| 1 | Excavation in foundation in ordinary soil (Loam Clay or Sand) including lift upto 1.5m and lead upto 30m and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of the foundation work. (CSI No. 4.01) |
| 2 | Concrete with 4cm gaugestone ballast, coarse sand& cement in proportion of 12:6:1 in foundations &under floors including supply of all materials, labour and tools and plants etc. required for proper completion. (CSI No. 5.02) |
| 3 | Cement concrete with 2cm gauge approved hard stone ballast,coarse sand and cement in proportion of 4:2:1including supply of all materials, labour,side shuttering ifrequired and T&P etc. required for proper completion of work. (CSI No. 5.06) |
| 4 | RCC work with cement, approved coarse sand and2 cm gauge graded approved hard stone ballast like granite, quartzite etc from Dalla, Jhansi or other quarries in proportion 1:1.5:3in lintels of doors and windows, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P. . (CSI No. 5.23) |
| 5 | RCC work with cement, approved coarse sand and2 cm gauge graded approved hard stone ballast like granite quartzite etc from Dalla, Jhansi or other quarries in proportion1:1.5:3 in raft foundation and footings , excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P. (CSI No. 5.27) |
| 6 | RCC work with cement, approved coarse sandand2 cm gauge graded approved hard stone ballast like granite, quartzite etc from Dalla, Jhansi or other quarries in proportion 1:1.5:3in RCC T beam-slab and column, excluding supply of reinforcement & its bending but including its fixing and binding the same with binding wire, including cost of all other materials labour and T&P . (CSI No. 5.29) |
| 7 | First class brick work in 1:6 cement and coarse sandmortar in foundation and plinth including supply of allmaterials, labour & T&P etc. required for proper completion of work. (CSI No. 6.01) |
| 8 | First class brick work in 1:6 cement and coarse sandmortar in super structure including necessary cutting and moulding of bricks as required and also including honeycomb brick work, thickness of wall not to be less than one brick thickness including supply of allmaterials, labour & T&P etc. required for proper completion of work. (CSI No. 6.01+6.07+6.08) |
| 9 | Mild Steel or Iron work in heavy sizes such as trusses built upgates, door frames, record, racks roof work gates etc. wrought torequired form including holes rivetting or welding where necessary and also fixing in proper position and alignment including cost of all materials supplied by contractor. (CSI No. 9.01) |
| 10 | TMT/Tor steel in plain work such as reinforced concrete orreinforced brick work (when not included in an over all rates)wrought to required shape as necessary including bending forproper completion of the work and including supply of steel its wastage, bend, hooks and authorized overlapping shall be measured. (Steel shall be arranged by the contractor) (CSI No. 9.03) |
| 11 | Grouting of vertical or inclined post of pale/chain/security fencing in truelevel, alignment and in plumb or inclination as required,including cost of all labour, materials and T&P required forproper completion of work. ( Post and concrete for grouting shall be measured separately) (CSI No. 9.28) |
| 12 | P/F Concertina coilfencing with required dia. 600 mm upto 3 M height of wall between existing angle iron ‘Y’ shaped placed 2.4 M or 3.0 M apart and with 6 horizontal R.B.T. stud tied with G.I. staples and G.I. clips to retain horizontal including necessary bolts or G.I. barbed wire tied to angle iron all complete ( No. of rounds will be 7 to 8 in one Meter length) as per direction of Engineer I/C with reinforced barbed tape (R.B.T.)/ Spring core (2.5mm thick ) wire of high tensile strength of 165 kg/Sqmm with tape ( 0.52 mm thick ) of supreme make or equivalent and weight 43.478 gm/meter ( cost of MS angle, C.C. blocks shall be paid separately).(CSI No. 9.37) |
| 13 | 12 mm thick plaster with cement mortar consisting of one part of cement & six part of coarse sand(1:6),minimum thickness not to be less then 10 mm including supply of all material, labour and T&P etc for proper completion of work.(CSI No. 11.09) |
| 14 | Add for extra labour and materials for plaster over rough face ofone brick thick wall.(CSI No. 11.12) |
| 15 | Providing (12x15) mm section groove in plasterincluding all material, labour andT&P etc. required for proper completion of the work. (CSI No. 11.16) |
| 16 | Painting or varnishing new iron work in small areas or new woodwork with one coat of ready mixed priming paint and one coat ofapproved superior quality ready mix paint \"Luxol\" or equivalentbrand or varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should conform to the I.S. 103-1950. (CSI No. 13.01) |
| 17 | Same as in itemno (17)above but for every coat after first coat. (CSI No. 13.02) |
| 18 | Painting one coat with APEX or equivalent brand weather coat paint on new wall surfaces (well prepared with Birla putty and one coat of primer ICI or equivalent which shall be paid separately) including through washing with water including cost of all materials, labour, T&P required for proper completion of work. (CSI No. 13.22) |
| 19 | Same as in itemno (19) above but for every coat of additional APEX or equivalent brand weather coat paint . (CSI No. 13.23) |
| 20 | Providing and fixing of 110 mm dia PVC pipe 6 Kg/ Sq.cm forwith special such as Tee, bend, socket, elbow etc including supply of all labour,material,T & P etc complete required for proper completion of work. (CSI No. 26.17) |