| 1 | Detail of Work |
| 2 | Safely Carriage of 63/100 KVA T/F from ESC, SRE to Site of work including loading & unloading at both ends. |
| 3 | Safely carrage of PCC Pole 8.5 Mtr Long from ESC SRE to site of work including loading and unloading at both ends. |
| 4 | Safely carriage of Line Material (Except PCC Pole/Weasel conductor)ESC SRE to site of works through privet vehicle including loading and unloading at both ends. (Distance 0 to 30 K.M.) |
| 5 | Safely cartage ofAB Cable (3x120+x1x95+1x16) /3x95/3x50 from ESC, SRE to the site of work including loading unloading at both ends. (Dist. up to 30 KM.) |
| 6 | Laying Lifting stringing & Sagging of ABC Cable size 3x120+x1x95+1x16/3x95/3x50 sq.mm. including fixing of all type clamps and connector of all accessories. |
| 7 | Fabrication and Erection of D/P on PCC poles8.5 Mtr. Long with complete fitting including concreting in block of 450x450x1500mm. in ratio 1:4:8 with cement, sand and brick ballast size 1”x1.5” as per RESPO specification. |
| 8 | Safe installation of 63/100 KVA T/F on the D/P with complete fittings including making connections and commissioning. |
| 9 | Safely carriage of ACSR weasel conductor from ESC SRE to site of work including loading and unloading at both ends. |
| 10 | Grouting of stay rods by digging of pits in block 600x600x300 MM & cementconcreting in ratio 1:4:8 with cement, sand and brick ballast and nozzling of stay wire 7/10 SWG and fitting the same on the pole including fixing of stay insulator in stay wire. |
| 11 | Laying, lifting, stringing, sagging jump ring & binding of ACSR weasel conductor for HT/LT Line. |
| 12 | Removal of 100 KVA T/F from the existing D/P after opening HT & LT connection and with shifting the T/F from the site to ESC, SRE/JE store with loading & unloading at both ends. |
| 13 | Safe cartage of 250 KVA T/F from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 25 km.) |
| 14 | Constriction of plinth for installation of 250 kv T/F of size 1.5x1.5x1.5 mtr made of 9”inch thick wall in all four sides with 6”inch thick RCC top duly filled with sand and plastered 12mm thick in ratio 1:4 with cement and sand on outer surface of brick wall. |
| 15 | Safe installation of 250 KVA T/F on the Plinth with complete fittings including making connections and commissioning. |
| 16 | Wire mesh fencing of 250 KVA T/F size 2.5x2.5x2.5 mt. grouting making frame of MS angle 45x45x6 mm and fixing four no. MS strip size 25x6 mm at equal distance in between the frame and fixing squre mesh 50 mm square in each frame the fencing should cover all side of T/F with providing 1 No. door size 6\"x3\" with sitakni & Dandala. |
| 17 | Pipe/Water Level Earthing of 250 KVA T/F (1 No body & 1 No. neutral earthing) by boring of 60 Ft deep & fixing of 60 ft. G.I pipe 11/2\" Dia (Jindal Class B) and connecting with G.I. Strip of size 40x5 mm and G.I wire at bottom of G.I pipe to the T/F providing of required charcoal & salt in the pipe |
| 18 | Providing of Brass Lug |
| 19 | Providing of Aluminum Lug |
| 20 | Safe cartage of Fuse Set from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 30 km.) |
| 21 | Safely Fixing of Fuse set properly. |
| 22 | Safe cartage of TPMO Set from ESC,SRE, to the site of work including loading & unloading at both ends. (Dist. Upto 30 km.) |
| 23 | Safely fixing of TPMO Set Properly |
| 24 | Providing of PRC Clamp |
| 25 | Providing of Nut & Bolts |
| 26 | Providing of I-hook |
| 27 | Providing of Suspension clamp |
| 28 | Providing of Dead & clamp |
| 29 | Earthing of pole by Earthing rod. |
| 30 | Laying of LT/XLPE cable 1*240 sq.mm/3.5*70 sq.mm as per respo specification. |