}

Tender For Annual Rate Contract For Pe Png Operation And Maintenance Works At Various Ioagpl Ernakulam Ga, ernakulam-Uttar Pradesh

IndianOil Adani Gas Private Limited-IOAGPL has published Tender For Annual Rate Contract For Pe Png Operation And Maintenance Works At Various Ioagpl Ernakulam Ga. Submission Date for this Tender is 06-04-2024. Civil Work Tenders in ernakulam Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43077451
Tender For Annual Rate Contract For Pe Png Operation And Maintenance Works At Various Ioagpl Ernakulam Ga
Open Tender
Indian
Uttar Pradesh
ernakulam
06-04-2024

Tender Details

Annual Rate Contract For Pe Png Operation And Maintenance Works At Various Ioagpl Ernakulam Ga

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: ANNUAL RATE CONTRACT FOR PE-PNG OPERATION & MAINTENANCE (O&M) WORKS AT IOAGPL ERNAKULAM GA
Sl. No. Item Description
1Emergency Services
2Attending leakage complaint/maintenance from TF to Appliance (Gas Stove) of PNG connection (GI installation)
3Attending Gas Leakage complaint from TF to Appliance (Gas Stove) with all tools, tackles and consumbales. Scope includes checking of leakage at joints with Soap Solution/Gas Detector, attending leakage, painting touch up work, Prepration of report as per format provided by IOAGPL.Sufficient crew/Manpower shall be available at site and should attend the leakage within 30 minutes of complaint reporting time.Free issue materials shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of GI Pipe/fittings etc. from IOAGPL stores) and procument/ maintanenance of all tools, tackles and consumbales shall be bidder scope. Consumables shall include but not limited to GI powder coated clamps, Teflon Tape, "O" ring, etc.
4MDPE damage recification/repair & maintenance work (upto 63 mm Dia)
5Scope inculdes attending MDPE leakage complaint (Up to 63 mm dia) within 30 min of complaint reporting time with all tools, tackles and consumbales, closure of MDPE Valve/Sqeezing of Line, barricading of affected area,excavation of area near damage portion as per requirement, Rectification of damage line, opening of valve/Squeezer, testing of EF joint with soap solution, backifiling, prepration of report as per format provided by IOAGPL. Sufficient Crew/Manpower shall be available at site and should attend the leakage within 30 min of complaint reporting time. Free issue materials (i.e. MDPE pipe, Fittings, etc.) shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of MDPE Pipes & PE Fittings etc. from IOAGPL stores). Procument/maintanenance of all tools, tackles and consumbales (i.e. Sqeezer, Valve key, Fusion Machine, Generator, Isopropyl Alcohol, etc) shall be arranged by Contractor. Works shall be executed as per instruction and satisfaction of EIC/SIC. Any pipeline relaying required, etc. shall also be in the scope of Contractor
6MDPE damage recification/repair & maintenance work (above 63 mm Dia)
7Scope inculdes attending MDPE leakage complaint (above to 63 mm dia) within 30 min of complaint reporting time with all tools, tackles and consumbales, closure of MDPE Valve/Sqeezing of Line, barricading of affected area,excavation of area near damage portion as per requirement, Rectification of damage line, opening of valve/Squeezer, testing of EF joint with soap solution, backifiling, prepration of report as per format provided by IOAGPL. Sufficient Crew/Manpower shall be available at site and should attend the leakage within 30 min of complaint reporting time. Free issue materials (i.e. MDPE pipe, Fittings, etc.) shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of MDPE Pipes & PE Fittings etc. from IOAGPL stores). Procument/maintanenance of all tools, tackles and consumbales (i.e. Sqeezer, Valve key, Fusion Machine, Generator, Isopropyl Alcohol, etc) shall be arranged by Contractor. Works shall be executed as per instruction and satisfaction of EIC/SIC. Any pipeline relaying required, etc. shall also be in the scope of Contractor
8MDPE Valve Chamber Cleaning, Maintenance, etc.
9Scope include deployment of manpower with all Tools, Tackles, Machinery, etc. (i.e. Mud Motor, Generator, etc) for cleaning of MDPE Valve Chambers, prepration of report as per format provided by IOAGPL. Works shall be executed as per instruction and satisfaction of EIC/SIC.
10Steel Valve Chamber Cleaning, Greasing, Painting, etc.
11Scope include deployment of manpower with all Tools, Tackles, Machinery, Applying Grease, R95 Painting as per requirement, etc. (i.e. Mud Motor, Generator, etc) for cleaning of Steel Valve Chambers, prepration of report as per format provided by IOAGPL. Works shall be executed as per instruction and satisfaction of EIC/SIC.
12Attending Service Regulator leakage complaint, Repair, Maintenance, etc.
13Scope Include attending SR box leakage complaint, Reapair, Replacement, etc. within 30 min of complaint report time with all the tools, tackles and consumables, rectification of leakage, prepration of reprot as per format provided by IOAGPL. Free issue materials shall be supplied by IOAGPL (Contractor shall arrange for receiving, handling, loading, transportation and unloading of GI Pipe, Fittings, Regulator, etc. from IOAGPL stores) and procument/ maintanenance of all tools, tackles and consumbales shall be contractor scope.Works shall be executed as per instruction and satisfaction of EIC/SIC.
14Patrolling of Steel & MDPE Network
15Scope Include: • To carry out emergency patrol, for the section / network vulnerable to damage due to sudden development of activities by other utilities. • To wear PPEs like safety shoes, cotton dress and reflective jacket • To carry out patrolling by driving the vehicle along the pipeline route, as per, as-built drawing, markers and valve chamber position, observing activities on pipeline as per check list, like excavation, construction, encroachment, • To coordinate and monitor with external agencies working on charged network of IOAGPL as per permissions issued on pipeline route. • To understand their work, extent of excavation and its potential hazard to underground gas pipeline • To explain them, about the gas pipeline network / route and precautions to be taken to prevent damage to gas pipelines. • To provide / update them with contact number and other details of IOAGPL authorised EIC for assistance. • To collect details of their supervisor like contact number, address etc for further coordination • To prepare report in standard format • Report immediately any unusual developments or occurrences along a pipeline route which may have some effect on the normal operation or maintenance of the pipeline
16LPT of Network
17LPT of Steel/MDPE Network (per KM) - Upstream of Service Regulator
18LPT of LP Network (per SR/section) - Downstream of Service Regulator
19LDT of Network
20LDT of Steel/MDPE Network (per KM) - Upstream of Service Regulator
21LDT of LP Network (per SR/section) - Downstream of Service Regulator
22Monitoring of Pressure / Flow of CGS
23Monitoring of Odorant system parameters
24Monitoring readings at TRU
25Earting Reading of DRS/MRS
26Third Party works Monitoring On IOAGPL pipe line
27Post Commissioning Services
28Annual Maintenance Service
29Annual Maintenance of PNG
30AMC of PNG Domestic Connection including sand filling and cementing of RCC guard if required. (LPT, Anomalies identification, Leakage identification & rectification, Checking of service line,Painting touch up of GI pipe, RCC Guard, GI Clamp,Repalcement of Surakaha hose in case of damaged, expired for all Points etc.
31AMC of PNG commercial/Non Commercial Connection. (Anomalies identification, Leakage identification & rectification, checking of service line. Painting touch up of GI pipe as per IOAGPL EIC instruction, RCC Guard, GI Clamp replacement / installation as per EIC instruction, Repalcement of Surakaha hose if required IOAGPL EIC instruction if any in case of damaged, expired for all Points etc.
32Repainting of GI pipe, RCC Guard and GI Clamp of entire connection including supply of paint,
33Annual maintenance of vertical riser
34AMC of Vertical Riser including horizontal approach upto G+3 floors -including sand filling and cementing of RCC guard if required.Painting touch up of GI pipe, RCC Guard, GI Clamp
35Re-painting of complete GI pipe Riser including lateral Upto G+3 floors,
36AMC of Vertical.Riser including horizontal approach each floor above 3rd Floor -.Painting touch up of GI pipe, RCC Guard, GI Clamp
37Re-painting of entire GI pipe on V.Riser "each floor" above 3rd Floor
38Annual maintenance of Common Horizontal
39AMC of Horizontal header Upto 3 houses -including sand filling and cementing of RCC guard if required.Painting touch up of GI pipe, RCC Guard, GI Clamp
40Re-painting of complete GI pipe on Horizontal header Upto 3 houses
41AMC of Horizontal header for each house beyond 3 houses -
42Painting of GI pipe on Horizontal header for "each house" beyond 3 houses.Painting touch up of GI pipe, RCC Guard, GI Clamp including paint and other materials needed
43O&M services
44Replacement of equipment/fittings.
45Replacement of Dom., Com., Ind. Regulator/Diaphragm meter, Brass ball valve/Gas tap,
46Replacement transition fittings or RCC guard or both (Rates are excluding material charges)
47Replacement of Industrial / Commercial Meter- RPD
48IOAGPL supplied Suraksha Hose replacement including supply and installation of rubber hose clamp-Domestic PNG connection- Other than identifed during domestic AMC
49Replacement of Domestic/Commercial Meter or Regulator "O" ring or Adaptor
50Installation of new GI for alteration/additional point (excluding contractor supplied materials rates )/ Re-fitting of GI
51Installation of new 1/2" GI Pipe, SOR rate to be paid for either actual or minimum 3 m length for services and materials whichever is higher..
52Installation of 1" new GI Pipe, SOR rate to be paid for either actual or minimum 3 m length for services and materials whichever is higher.
53Supply & Installation of PVC Sleeve on GI Pipe with Insulation
54Installation of GI Pipeline Protection Clamp from door or window.
55Installation of only Rubber Tube Clamp
56Installtion of 1/2"new GI Powder Coated Clamp
57Installtion of 1"new GI Powder Coated Clamp
58Installation of Burner Jet
59Dismantling
60Dismantling of1/2"/ 1" GIPipe - SOR rate to be paid for either actual or minimum 3 m length whichever is higher.
61Dismantling of Powder coated 1/2" / 1" GI Riser - SOR rate to be paid for either actual or minimum 3 m length whichever is higher.
62Drilling of through Hole with Drilling Machine,
63Drilling of Hole in Brick / plastering
64Drilling of Hole in RCC
65Drilling of Hole in Others (Marble ,Granite etc.)
66Modification of RCC Guard
67Modification of RCC Guard with PE Squeezing
68Modification of RCC Guard without PE Squeezing
69Conversion of Burner
70NG Conversion charges for 2 burner
71NG Conversion charges for beyond 2 burner
72Installation of Marker
73Installation of RCC Route Marker incl PCC Foundation on PE Network
74Stenciling/repainting of existing marker
75Meter Reading
76Meter Reading - Comm / Non Commercial or Industrial customer for varification as and when required
77Meter Reading - Domestic customer for varification as and when required
78Civil work (including hard barricading)
79Supply & Lay PCC 1:2:4 for PNG O&M
80Supply & Lay PCC 1:4:8 for PNG O&M
81Supply & Lay RCC 1:1.5:3 Including Reinforcement for PNG O&M
82Sand Filling activity for Service Regualtor Module or PE Valve Chamber
83supply & Const. Brick work
84Supply & Const.Plastering
85Supply & Installation of structuralsteel Including fabrication
86Demolishing of existing Valve Chamber
87Dismantling of existing Transition Box/Service regulator of any size including PE connectivity. Services includes supply of labour,Excavation,isolation of valves and pipe lines,Demolition of foundation and transportation of removed Service regulator module to IOAGPL store/Place instructed by IOAGPL EIC
88Supply & Laying of Half Round 6" RCC Hume Pipe
89Supply & Laying of RCC Hume pipes 6" for cross including collar
90Installation ofIOAGPL Supplied Canopy of ServiceRegualtor Moduleof any size Including Transportation, Civil Foundation& painting,shifting of removed canopy to IOAGPL store/Place instructed by IOAGPL EIC
91Supply and Installation of Valve chamber sleeper - all sizes
92Installation of SR module
93Installation of SR Module B-10/25/50 Including Excavation,Required PE Material,Sand fillingand Civil work with Painting on Foundation.
94Regualtor Replacement in SR Module
951"" Ball Valve replacement in SR Module
96Boundary Fencing (WIRE MESH) installation for DRS/CPRS/MRS/IMS/CGSincluding supply of material
97Miscellaneous Jobs
98Installation IOAGPL supplied Gas tap and rubber tube installation
99Temporary Disconnection/Force disconnection for each house only Meter
100Permanent/Temporary/Force Disconnection for each house from PE or TF
101Reconnection for each house only meter
102Reconnection for each house from PE or TF without refitting in GI pipe
103Reconnection /Force Disconnectionusing Petzl for each house
104Installation of hollow hex plug
105Painting of Valve chamber & Valve including Inside White washing and strencilling on top cover at three Locations- Top cover,Inside, Outside including paint and other materials needed
106Painting - including scraping /cleaning,one coat of epoxy zinc rich primer,Two coat of polyamide epoxy and two coat of acrylic polyurethene(PU Paint) including paint and other materials needed
107Stencilling ---Letter writing including supply of Paint
108Lifting of RCC guard including Excavation, modification in PE line using 2 EF joints (1 for PE and another for TF), refittings of existing RCC guard
109MRS/IMS maintenance
110MRS/IMS maintenance including filtercleaning, Stainer cleaning,Valve replacement other than 110 mbar skid
111Replacement at IMS of below Items as & when required. 1)Meter 2)EVC 3)Battery 4)Modem & power supply.
112Dismantling of MRS/IMS (including transportation)
113Hiring of equipment
114Hiring of JCB for excavation
115Hiring of Hydra
116Hiring of Compressor for Flushing & testing
117Hiring of Tractor for shifting of excavated material
118PE pipeline shifting and lowering including Installation of Electrofusion fitting if any
119Installation of PE pipeline Receiving, handling, loading, transportation and unloading including owner supplied PE pipes and Electro fusion Fittings from owner"s designated stock yards. Proper storing, stacking, identification, providing security, and insurancecoverforthematerials. LiasoningwithLandowningagencies/statutory authorities, , temporary restoration of the abandoned trial pitsas required (excavation to depth as per specification ) to original condition. barricading the work area as per the procedures&drawingsprovidedinthetenderandasperthedirectionsofEIC/site- incharge.Trenching to the required depth in all types of terrain, uncoiling / stringing of pipes, damping, jointing of the pipe ends/ fittings/ valves by qualified personnel, using bar coded electro fusion techniques as per specification. Rates includes excavation as per tender specification and all contractor supplied materialotherthanIOAGPLfreeissuematerialasmentionedin tender document in all types of terrain excuding rocky terrain.
120Inst, Test, Com of 90 mm, 110mm & 125mm ODXSDR 17.6
121Inst, Test, Com of 32 mm & 63mm OD, SDR 11 & 17.6
122Inst, Test, Com of 20 mm ODXSDR 9
123Hook up of PE with DRS/CPRS/DPRC/IMS feeder
124Hook up of PE with DRS/CPRS/DPRC/IMS feeder
125Reinstatement of PE pipeline to its original condition & Supply & filling of fine sand for bedding & covering, supply & Installation of warning tape with complete restoration and water compaction
126PE pipe per meter
127PE Pipe Line Testing & Flushing including supply of N2 (Applicable if water enters into PE Pipe Line Section due to Third Party Damage), Rock & RCC Breaking, Boring - Manually & HDD, Ins. Of EF Fittings
128Flushing & Testing of PE Pipe Line - 32 MM to 63 MM
129Flushing & Testing of PE Pipe Line - 90 MM to 160 MM
130Excavation, Removal out of PE Pipeline
131Trenchless crossing for any pipe dia.-Manual Boring normal soil
132Trenchless crossing for any pipe dia. - HDD normal soil
133Trenchles crossing for any pipe dia. - HDD Rocky strata
134Rock Breaking
135Breaking of PCC
136Breaking of RCC
137Construction of Valve Chamber all Sizes (MDPE)
138Earting chamber repairing of DRS/MRS
139Anaconda Replacement with Bush-Adaptor Fittings
140Removal of anaconda and installation of Bush-adaptor fittings
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail