Hindu Religious And Charitable Endowments Department-HRCE has published Tender For Painting The Sannathis, Laying Cut Stone Flooring, Construction Of Compound Wall, Repair & Resetting The Mahadwaram Of Arulmigu Agatheeswarar Temple At Pennalur Village, Thiruperumbudur Taluk And Kancheepuram District.. Submission Date for this Tender is 09-05-2024. Wall Construction Tenders in Thiruvallur Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 02-Apr-2024 | Date extension | Date | 17-04-2024 |
2 | 02-Apr-2024 | Other corrigendum | Other | 17-04-2024 |
3 | 17-Apr-2024 | date changed | Date | 24-04-2024 |
4 | 24-Apr-2024 | date extended | Date | 09-05-2024 |
FileName | File Description | File Size |
d317e135-ef80-468f-af17-66016e428ddb.html | Tender Notice | 0 KB |
BOQ_536719.xls | Tender Document | 0 KB |
co.pdf | Tender Document | 0 KB |
conditions2.pdf | Tender Document | 0 KB |
Tendernotice_1.pdf | Tender Document | 0 KB |
Tendernotice_2.pdf | Tender Document | 0 KB |
Sl. No. | Item Description |
1 | Removing the undulated and dislodged stone lements like wall, thoon, bothiyal, pavukkal, uthiram, flooring from urchavar mandapam and stacking it for later use refixing including cost and conveyance of labour, handling and etc., all complete complying with standard specification. |
2 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by thedepartmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. |
3 | Supplying and filling in foundation and basement with filling sand in layers of 150mm thickness well watered rammed and consolidated complying with relevant std specification including cost of supplying filling sand. |
4 | Lime concrete 1:5:10 (One part of lime five part of sand and ten part of HBG jelly) for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc.,complete as per Std, Specification and as directed by the Dept, Officers |
5 | Random Rubble masonry work in lime mortar 1:2 ( One part of lime and two part of sand) Using selected stones and bond stones in foundation and basement including dewatering wherever necessary proper setting, curing etc., complete in all respectscomplying with relevant standard Specifications. |
6 | Refixing the removed stone elements like kabothavari, pavukkal, pristharam, wall stones from mahadwaram including labour, handling and fixing etc., all complete complpying with standard specification. |
7 | Kabothavari, Pavukkal, Pristharam, Wall stones |
8 | Supplying new stones for damaged and missing stone elements such asdhinsu course, wall stones, pristharam, pavukkal and kabothavari etc., from mahadwaram including cost and conveyence excluding dressing and fixing etc., all complete. |
9 | Dressing and fixing for new stone element like dhindu course, wall stones, pristharam, pavukkal and kabothavari etc., including cost and conveyence excluding cost of stone etc., all complete. |
10 | Dhindu course |
11 | Wall stones |
12 | Pristharam |
13 | Pavukkal |
14 | Kabothavari |
15 | Labour charges for Pointing the Cut stone masonary work with lime mortar 1:1.5 (one part of lime and one point five part of sand ) excluding cost ofcut stone but including all labour charges,scaffolding etc.. complete with standard specifications. |
16 | Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With lime mortar 1:1.5 (one part of limet and one point five part of sand). |
17 | Scaffolding charges for Vimanans andgopurams with casurina posts coconut or plamtrees wherever necessaryfor main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft. |
18 | Vimanam/ Gopuram upto 15"-00" ht |
19 | Vimanam/ Gopuram upto 25"-00" ht |
20 | Providing new sudhai vigrahams in the vimanams and Rajagopurams with Copper rod reinforcement of suitabledia with binding wires wherever necessary, shaping the core with broken bricks set in lime mortar 1:1.5 (one part of lime and one point five part of sand)finishing the same with lime mortar 1:1.5 (one part of lime and one point five part of sand)bringing to the correct shape (Lakshana) in conformist with silpa sastra inclusive of special ornaments, weapons, peedam etc., complete and providing lime mortar. Nayam theervai wherever necessary. inclusive of cost and conveyance of all materials, such as cement broken bricks, and Copper rods. binding wire all labour for working in heights, curing lifting of materials etc., complete including Exterior Emulsion painting two coats over a primary coat(one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per prathima lakshans, Vigraham height is measurable from the crown top to the bottom of foot only If peetam is provided the rate with peetam may be adopted as detailed hereunder) |
21 | Sudhai size above1" 0" up to 2" 6" |
22 | Sudhai size above2" 6" up to 3" 6" |
23 | Sudhai size above 3" 6" up to 4" 6" |
24 | Brick work in lime mortar 1:2 (one part of lime and two part of sand) using country brick of size 83/4"x41/4"x2 3/4" including cost and conveyance of all materials and labour charges and all other incidental charges etc completc complying with standard specification. |
25 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with lime mortar 1:1.5 (one part of lime and one point five part of sand) complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plasteringwith lime mortar 1:1.5 and finishing with final ornamental plastering and nayam theervani including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area.for kalkaram |
26 | For kalkaram |
27 | Plastering with Cement mortar 1:5 (one part of cement and five part of sand), 12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications. |
28 | Plastering with lime mortar 1:1.5 (one part of lime and one point five part of sand), 12mm thick including cost and conveyance of all materials and all labour charges, curing etc,complete complying with standard specifications. |
29 | Special plastering for R.C.C. slab beam and sunshades with Cement mortar 1:3 (one part of cement and three part of sand), 10mm thickincluding cost and conveyance of all materials and labour charges, curing etc. complete complying with standard specifications. |
30 | Painting with multicolour (Panchavarnam)good water based exterior emulson paints complete for the Vinamans/Gopurams, including costand conveyance of all materials, lobour charges including Artist painter, working in heights, lifting of material, cost of brushes etc,complete-which including all extra for foldings-100sft, superficial area. |
31 | Vimanam / gopuram of ht. Up to 15"0" excluding Kalkaram |
32 | Vimanam / gopuram of ht. Up to 25"0" excluding Kalkaram |
33 | Painting two coat with approved water based Exterior Emulsion over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curingin all floors including brushes etc., complete as per specification. -10 m 2 |
34 | Supplying & fixing Teak wood temple type door including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete with std. Specifications |
35 | Door size 1.37m x 2.00m |
36 | Door size 1.00m x 1.82m |
37 | Door size 2.04m x 2.47m |
38 | Varnishing the new wood work with two coats of Varnish of good quality andcolor over one coat of primer over new wood workinclude costs of all materials, brushescharges etc, complete complying with standard specifications. |
39 | Weathering course concrete with broken jelly 20mm size and pure slaked lime over pavukkal, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications. |
40 | Finishing the top of roof with one course of machine pressed tiles 20cmx 20cmx20mm of approved quality laid in lime mortar 1:1.5 (one part of lime and one point five part of sand),12mm thick mixed with water proofing compound two percent by weight of cement usedetc, complete with standard specifications. |
41 | Sub Total |
42 | GST @ 18% |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail