}

Tender For The Work Of Construction Of 11/0.4 Kv S/S Of Various Distribution Transformers In Business Plan-2024-25 Under Various 33/11 Kv S/S Area Under Edd-Ii, Budaun., Badaun-Uttar Pradesh

Madhyanchal Vidut Vitran Nigam Limited has published Tender For The Work Of Construction Of 11/0.4 Kv S/S Of Various Distribution Transformers In Business Plan-2024-25 Under Various 33/11 Kv S/S Area Under Edd-Ii, Budaun.. Submission Date for this Tender is 26-04-2024. Distribution Transformer Tenders in Badaun Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43117291
Corrigendum : Tender For The Work Of Construction Of 11/0.4 Kv S/S Of Various Distribution Transformers In Business Plan-2024-25 Under Various 33/11 Kv S/S Area Under Edd-Ii, Budaun.
Open Tender
Indian
Uttar Pradesh
Badaun
26-04-2024

Tender Details

Tender For The Work Of Construction Of 11 / 0.4 Kv S / S Of Various Distribution Transformers In Business Plan-2024-25 Under Various 33 / 11 Kv S / S Area Under Edd-Ii, Budaun.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 15-Apr-2024 DATE EXTENSION2 Date 18-04-2024
2 18-Apr-2024 DATE EXTENSION3 Date 22-04-2024
3 23-Apr-2024 DATE EXTENSION03 Date 26-04-2024

Key Value

Document Fees
INR 3540 /-
EMD
INR 39000.0 /-
Tender Value
INR 39 Lakhs /-

BOQ Items

Name of Work: For the work of construction of 11/0.4 KV S/S of various distribution transformers in Business Plan-2024-25 under various 33/11 KV S/s area under EDD-II, Budaun.
Sl. No. Item Description
1The work of safe carriage of the following material from store center Nawada to work site under the jurisdiction of EDD-II, Budaun Approx. distance upto 0-50 Km. Including safe loading and unloading.
211/0.4 KV 25 KVA T/F
311/0.4 KV 63 KVA T/F
411/0.4 KV 100 KVA T/F
511/0.4 KV 250 KVA T/F
6PCC Pole Support 8.5 Mtr. Long
7ST Pole Support 11 Mtr. Long
811 KV MS T-Off Channel
9Top Channel (125x65x2240 mm)
10S/S Base Angle (75x75x6x2028mm) bolt & Nut
1111 KV Disc Insulator Composite 45 KN (T&C Type)
1211 KV Pin Insulator Composite
1311 KV TPMO
14ACSR Weasal Conductor
15L.T. LEAD LT XLPE Cable 3.5x70 Sqmm
16L.T. LEAD LT XLPE Cable 3.5x150 Sqmm
17Stay Complete
18Earthing Complete
19ABC Cable (3x95+1x35+1x16) sqmm
20ABC Cable (3x50+1x35+1x16) sqmm
21ABC Cable (3x120+1x35+1x16) sqmm
223 Phase Distribution Box
23L.T. Cable 1x240 Sqmm
24Droper Channel
25Construction of 250 KVA T/F plinth 1.5x1.5x2 Mtr. for mounting T/F including foundation work (below ground 0.5 M), Brick work, RCC slab of 4” thickness and plastering in 1:6 ratio with 02 Nos channel pieces of 1.5 mtr long of size 100x50x6 mm compete in all respect as per RESSPO Norms.
26Cage fencing of 250 KVA Plinth mounted transformer in Town areas to avoid electrical human/cattle accidents by fabrication of cage (1 Inch Sq wiremesh) made of 10 No gauge in suitable size angle iron frame of size 7.5"(L)x5"(W)x8’(H) by strenghtening of wire mesh 20x3 mm M.S. flat haorizentally as well as vertically, Grouting the panel with 1:2:4 cement/coorse send/brick ballast. The Frame should be bolted on angles at the four corners so that frame may be un-bolted/bolted at the time of replacement of the transformer. Provision of 1 gate should be there for maintenance of the transformer. Painting (1 coat of red oxide + 2 coat of Bus green enamel paint). The wire mesh should be earthed with 50x6 mm MS earthing strip with existing earthing of Transformer Body. All men, material and T&P provided by the contractor to complete the fabrication, transportation and installation.
27Pipe Earthing of Transformer (By boring of 4 inch diameter 20 m deep, 40 mm diameter A Class GI pipe is inserted to a depth of 20 m and a holed pipe of 1.5m length is inserted at the bottom, Tighten one end of the MS strip of size 50x6mm with the nut bolt with the neutral of the converter and weld the other end with the GI pipe inserted in the boring for earthing. Putting a socket on the upper part of the pipe (mouth) so that water can be poured into it to retain moisture. To complete the work contractor will provide all material, manpower, T&P, safe carriage of material to worksite. Above work will be carried out under supervision of concerned JE/SDO/EE)
28Construction/Erection of Double Pole (except pole) Suitable for following T/Fs including fitting of all accessories (All necessary clamps, Nut & Bolts etc. shall be provided by the contractor for execution of work as per RESSPO Norms).
2911/0.4 KV 25 KVA T/F
3011/0.4 KV 63 KVA T/F
3111/0.4 KV 100 KVA T/F
32Mounting of following T/F,s as per norms complete in all respect -
3311/0.4 KV 25 KVA T/F
3411/0.4 KV 63 KVA T/F
3511/0.4 KV 100 KVA T/F
3611/0.4 KV 250 KVA T/F
37Erection of Single PCC 8.5 Mtr. Long in H.T/L.T lines including fitting of all accessories as per RESSPO Norms (All necessary clamps, Nut & Bolts etc. shall be provided by the contractor for execution of work as per RESSPO Norms).
38Grouting of PCC 8.5 Mtr. Long/ST Pole 11 Mtr. Long with 1:4:8 mixture in size(450x450x1500mm.) including cost of cement/BB & sand Required as per RESSPO Norms. (All Grouting material shall be provided by the contractor).
39Laying, Stringing, Sagging & Jumpring of Following Conductor complete in all respect as per RESSPO Norms.
40ACSR Weasal Conductor
41L.T. LEAD LT XLPE Cable 3.5x70 Sqmm
42L.T. LEAD LT XLPE Cable 3.5x150 Sqmm
43ABC Cable (3x95+1x35+1x16) sqmm
44ABC Cable (3x50+1x35+1x16) sqmm
45ABC Cable (3x120+1x35+1x16) sqmm
46L.T. Cable 1x240 Sqmm
47Grouting of stays, 1:4:8 cc ratio (600x600x300mm.) as per RESPO norms. (All the grouting material shall be provided by the contract for execution of work).
48The work of driving the earthing electrode and making connections with GI wire.
49Installation, Fixing & Fabrication of 11 KV fuse set (Including Cost of Fuse set) Installed on midway of 11 KV double pole structure with mention material specification (MS Channel 100x50x2028mm), Iron Strip (50x5x305 mm) & Fuse wire of required capacity etc. shall be provided by the contractor for execution of work as per RESSPO Norms.
50Fixing of danger board on each location and G.I. barbed wire including proper clamping as per RESSPO Norms. (Danger Board shall be provided by the contractor as per details given in S.No. 14 as per RESSPO Norms).
51Erraction/Fixing of Tailess Unit (400 A) (Tailess Unit shall be provided by the contractor as per RESSPO Norms). complete in all respect as per
52Erection & Fixing of 11 KV TPMO set with handle on existing double pole including providing of clamps and nut & Bolts and jumpering of both side by TPMO complete in all respect.
53Errection and commissioning of 3 Phase Distribution Box on the LT Poles (All the material required shall be arranged by the contractor for errection and commissioning of distribution boxes except distribution box).
54The following Decentralized material shall be provided by the contractor for execution of work as per RESPO Norms (the material shall be purchased from approved vendor of Discom).
55Holding Clamps for S/s with Bolt & Nuts
56Holding Clamps for LT T-OFF
5711 KV F Clamp with Nut & Bolt
58PG Clamp
59Stone Pad
60Danger Board
61Barbed Wire
623 Phase Distribution Box Clamps
63Piercing Connector
64LT Shackle Insulator
65N&B for Shackle Insulator
66LT Clamps with N&B for Shackle Insulator
67Al. Lugs for 150 KV Sqmm Cable
68Al. Lugs for 240 KV Sqmm Cable
69Stay Insulator
70LT Tailess Unit (400A)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail