Tender For Ash Handling System Package For Lara Stpp Stage-Ii 2X800 Mw
Tender Overview
Project Description
Ash Handling System Package For Lara Stpp Stage-Ii 2X800 Mw Ash Handling System Package For Lara Stpp Stage-Ii 2X800 Mw Chhattisgarh , Design, Engineering ( Including 3D Modelling Of Complete Ahp ) , Selection Of Equipment, Manufacturing, Supply, Inspection & Testing, Shop Floor Testing, Shop Floor Painting, Packing & Forwarding, Touch Up Paints, Consumables Etc Of The Following Including Customs Clearance / Port Clearance. , Complete Ash Handling System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) As Per The Scope Of Specification ( Except Item Sl. No. 1.2 To 1.6 Below ) . , Complete Wet Bottom Ash Handling System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) From Boiler Seal Plate Assembly, Bottom Flange Of Eco, Eco Outlet, Aph And Duct Hoppers To The Bottom Ash Slurry Sumps For Unit #1 & 2 As Per The Scope Of Specification. , Complete Dewatering Bin System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) From Slurry Dury Knife Gate Valves At Dewatering Bin Top To The Discharge Of Ash To The Mixing Tanks For Unit 1&2 Along With All Associated Equipment At Dewatering Bins As Per The Scope Of Specification. , Fly Ash Classification System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) At Classifier Silo, Fine Ash & Coarse Ash Hoppers For Unit #1 & 2 As Per The Scope Of Specification. , Fly Ash Bagging System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) At Fine Fly Ash Silo To Storing At Bagging Shed, Retrieval And Truck Loading For Unit #1 & 2 As Per The Scope Of Specification. , Hcsd Pumps For Unit #1 & 2 As Per The Scope Of Specification. , Spares-Manufacturing, Supply, Inspection & Testing, Shop Floor Testing, Shop Floor Painting, Packing & Forwarding, Unloading, Receipt, Storage, Intra Site Handling And Handing Over To End Customer. , Commisssioning Spares For Complete Ahp As Per The Scope Of Specification , Mandatory Spares For Complete Ahp As Per As Per The Scope Of Specification. , Services-Erection & Commissioining, Unloading, Receipt, Storage Including Intra Site Handling, Painting At Site, Trial Run, Pg Test, Handing Over To End Customer , Erection And Commissioning For ( Sl. No. 1.1 Above ) Complete Ash Handling System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) As Per The Scope Of Specification ( Except Sl. No. 1.2 To 1.6 Above ) . , Erection And Commissioning For ( Sl. No. 1.2 Above ) Complete Wet Bottom Ash Handling System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) From Boiler Seal Plate Assembly, Bottom Flange Of Eco, Eco Outlet, Aph And Duct Hoppers To The Bottom Ash Slurry Sumps For Unit #1 & 2 As Per The Scope Of Specification. , Erection And Commissioning For ( Sl. No. 1.3 Above ) Complete Dewatering Bin System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) From Slurry Dury Knife Gate Valves At Dewatering Bin Top To The Discharge Of Ash To The Mixing Tanks For Unit 1&2 Along With All Asociated Equipments At Dewatering Bins As Per The Scope Of Specification. , Erection And Commissioning For ( Sl. No. 1.4 Above ) Fly Ash Classificatication System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) At Classifier Silo, Fine Ash & Coarse Ash Hoppers For Unit #1 & 2 As Per The Scope Of Specification. , Erection And Commissioning For ( Sl. No. 1.5 Above ) Fly Ash Bagging System ( Mechanical, Civil & Structural, Electrical And C&I Equipment / Items ) At Fine Fly Ash Silo To Storing At Bagging Shed, Retrieval And Truck Loading For Unit #1 & 2 As Per The Scope Of Specification. , Erection And Commissioning For ( Sl. No. 1.6 Above ) Hcsd Pumps For Unit #1 & 2 As Per The Scope Of Specification. , Erection, Commissioning & Operation Services For Ht Motors, Ht / Lt Swgr , Dcs Operations, As Per Scope Matrix And Detailed Technical Specification. , Erection And Commissioning Of Bhel Free Supplied Items For Unit #1 & 2 As Per The Scope Of Specification. , Operation & Maintenance , Operation And Maintenace Of Complete Ash Handling Plantas Per The Scope Of Specification. Each Shift Will Be Of Of 8 Hrs Duty. , Training , Training Of Employers Perssonel ( End User ) On Complete Ash Handling System As Defined In The Nit Specification , Freight / Transportation Charges , Total Freight / Transportation Charges For Supply Of All Plant & Equipment Including Spares
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 22-Apr-2024 | Corrigendum-1 Extension of bid submission end date | Date | 06-May-2024 |
| 2 | 04-May-2024 | Corrigendum-2 Extension of bid submission end date | Date | 16-May-2024 |
| 3 | 16-May-2024 | Corrigendum-3 Extension of bid submission end date | Date | 27-May-2024 |
| 4 | 27-May-2024 | Corrigendum-4 Extension of bid submission end date | Date | 06-Jun-2024 |
| 5 | 06-Jun-2024 | Corrigendum-5 Extension of bid submission end date | Date | 17-Jun-2024 |
BOQ
| Sl. No. | Item Description |
| 1 | Design, Engineering (including 3D modelling of complete AHP), Selection of Equipment, Manufacturing, Supply, Inspection & Testing, shop floor testing, shop floor painting, packing & forwarding, touch up paints, consumables etc of the following including customs clearance/ port clearance. |
| 2 | Complete Ash handling system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) as per the scope of specification (except item Sl. No. 1.2 to 1.6 below). |
| 3 | Complete Wet bottom Ash handling system (Mechanical, Civil & structural, Electrical and C&I Equipment / items) from Boiler seal plate assembly, bottom flange of Eco, Eco Outlet, APH and Duct hoppers to the Bottom ash slurry sumps for Unit #1 & 2 as per the scope of specification. |
| 4 | Complete Dewatering bin system (Mechanical, Civil & structural, Electrical and C&I Equipment / items) from slurry dury knife gate valves at dewatering bin top to the discharge of ash to the Mixing tanks for Unit 1&2 along with all associated equipment at dewatering bins as per the scope of specification. |
| 5 | Fly Ash Classification system (Mechanical, Civil & structural, Electrical and C&I Equipment / items) at Classifier silo, Fine ash & Coarse ash hoppers for Unit #1 & 2 as per the scope of specification. |
| 6 | Fly ash bagging system (Mechanical, Civil & structural, Electrical and C&I Equipment / items) at Fine fly ash silo to storing at Bagging shed, Retrieval and Truck loading for Unit #1 & 2 as per the scope of specification. |
| 7 | HCSD Pumps for Unit #1 & 2 as per the scope of specification. |
| 8 | Spares-Manufacturing, Supply, Inspection & Testing, shop floor testing, shop floor painting, packing & forwarding, Unloading, Receipt, storage, Intra site handling and Handing over to end customer. |
| 9 | Commisssioning spares for complete AHP as per the scope of specification |
| 10 | Mandatory Spares for complete AHP as per as per the scope of specification. |
| 11 | Services-Erection & Commissioining, Unloading, Receipt, Storage including intra site handling, painting at site,Trial run, PG test, Handing over to end customer |
| 12 | Erection and commissioning for (Sl. No. 1.1 above) Complete Ash handling system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) as per the scope of specification (except sl. No. 1.2 to 1.6 above). |
| 13 | Erection and commissioning for (Sl. No. 1.2 above) Complete Wet bottom Ash handling system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) from Boiler seal plate assembly, bottom flange of Eco, Eco Outlet, APH and Duct hoppers to the Bottom ash slurry sumps for Unit #1 & 2 as per the scope of specification. |
| 14 | Erection and commissioning for (Sl. No. 1.3 above) Complete Dewatering bin system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) from slurry dury knife gate valves at dewatering bin top to the discharge of ash to the Mixing tanks for Unit 1&2 along with all asociated equipments at dewatering bins as per the scope of specification. |
| 15 | Erection and commissioning for (Sl. No. 1.4 above) Fly Ash Classificatication system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) at Classifier silo,Fine ash & Coarse ash hoppers for Unit #1 & 2 as per the scope of specification. |
| 16 | Erection and commissioning for (Sl. No. 1.5 above) Fly ash bagging system (Mechanical, Civil & structural,Electrical and C&I Equipment / items) at Fine fly ash silo to storing at Bagging shed, Retrieval and Truck loading for Unit #1 & 2 as per the scope of specification. |
| 17 | Erection and commissioning for (Sl. No. 1.6 above) HCSD Pumps for Unit #1 & 2 as per the scope of specification. |
| 18 | Erection,commissioning & Operation services for HT Motors, HT / LT SWGR , DCS Operations, as per scope matrix and detailed technical specification. |
| 19 | Erection and commissioning of BHEL free supplied items for Unit #1 & 2 as per the scope of specification. |
| 20 | Operation & Maintenance |
| 21 | Operation and Maintenace of complete Ash handling plantas per the scope of specification. Each shift will be of of 8 hrs duty. |
| 22 | Training |
| 23 | Training of Employer\"s perssonel (End user) on Complete Ash handling system as defined in the NIT specification |
| 24 | Freight/ Transportation Charges |
| 25 | Total Freight/ Transportation charges for supply of all plant & equipment including spares |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender