Madhyanchal Vidut Vitran Nigam Limited has published Tender For The Work Of Construction Of 11/0.4 Kv S/S Of Various Distribution Transformers In Business Plan-2024-25 Under Various 33/11 Kv S/S Area Under Edd-Ii, Budaun.. Submission Date for this Tender is 26-04-2024. Distribution Transformer Tenders in Badaun Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 15-Apr-2024 | DATE EXTENSION2 | Date | 18-04-2024 |
2 | 18-Apr-2024 | DATE EXTENSION3 | Date | 22-04-2024 |
3 | 23-Apr-2024 | DATE EXTENSION03 | Date | 26-04-2024 |
Sl. No. | Item Description |
1 | The work of safe carriage of the following material from store center Nawada to work site under the jurisdiction of EDD-II, Budaun Approx. distance upto 0-50 Km. Including safe loading and unloading. |
2 | 11/0.4 KV 25 KVA T/F |
3 | 11/0.4 KV 63 KVA T/F |
4 | 11/0.4 KV 100 KVA T/F |
5 | 11/0.4 KV 250 KVA T/F |
6 | PCC Pole Support 8.5 Mtr. Long |
7 | ST Pole Support 11 Mtr. Long |
8 | 11 KV MS T-Off Channel |
9 | Top Channel (125x65x2240 mm) |
10 | S/S Base Angle (75x75x6x2028mm) bolt & Nut |
11 | 11 KV Disc Insulator Composite 45 KN (T&C Type) |
12 | 11 KV Pin Insulator Composite |
13 | 11 KV TPMO |
14 | ACSR Weasal Conductor |
15 | L.T. LEAD LT XLPE Cable 3.5x70 Sqmm |
16 | L.T. LEAD LT XLPE Cable 3.5x150 Sqmm |
17 | Stay Complete |
18 | Earthing Complete |
19 | ABC Cable (3x95+1x35+1x16) sqmm |
20 | ABC Cable (3x50+1x35+1x16) sqmm |
21 | ABC Cable (3x120+1x35+1x16) sqmm |
22 | 3 Phase Distribution Box |
23 | L.T. Cable 1x240 Sqmm |
24 | Droper Channel |
25 | Construction of 250 KVA T/F plinth 1.5x1.5x2 Mtr. for mounting T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect as per RESSPO Norms. |
26 | Cage fencing of 250 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5"(L)x5"(W)x8’(H) by strenghtening of wire mesh 20x3 mm M.S. flat haorizentally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation. |
27 | Pipe Earthing of Transformer (By boring of 4 inch diameter 20 m deep, 40 mm diameter A Class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5m length is inserted at the bottom, Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work contractor will provide all material, manpower, T&P, safe carriage of material to worksite. Above work will be carried out under supervision of concerned JE/SDO/EE) |
28 | Construction/Erection of Double Pole (except pole) Suitable for following T/Fs including fitting of all accessories (All necessary clamps, Nut & Bolts etc. shall be provided by the contractor for execution of work as per RESSPO Norms). |
29 | 11/0.4 KV 25 KVA T/F |
30 | 11/0.4 KV 63 KVA T/F |
31 | 11/0.4 KV 100 KVA T/F |
32 | Mounting of following T/F,s as per norms complete in all respect - |
33 | 11/0.4 KV 25 KVA T/F |
34 | 11/0.4 KV 63 KVA T/F |
35 | 11/0.4 KV 100 KVA T/F |
36 | 11/0.4 KV 250 KVA T/F |
37 | Erection of Single PCC 8.5 Mtr. Long in H.T/L.T lines including fitting of all accessories as per RESSPO Norms (All necessary clamps, Nut & Bolts etc. shall be provided by the contractor for execution of work as per RESSPO Norms). |
38 | Grouting of PCC 8.5 Mtr. Long/ST Pole 11 Mtr. Long with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms. (All Grouting material shall be provided by the contractor). |
39 | Laying, Stringing, Sagging & Jumpring of Following Conductor complete in all respect as per RESSPO Norms. |
40 | ACSR Weasal Conductor |
41 | L.T. LEAD LT XLPE Cable 3.5x70 Sqmm |
42 | L.T. LEAD LT XLPE Cable 3.5x150 Sqmm |
43 | ABC Cable (3x95+1x35+1x16) sqmm |
44 | ABC Cable (3x50+1x35+1x16) sqmm |
45 | ABC Cable (3x120+1x35+1x16) sqmm |
46 | L.T. Cable 1x240 Sqmm |
47 | Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. (All the grouting material shall be provided by the contract for execution of work). |
48 | The work of driving the earthing electrode and making connections with GI wire. |
49 | Installation, Fixing & Fabrication of 11 KV fuse set (Including Cost of Fuse set) Installed on midway of 11 KV double pole structure with mention material specification (MS Channel 100x50x2028mm), Iron Strip (50x5x305 mm) & Fuse wire of required capacity etc. shall be provided by the contractor for execution of work as per RESSPO Norms. |
50 | Fixing of danger board on each location and G.I. barbed wire including proper clamping as per RESSPO Norms. (Danger Board shall be provided by the contractor as per details given in S.No. 14 as per RESSPO Norms). |
51 | Erraction/Fixing of Tailess Unit (400 A) (Tailess Unit shall be provided by the contractor as per RESSPO Norms). complete in all respect as per |
52 | Erection & Fixing of 11 KV TPMO set with handle on existing double pole including providing of clamps and nut & Bolts and jumpering of both side by TPMO complete in all respect. |
53 | Errection and commissioning of 3 Phase Distribution Box on the LT Poles (All the material required shall be arranged by the contractor for errection and commissioning of distribution boxes except distribution box). |
54 | The following Decentralized material shall be provided by the contractor for execution of work as per RESPO Norms (the material shall be purchased from approved vendor of Discom). |
55 | Holding Clamps for S/s with Bolt & Nuts |
56 | Holding Clamps for LT T-OFF |
57 | 11 KV F Clamp with Nut & Bolt |
58 | PG Clamp |
59 | Stone Pad |
60 | Danger Board |
61 | Barbed Wire |
62 | 3 Phase Distribution Box Clamps |
63 | Piercing Connector |
64 | LT Shackle Insulator |
65 | N&B for Shackle Insulator |
66 | LT Clamps with N&B for Shackle Insulator |
67 | Al. Lugs for 150 KV Sqmm Cable |
68 | Al. Lugs for 240 KV Sqmm Cable |
69 | Stay Insulator |
70 | LT Tailess Unit (400A) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail