Delhi Development Authority-DDA has published Tender For Maintenance Of Park Plantation Trucks And Other Equipments In Horticulture Wing Na Ii Mo Green Belt At Sector A 1 To A 4 Between 20 Mtr Road To 40 Mtr Road At Narela. Submission Date for this Tender is 05-04-2024. Gardening Tenders in Delhi Delhi. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supplying and stacking of good earth at site including royalty and carriage with all lead and lift. (Good earth measured in stacks will be reduced by 20 % for payment) |
2 | Supplying and Stackingof Red Bajri at site by mechanical transport i/c royalty and carriage loading unloading with all lead and lifts. |
3 | Supplying and stacking of jamuna sand at site I/C royalty, carriage andloading / un loading for all leads and lifts. |
4 | Diggingholes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2: 1 by volume (2 part of stacked volume of earth after reduction by 20 %: 1 part of stacked volume of manure after reduction by 8%) flooding with water dressing including removal of rubbish and surplus earth .if any with all leads and lift (cost of manure. sludge or extra good earth if needed to paid for separately).i) SIZE 0.90m. dia and 0.90m. deep |
5 | ii) SIZE 0.45m. dia and 0.45m. deep |
6 | Supply of Neem oil Cake at site in gunny bags/ plastic bags (in 40 kg packing) |
7 | Supply of Chlorpyriphos 20% E.C/ Lindane 20% E.C as per specification at site (Packing in one Ltr./ 5 Ltr. |
8 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, as per directions of Engineer-in-charge. All kinds of soil |
9 | Preparation of beds for hedging and shrubbery by excavating 60 cm. deep and trenching the excavated base to a further depth of 30cm. refilling the excavated earth after breaking clods and mixing with sludge or manure in the ratio of 8:1 (8 Part of stacked volume of earth after reduction by 20 %: one part of stacked volume of sludge or manure after reduction by 8%). Flooding with water filling with earth if necessary. Watering and finally fine dressing, levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed within a lead of 50 m lift upto1.5 m. complete (cost of sludge. Manure or extra earth to be paid for seprately). |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail