Supply & Installation Of Continuous Ambient Air Quality Monitoring System ( Caaqms ) , Continuous Marine Water Quality Monitoring Stations ( Cmwqms ) , Online Continuous Effluent Monitoring System ( Ocems ) At Stp Inlet & Outlet, Online Sound Level Meter With Dg Set Noise Level And Providing Led Display Board And Central Server Along With 10 Years Camc ( Comprehensive Annual Maintenance Contract ) After 1 Year Initial Operation And Maintenance In Port Area- 1 Continuous Ambient Air Quality Monitoring Stations At 3 ( Three ) Locations ( Caaqms ) 2 Supply Of Caaqm Stations For Monitoring Of Parameters Pm10, Pm2.5, So2, No2, O3, Nh3, Co & Btx On Samplers And Approved By Usepa, Tuv & Mcerts Etc., With Real Time Data Connectivity To Vpa, Appcb, Cpcb, Mopsw, Teflon Filter Paper Use In Pm10, Pm 2.5 Analyser For One Year Initial Operation And Maintenance. Ups, Portacabin: 10Ft X 10 Ft X 8.5 Ft With 1 Ton Ac – 2 Nos., Ups, Lab Testing For As, Pb, Benzopyrine & Nickel On Quarterly Basis And 10 Years Camc Charges Etc., As Directed By The Engineer-In-Charge Complete. All Labour And Materials. 3 Installation Charges With Spares &Consumable Items Along With Data Connectivity To Vpa / Appcb / Cpcb / Mopsw 4 Camc Charges With Spares &Consumable Items Along With Data Connectivity To Vpa / Appcb / Cpcb / Mopsw ( For 10 Years After Initial O&M ) 5 Continuousmarine Water Quality Monitoring Stations ( Cmwqms ) 6 Supply Of Online Marine Water Quality Monitoring System Including Real Time Data Transmission To Vpa / Appcb / Cpcb / Mopsw For The Measurement Of Ph, Biological Oxygen Demand ( Bod ) , Chemical Oxygen Demand ( Cod ) , Total Suspended Solids ( Tss ) , Dissolved Oxygen ( Do ) , Oil In Water, Turbidity ( Ntu ) , Salinity, Temperature, Total Dissolved Solids ( Tds ) , Conductivity ( Ec ) , Fecal Coliform & Nitrate. Lab Testing Of Pb And Hg On Quarterly Basis Etc., As Directed By The Engineer-In-Charge Complete. All Labour And Materials. 7 Installation Charges Including All Spares And Consumables. 8 Camc Charges With Spare &Consumable Items Along With Data Connectivity To Appcb / Cpcb / Mopsw 9 Online Continuous Effluent Monitoring System ( Ocems ) 10 Supply Of Online Effluent Water Quality Monitoring System ( Stp Inlet & Outlet ) For The Measurement Of Ph, Biological Oxygen Demand ( Bod ) , Chemical Oxygen Demand ( Cod ) , Total Suspended Solids ( Tss ) , Ammonium, Nitrate, Oil In Water & Fecal Coliform Etc., Data Connectivity To Vpa / Appcb / Cpcb / Mopsw And Vpa Portals, As Directed By The Engineer-In-Charge Complete. All Labour And Materials. 11 Installation Charges Including All Spares And Consumables. 12 Comprehensive Annual Maintenance Contrac ( Camc ) Charges For 10 Years With Spares & Consumable Items Along With Data Connectivity To Appcb / Cpcb / Mopsw 13 Online Sound Level Monitoring Providing Online Noise Levelmonitoring Including Dg Set Noise Levelwith Laeqcontinuous Noise Level For A Particular Period Lamax Maxium Noise Level Including Noise Level Of Dg Set Etc., In Visakhapatnam Port Area, As Directed By The Engineer-In-Charge Complete. All Labour And Materials. 14 Online Sound Level Meter Class-I With Laeq Max, Min 15 Installation Charges Including All Spares And Consumables. 16 Comprehensive Annual Maintenance Contract ( Camc ) Charges With Spares & Consumable Items Along With Data Connectivity To Appcb / Cpcb / Mopsw And Vpa Portals. 17 Led Display Board Supply & Fixingof Display Board For Display Of P10 Redwith Mechanical Structure In Visakhapatnam Port Area, As Directed By The Engineer-In-Charge Complete. All Labour And Materials. 18 6X4 Feet Led Display Board, P10 Red, With Mechanical Structure At 3 Locations In Vpa. 19 Installation Charges For 3 Display BoardS Including All Spares And Consumables. 20 Comprehensive Annual Maintenance Contract ( Camc ) Charges For 10 Years For Display Boards In Port Areaincluding Spares & Consumable Items Along With Data Connectivity To Appcb / Cpcb / Mopsw And Vpa Portals. 21 Central Server 22 Supply & Installlation Of Industrial Grade Pc ( Central Server ) In Administrative Office Building Port Area, As Directed By The Engineer-In-Charge Complete. All Labour And Materials. 23 Installation Charges Including All Spares And Consumables. 24 Camc Charges