Kerala Electrical And Allied Engineering Co Limited-KEL has published Tender For Smart City - Upgradation Of Azhankal Walkway- Hanging Bridge In Thiruvananthapuram-Civil Works. Submission Date for this Tender is 06-05-2024. Footpath Work Tenders in Ernakulam Kerala. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 15-Apr-2024 | Due date extension Corrigendum | Date | 23-04-2024 |
2 | 24-Apr-2024 | Date Corri | Date | 29-04-2024 |
3 | 30-Apr-2024 | Date Corrigendum3 | Date | 06-05-2024 |
FileName | File Description | File Size |
c6b8469f-cb95-4b14-a4c0-ea329fefb8e4.html | Tender Notice | 0 KB |
BOQ_1045012.xls | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Civil works |
2 | Conducting Soil Investigation, Detailed Report and connected works, etc. at 2 banks of the river |
3 | Dismantling of existing steps and levelling the ground for providing pile and pile cap (As per actuals) |
4 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
5 | Making bund by using coconut piles and sheets and filling with contractor"s own earth fit for the pile driving with all accessories including material and labour etc complete (As per actual material and Labour Supplied). |
6 | Making a platform by filling with contractor"s own earth fit for placing tripod with all accessories including material and labour etc complete |
7 | Providing, driving and installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap): 600 mm dia piles |
8 | Pile Socketing 600mm dia for a min. of 600mm depth |
9 | Supply of MS plates confirming to IS 2062GrB including cost of conveyance charges |
10 | Fabrication, erection and commissioning of Structural steel Embedded parts in IS2062 Grade and accessories as per approved specifications, drawings and directions of deptl officer at site including cost of labour , machinery , incidental and handling charges etc complete but excluding cost of material already supplied |
11 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) |
12 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately. All work upto plinth level |
13 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately. All work above plinth level upto floor V level |
14 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more |
15 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more |
16 | Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete |
17 | Centering and shuttering including strutting, etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts |
18 | Centering and shuttering including strutting, etc. and removal of form for: Lintels, beams, plinth beams, girders bressumers and cantilevers |
19 | Centering and shuttering including strutting, etc. and removal of form for: Stairs, (excluding landings ) except spiral - staircases) |
20 | 12 mm cement plaster of mix: 1:4 ( 1 cement : 4 fine sand) |
21 | Finishing walls with Acrylic Smooth exterior paint of required shade: New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) |
22 | Supplying and Fixing of 2nos Inaugural Stone and 2 Nos. Name board as directed by the engineer in charge |
23 | EXCLUSIVE OF GST |
24 | Note :1 All materials,Items, Equipment shall be best branded items with IS and approved byclient/KEL |
25 | 2:Rate should be inclusive ofInsurance,Transportation, delivery and installation cost for all items |
26 | 3.Rate should be Exclusive of GST. |
27 | 4.Work should be executed as per DSR/PWD specification and direction of Engineer at site. |
28 | 5.CEMENT: Make use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference. |
29 | 6.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference. |
30 | 7.STEEL REINFORCEMENT: Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference |
31 | 8.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.) |
32 | 9. ACRYLIC SMOOTH EXTERIOR PAINT/ SYNTHETIC ENAMEL PAINT/WHITE CEMENT BASED PUTTY/ CEMENT PRIMER: Make: Asian, Berger, Nerolas or eq. in the order of pref. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy