Tender For Upkeep Of Utility And Pulp Mill Area, Kottayam-Kerala

Kerala Paper Products Limited has published Tender For Upkeep Of Utility And Pulp Mill Area. Submission Date for this Tender is 08-04-2024. Civil Work Tenders in Kottayam Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

43074818
Corrigendum : Tender For Upkeep Of Utility And Pulp Mill Area
Open Tender
Indian
Kerala
Kottayam
08-04-2024

Tender Details

Upkeep Of Utility And Pulp Mill Area Kppl / Cc / 654 / 2024 Dtd 28.03.2024

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 05-Apr-2024 CORRIGENDUM I Date 08-04-2024

Key Value

Document Fees
INR 265 /-
EMD
INR 20000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:UPKEEP OF UTILITY AND PULP MILL AREA
Sl. No. Item Description
1Maintaining all floors, stairways and landing in 15 & 7 MW TG building free from dust and dirt.Thisincludes operatingfloor, mezzanine floor, ground floor including drainsinsidethebuilding&TG controlroom.(TG controlroomand TG operating floor to be mopped with softwetcloth).
2Cleaning operating/ground floors of boiler house, local control room and surrounding area including pressure filter and feed pump area and centrifugal compressor room, utility store and adjacent rest rooms. The area should be free from dust and dirt.
3Cleaning steam distribution header area, engineers/ officers room, coal handling officers, coal/ash handling control rooms, ash compressor room and ESP control room -free dust & dirt.
4Cleaning DCS control room, bottom MaintenanceOffice rooms, ground floor office room, Engineers office room free from dust and dirt.
5Cleaning stairways & landing from boiler house, ground floor to steam drum area.
6Maintaining the main structure of power boilers, air ducts and buckstays, boiler burner area, coal scale and deaerator floor area. Ash/dust to be manually collected in bags and dumped in the area earmarked for the purpose.
7Cleaning of both cooling towers pump area, ash water pumps floor area and. Removal of algae/debris /mud/dust etc from cooling tower top platform of both cooling towers and its surroundings.
8Keeping the ESP floors of boiler no. 1, 2 & 3 free from dust and ash.
9Maintainingtheconveyor areas in coal handling plant free from dirtanddust:conveyornos.C1,C2,C3,C4,05,40,18,12, 13, 14.Workincludesmaintainingthe conveyorfloors,includingdeckplates,floorsand platforms,gratings,gravity take up areas, pump sump etc free from dirt, dust & spilled coal. The stones and debris to be shifted to specified area earmarked for the purpose. During cleaning the roof and sides of all conveyor galleries shall also be cleaned. It should be free from dust, dirt and cob webs.40 or specified conveyors as directedly EIC shall be cleaned daily.The quantity of removal of spilled coal upto 2m3 is part of this item.
10Maintaining the conveyor area in coal unloading plant free from dirt, dust and spilled coal from the conveyor area, 04, 36, 37 and feeder area, bottom floor of wagon tippler including structural.Work includes cleaning the conveyor floors, deck plates, floors & platforms gratings, gravity take up areas pump sump etc. The stones and debris to be shifted to specified area earmarked for the purpose.The quantity of removal of spilled coal upto 2 m3 is part of this item.
11Cleaningandcollectionofspilledovercoal from crusherhouse&impactor house and transporting it to coalyard, as directed by shift engineer. Work includes maintaining the floors and access stairs free from dust and dirt. The quantity of removal of spilled coal upto 2 m3 ispart of this item.
12Clean spillage above 2m3 in coal handling units/wagon tippler . collectionandremoval of accumulated coal may due to jammingofchutesoverflowing of conveyors/spilled overcoalordue to tripping of conveyors at various locations in coal handling plantandspilled/ overflowedcoalbelowwagontippler. If the spilled over coal ispossibletofeeddirectlytothe conveyors, it can be done after taking measurements and asperdirectionofengineerinchargeonly.
13Maintaining the conveyor area in Chipper house, free from dirt , dust and spilled wood chips inconveyor area from Silo to CP plant - 411.05.Workincludesmaintainingthe conveyorfloors,includingdeckplates,floorsand platforms,gratings,gravity take up areas etc free from dirt, dust & wood chips.During cleaning the roof and sides of all conveyor galleries shall also be cleaned. It should be free from dust, dirt and cob webs. The work is to be executed twice in a week or as instructed by EIC. The debris to be shifted to specified area ear marked for the purpose.
14Maintaining the conveyor area in Chipper house, free from dirt, dust and spilledwood chips inconveyor area ofChipper house silo to CMP: 511.31 and 511.33, Workincludesmaintainingthe conveyorfloors,includingdeckplates,floorsand platforms,gratings,gravity take up areas etc free from dirt, dust & wood chips.During cleaning the roof and sides of all conveyor galleries shall also be cleaned. It should be free from dust, dirt and cob webs. The work is to be executed twice in a week or as instructed by EIC. The debris to be shifted to specified area ear marked for the purpose.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail