}

The Work Of Increasing The Capacity Of 11/0.4 Kv Substations Currently Operating Under The Distribution Areas Of Kaushambi And Chail Andas Under The Area Of ​​Electricity Distribution Board Kaushambi., kaushambi-Uttar Pradesh

Purvanchal Vidyut Vitaran Nigam Limited has published The Work Of Increasing The Capacity Of 11/0.4 Kv Substations Currently Operating Under The Distribution Areas Of Kaushambi And Chail Andas Under The Area Of ​​Electricity Distribution Board Kaushambi.. Submission Date for this Tender is 06-04-2024. Distribution Board Tenders in kaushambi Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43084031
The Work Of Increasing The Capacity Of 11/0.4 Kv Substations Currently Operating Under The Distribution Areas Of Kaushambi And Chail Andas Under The Area Of ​​Electricity Distribution Board Kaushambi.
Open Tender
Indian
Uttar Pradesh
kaushambi
06-04-2024

Tender Details

The Work Of Increasing The Capacity Of 11 / 0.4 Kv Substations Currently Operating Under The Distribution Areas Of Kaushambi And Chail Andas Under The Area Of ​​Electricity Distribution Board Kaushambi.

Key Value

Document Fees
INR 3540 /-
EMD
INR 28400.0 /-
Tender Value
INR 28.40 Lakhs /-

BOQ Items

dk;Z dk fooj.k% fo|qr forj.k e.My dkS"kkEch ds {ks=karxZr dkS"kkEch rFkk pk;y [k.Mksa ds forj.k {ks=ksa ds vUrZxr orZeku esa lapkfyr 11@0-4 ds0oh0 miLFkkuksa dh {kerko`f) dk dk;ZA
Sl. No. Item Description
1Loading, unloading and safe carriage of following materials from Store Centre, Manjhanpur to JE dump Store and JE dump Store to work site with proper stacking
2PCC Pole 8.5 Mtr
3Top Channel
4Dropper Channel
5Disc Insulator
6Pin Insulator
7T off Channel
8ACSR weasel Conductor
9S/s Base Angle
1025 KVA T/f
1163 KVA T/f
12100 KVA T/f
13250 KVA T/f
14Supply of following material/fitting complete in all respect :-
15Stone Pad
16LT PVC Cable
17Clamp for top and Dropper
18T off Channel Clamp
19Nut & Bolt
20Stay Complete with Concreating
21Concreating of Pole
22Earthing
23Lug
24Dangerd Board
25Birbed Wire
26Copper Lugs
27Construction of T/F plinth of size 2x2x1.2 mtr with the help of first class brick & 9" masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely and plastering outer surface as per RESPO norms. Top of the plinth covered with 4" RCC Slab of ratio 1:1.5-3 (Cement, sand & concrete) grouting with 2 Nos. ISMC size 125X65X6 MM (confirming to IS 808:1989) of 2000 mm long for resting. All required materials will be provided by the contractor.
28The excavation of 1 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of Double PCC/ST Pole with fixing of necessary clamps & accessories as per required (if required). All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor. Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor). Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that No rainwater gets accumulated on the top. All work will be done as per RESPO Norms & relevent IS Specification.
29Fabrication, erection, commissioning & Testing of 250 KVA T/F on Plinth with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, ALLugs (Confirming to IS 8309), Z Clamp, Nuts & Bolts will be supplied by the Contractor
30Fabrication, erection, commissioning & Testing of 100 KVA T/F on Double Pole/Plinth with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, ALLugs (Confirming to IS 8309), Z Clamp, Nuts & Bolts will be supplied by the Contractor
31Fabrication, erection, commissioning & Testing of 63 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, ALLugs (Confirming to IS 8309), Z Clamp, Nuts & Bolts will be supplied by the Contractor
32Fabrication, erection, commissioning & Testing of 25 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All necessary materials such as Holding clamp, ALLugs (Confirming to IS 8309), Z Clamp, Nuts & Bolts will be supplied by the Contractor
33Earthing of Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO Norms.
34Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work)
35Laying, stringing, sagging, binding and jumpering of ACSR Weasel conductor for LT/HT Line with fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required
36Laying, stringing, sagging, binding and jumpering of AB CABLE conductor for LT/HT Line with fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail