voltmeter, instrument fuses, current transormer etc. The board shall have suitable capacity electroytic alumininum busbars as per IS8623 istulate with heat shrink sleeving and mountend on non hygroscopic supports such as CMC/DMC support with deteachable side covers and shall be suitable for extension on the sides. The switches shall be complete with suitable cable end boxes, reverse entery boxes in case of pedestaal type, cable sockets, compression glands and indicating lamp on incoming etc. The job includes the grounting of the board as per direction of Engineer-in-Charge. All coutgoing switches of 100 Amp. and above will be provided with ampere metre current transformers and selector switches and instrument fuses etc. The switches board shall be fabricated with CRCA sheet with a minimum thickness of 1.6 mm/2 mm. Cubicle type switch board shall be of cat A B & B-II and pedestal type for Cat-B and C only. |
| 27 | Incoming |
| 28 | 100 Amp TPN - 1 No |
| 29 | Outgoing - 63 Amp TNP 2 Nos |
| 30 | Cat. B. Cubicle Type |
| 31 | Incoming |
| 32 | 200 Amp TPN - 1 No |
| 33 | Outgoing -100 Amp TNP 2 Nos |
| 34 | Cat. B. Cubicle Type |
| 35 | NOTE: Excluding GST & EPF/ESI on employer part. |