}

Work For Increasing Capacity Of 33/11 Kv Substation 33/11Kv Substation Adampur (2X5 To 10+5),33/11Kv Substation Ishapur Bhatola Sharki (2X5 To 10+5),33/11Kv Substation Hasanpur Tehsil(10+5 To 2X10), District-Amroha, moradabad-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Work For Increasing Capacity Of 33/11 Kv Substation 33/11Kv Substation Adampur (2X5 To 10+5),33/11Kv Substation Ishapur Bhatola Sharki (2X5 To 10+5),33/11Kv Substation Hasanpur Tehsil(10+5 To 2X10), District-Amroha. Submission Date for this Tender is 30-04-2024. Civil Work Tenders in moradabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

43062010
Corrigendum : Work For Increasing Capacity Of 33/11 Kv Substation 33/11Kv Substation Adampur (2X5 To 10+5),33/11Kv Substation Ishapur Bhatola Sharki (2X5 To 10+5),33/11Kv Substation Hasanpur Tehsil(10+5 To 2X10), District-Amroha
Open Tender
Indian
Uttar Pradesh
moradabad
30-04-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Work For Increasing Capacity Of 33 / 11 Kv Substation 33 / 11Kv Substation Adampur ( 2X5 To 10+5 ) , 33 / 11Kv Substation Ishapur Bhatola Sharki ( 2X5 To 10+5 ) , 33 / 11Kv Substation Hasanpur Tehsil ( 10+5 To 2X10 ) , District-Amroha- 1 Supply Of Following Items :- ( By Contractor ) For Item No. 1.01 To 1.051.01 Ms Nut & Bolts 2 33Kv Ct Junction Box 3 Holding Clamp For Gi Pipe 4 M.S U-Type Holding Clamp For Earthing Of Neutral ( Delta ) 5 C.T Connector For Providing Input & Output Coneection 6 Safe Carriage Of Following With Loading & Unloading At Both Ends Respectively. ( Under Jurisdiction Of Pvvnl ) Or Item No. 2.01 To 2.142.01 33 Kv Bus Isolator 800 Amp / Line Isolator 7 33 Kv Fuse Set 8 33 Kv Lightening Arrestor 9 33 Kv Post Insulator 10 24 Volt Battery & Battery Charger Set 11 2X2.5 Mm2 Control Cable 12 4X2.5 Mm2 Control Cable 13 11 Kv 3×300Mm2 Xlpe Cable Jointing Kit ( Outdoor ) 14 11 Kv 3×300Mm2 Xlpe Cable Jointing Kit ( Indoor ) 15 33Kv Mocb / Vcb 800A750mva 16 33Kv Ct 200 / 100 / 1-1A 17 11Kv 3X300 Mm2xlpe Cable / 11Kv 3X185mm2 Xlpe Cable / 11Kv 3X50mm2 Xlpe Cable 18 M.S Channel 100X50x6mm 19 M.S Round 32Mm Dia 20 Disconnecting Ht Cable Connection From 33Kv Side &11Kv Side Of 05Mva / 8Mva Power Transformer For Removing Power Transformer From Plinth After Proper Shutdown. Dismantling Of 11Kv Cable Support Structure, Copper Bus Bar Structure, M.S.Frame Etc. 21 Disconnecting Copper Flexible / Earthing Strip From Power Transformer Neutral & Dismentling Neutral Earthing Systemto Facilitate Removal Of Power Transformer From Plinth. 22 Disconnecting Earthing Strip From Body Of 05Mva / 8Mva Power Transformer. 23 Draining Of Transformer Oil From Conservator, Radiators Of Existing 05 Mva / 08Mva T / F, At Respective 33 / 11 Kv S / S Into The Dry & Clean Drums And Stacking At The Safe Place In Substation Outside Of Switchyard. Empty Drums Shall Be Provided & Arranged By Contractor. 24 Removal Of Conservator, Radiators And Other Accessories From Existing 05 Mva / 08Mva Power Transformer. 25 Safe Shifting Of 05 Mva / 08Mva Power Transformer Main Body And Fixing All Accessories ( Radiator, Conservator Tank Other Accessories ) With Power Transformer Main Body From The Substation Switchyard To Outside The Switchyard At Suitable Place Assigned By Concern J.E / S.D.O 26 Safe Shifting Of 10Mva ( If Allowed In Writing By E.E, Construction, Mbd ) / 05Mva, 33 / 11 Kv, Power Transformer From Out Side Of Switchyard To Near Power Transformer Plinth In Switchyard. 27 Erection & Installation Of 10Mva ( If Allowedin Writing By E.E, Construction, Mbd ) / 05Mva Power Transformer On Power Transformer Plinth By Fixing All Accessories Like Radiators, Conservator Tank, Filling The Transformer Oil To Desired Level And Ensuring That There Is No Leakage After Providing New Radiator Seals Etc By The Contractor In Case Of 5Mva T / F Complete Job In All Respect. Reconnecting 2 Nos. Earthing Strip To Transformer Body. 28 Earthing Of Outdoor Equipments In Switchyard, As Per Site Requirement / As Per Pvvnl Guideline Details As Given Below:- For Item No. 6.01 To 6.036.01 Providing &Laying Of G.I.Strip Of Size 50X6mm For Connecting The Earthmat With Each Equipment ( Bus Isolators, 33Kv C.T., 33Kv V.C.B., L.As., Fuse Set, Post Insulators, T / F Body & Its Neutral And M.S.Frame Of Cabe Supporting Structure ) , Various Steel Structures. The Work Also Includes Cutting, Bending, Straightening, Over Laping And Welding The Earth Strip With Earth Mat And By Using High Quality Arc Welding In Already Digged Trenches, As Per Pvvnl Guidline And As Per Site Requirement. 29 Fixing M.S Round 32Mm Dia And Making Delta Earthing For Power T / F Neutral / L.A As Per Respo Norms. 30 Making Earthing Of All 11Kv Switchgears, P.T. And Other Outdoor Equipments On Both Earth Terminal Inside The Control Room By G.I.Strip In Size 50X6mm. With 32Mm. Dia M.S.Round Laid In Trench With Proper Electric Welding, As Per Pvvnl Guidline. 31 Supply & Erection Of Water Level Earthing By Boring And Lowering By Providing Of G.I.Pipe Size 40Mm Dia, Into The Ground Upto Water Level Or Minimum 20Mtr, Which Ever Is More, With The Lower End Of Solid Copper Cone Approx 224Mm Long And 750Gm In Weight Shall Be Provided And Screwed In Pipe As Well As Bringing Out A Continuous Copper Wire 6 Swg, From The Cone Upto The Ground Surface Where It Will Be Bolted To The G.I. Strip For Transformer Neutral Connection, The G.I.Strip Will Be Connected To Star Point Through Providing Copper Bond Strip Of Size-35X6mm, As Per Pvvnl Guidline. 32 Installation Of 33Kv Bus Isolator / Line Isolator With Structure, Fabrication, Excavation, Erection, Grouting ( With Cement, Coarse Sand And Stone Shingle ) And Making Of Plinth Of Bus Isolator Structure As Per Respo Drawing, As Per Pvvnl Guidline And Site Requirements :For Item No. 9.01 To 9.029.01Fabrication Of Structure, Including Cutting, Straightening & Drilling Of Holes In Channel / Angle Including Supply Of Materials. 33 Excavation Of Earth, Grouting Of Structure In C.C. Ratio 1:4:8, Erection Of Line / Bus Isolator Structure In Proper Alighment., Making Plinth By C.C. Ratio 1:3:6 And 12Mm Thick Plastering On Plinth In Ratio 1:4 34 Installation & Mounting Of Materials On Erected Structure ( The Work Also Includes Safe Removal Of Old Items & Height Incrasing Of Existing Structures By Providing M.S Channel / Angle As Per Site Requirement If Applicable ) : For Item No. 10.01 To 10.0510.01 Mounting Of 33Kv Post Insulator 35 33Kv C.T ( 200 / 100 / 1A, 400 / 100 / 1A ) 36 Mounting Of 33Kv Fuse Set 37 Mounting Of 33Kv L.A 38 33Kv Bus Isolator / Line Isolator 39 Hight Increasing Of L.A 40 Construction Of Plinth For The Structure Of 33 Kv Vcb As Per Details : For Item No. 12.01 To 12.05.12.01 A ) Excavation Of Earth Of Size ( 2.4×1.5×1.0 ) M Pits For Construction Of Plinth. ( 3.6 Cum ) 41 B ) Brick Ballast Ratio ( 1:4:8 ) ( Cement, Sand & Brick Ballast ) For Foundation Work ( 2.4×1.5×0.15 ) M Plinth. ( 0.54 Cum ) 42 C ) C.C. Work In Ratio 1:2:4 ( Cement, Coarse Sand &Stone Grit ) Of 20Mm Size For Making Plinth Of Size ( 2.4×1.5×1.00 ) M And Grouting Of Foundation Bolts 04 Nos. For 33 Kv Vcb. ( 3.6 Cum ) 43 D ) 12 Mm Thick Plaster With Cement Mortar In Ratio 1:4 ( Cement & Fine Sand ) Of Plinth Of 0.15 M Above Ground Level Size ( 2.4×1.5 ) M. ( 4.77 Cum ) 44 E ) Assembling And Installation Of 33 Kv Vcb On The Vcb Out Door Structure On The Plinth.Adjustment Of Operating Mechanism In Proper Alignment For Smooth Operation Of The Same. The Work Also Includes Fabrication Of Addition Arrangement For Proper Fixing, If Required And Also Safe Removal Of Old 33Kv Vcb If Applicable. 45 Laying, Stringing & Sagging Of Acsr Dog Conductor From Main Bus Bar To Power T / F, Through Post Insulator, Bus Isolator, C.Ts, Vcb And L.As., Byproviding & Fixing P.G.Clamp / Connectors, Suitable For Dog / Panther. 46 Preparation Of 11 Kv Power Cable Ends: As Per Respo Specification Of The Following : For Item No.14.01 To 14.02 14.01 Making Ofcable End Termination By Heat Shrinkable Out Door Jointing Kits Suitable For 11Kv, 3X300q.Mm Xlpe Cable. Providing, Fixing And Crimping Of Proper Size Good Quality Lugs Complete In All Respect. 47 Making Ofcable End Termination By Heat Shrinkable Indoor Jointing Kits Suitable For 11Kv, 3X300sq.Mm Xlpe Cable.Providing, Fixing And Crimping Of Proper Size Good Quality Lugs Complete In All Respect. 48 Making, Fabrication And Erection Of Neutral Earthing L Type Support Made Of M.S. Channel Size 100×50Mm. Structure Shall Be 4 Mtr. Long With 1 Mtr. Arms. Structure Shall Be Grouted In Ratio 1:3:6 In Block Size 300×300×700Mm And Painted With One Coat Of Ready Mixed Primer And Two Coat Of Enamel Aluminium Paint Work Includes Connecting Neutral Bushing Rod Of Power Transformer And M.S. Earthing Strip With The Help Of Flexible Copper Bond Size 35X6mm ( By Providing ) M.S. Bolt And Washer. 49 Cable Support : For Item No. 16.01 To 16.0216.01 Making, Fabrication And Erection Of Cable Support Made Of Two Pieces Of M.S. Channel ( 100X50x6 ) Mm, Joined To Each Other By Means Of M.S. Channel Pieces Of Each By Welding At Equal Intervals And Grouting In A Block Of Size ( 300X1000x1000 ) Mm In C.C. 1:3:6 Complete With One Coat Of Ready Mixed Primer And Two Coats Of Al. Paint. Work Includes Providing Of Three Nos. M.S. Clamps Made Of ( 50X6 ) Mm M.S. Flat For Holding The Cable Including Nuts And Bolts With Stone Pad Of Size ( 300X300x75mm ) . 50 Providing & Fixing 110Mm Dia 2Mm Thick 2M Long G.I.Pipe Over 11Kv, 3X300sq.Mm Xlpe Cable Before Mounting The 2No. Cable On Cable Support Structure. Work Includes Fixing Of Clamp, Sealing Of Top And Bottom End Of The G.I.Pipe. One End Of G.I.Pipe Is To Be Buried Under Earth About 500Mm. 51 Copper Bus Bar Support T-Type M.S.Structure ( As Per Site Requirement ) : For Item No.17.01 To 17.02 17.01 Makingfabrication And Grouting Erection Of M.S. Frames For Support Of Copper Bus Bar In L.V. Side Of Power Transformer. The M.S. Frame Shall Be Made Of M.S. Channel ( 100X50 ) Mm In T Shape. Drilling Of 3 Nos. Hole On The Top Channel For Fixing Of 03No. 33 Kv Post Insulator. The M.S. Frame Shall Be Painted With One Coat Of Primer & Two Coat Of Aluminium Paint And Grouting The Frame In C.C. Ratio 1:3:6 In A Block Of Size ( 300X300x700 ) Mm With Stone Pad ( By Providing ) Of Size ( 300X300x75mm ) . The Work Also Includes The Fixing Of 33Kv Post Insulator By Aluminium Binding Wire In Complete With Nut & Bolts. 52 Supply & Fabrication Of Copper Bus Bar Of Size ( 2400X50x6 ) Mm In L.V. Side For 05Mva And ( 3000X65x8 ) Mm For 10Mva T / F As Per Requirementfor Power Transformer, Work Includes Connection Of Outside Bus Bar In L.V. Side Busing Rod Of Power Transformer And Other Side With Outdoor 11 Kv Cable Box As Well As Providing Empire Tape And H.T. Tape Etc. For Proper Insulation Work Covering Copper Bus-Bar In Complete. 53 Fixing Of Cable Box On 5Mva / 10Mva T / F, 11Kv Switchgears, By Bolt & Nuts And Tapping The Joints By Providing Ht / Empire / Pvc Tape. 54 H.T. Power Cable Laying : For Item No.28.01 To 28.0228.01 Laying And Dressing Of 11 Kv 3×300 Mm2 / 3×185 Mm2 Power Cable In Air / Trench. 55 Laying 11 Kv, 3×300Mm2 / 3×185Mm2 Xlpe, Power Cable From Power T / F To Incoming Switchgear / Outgoing Switch Gear To 11 Kv Double Poles In The Cable Trench 0.45M Wide, 0.90M Depth. Providing 150 Mm Thickness Local Sand For Cushion Beneath And 150 Mm Above The Cable ( Quantity Of Local Sand Required 0.375 Cubm / M In Length ) . The Cable Shall Be Duly Protected By Brick. On Both Side Of Cable By Laying Bricks Vertically And Bricks Would Also Be Laid Horizontally On Top Of Vertically Laid Bricks Along The Cable ( Minimum 18 Nos. Per Mtr. Length Are To Be Laid Top And Outer Side Along The Cable. The Work Includes Digging Of Trenches, Laying Of Cable In Under Ground Trenches, Joining Of TerminalS, Back Filling Of Earth And Testing And Commissioning Of Power Cables Etc. Spare Cable Shall Be Left Over And Laid In The Trenches In Shape Of 6M Rings At Both Ends. At The End Of Feeder Cables, Where The Cable Is To Be Laid Across Pucca / Main Road, 150 Mm Dia G.I. Pipe Will Be Weared Over The Cable In The Cable Trench For The Protection Of Cable. G.I Pipe 150Mm Dia Will Be Provided By Contractor. 56 Laying Of Control Cable In Packka Trench, From Vcb / Cts / T / F To 33Kv Control Panel And Making Connection For Operation & Protection Of Equipments, By Using Ferrules Including Commissioning Battery Charger With Battery By Providing Copper Lead With Lugs Etc & Dressing Of Control Cable And Making Arrangement For Testing In The Equipments. 57 Assembling And Installation Of The Cabinet Of 24 Volt Battery And Battery Charger Including Grouting Of Foundation Bolt As Per Manufacturer Drawing In Control Room Including Safe Shifting. The Electric Connection Between Battery And Battery Charger By Providing Flexible Copper Lead Of Size 7 / 20Swg Shall Be Done Properly. The Work Including Wireing Upto Control Pannels, Testing & Commisnoning In Al Respect As Per Pvvnl Guidline. 58 Providing & Fixing 1 No. Mcb Box 63Amp. Tpn And 03 No. 32 Amp. Spn Box And Power Plug On Wall And It Is Proper Grouting Including It Is Connection With A / C Supply By Providing Proper Size Of Connection Wire As Per Pvvnl Guidline. 59 Construction Of Fire Wall, As Per Drawing, Made Of Cement, Sand, Concrete, Bricks, Etc., Which Will Be Arranged By The Contractor. ( Dimention-4.5X5mtr Or As Per Drawing / Site Requirement ) 60 Painting Of The Following Structure With One Coat Of Ready Mixed Primer And Two Coats Of Isi Mark Alumn. Paint After Rubbing With Sand Paper To The Surface Of The Structure Includidng Labour And T&P Complete In All Respect.:For Item No.25.01 To 25.0525.01 – Line Isolator Structure 61 Fuse Set Structure 62 Post Insulator, L.A.Structure 63 V.C.B.Structure, C.T.Structure 64 M.S.Frame For Cable 65 Providing Of Chequerred Rubber Sheet Of Size-1800X900x10mm. In Control Room. 66 Hiring Of D / G Set, Including Carriage, Loading, Unloading & Operating Charges ( With Fuel ) At 33 / 11Kv Substation, :For Item No. 27.01 To 27.0227.01 – 20 Kva, 3 Phase D / G Set For Testing Of Power T / F & Equipments Installed At Sub-Station. 67 5 Kva, Single Phase D / G Set For Welding / Testing Of Equipments Installed At Sub-Station. 68 Providing Required No. Ofskilled Technicians For Testing & Commisning To Work On Power T / F, Ht / Lt Panels, During Testing As Assisting Technical Hands Of Test Team During Commissioning & Energisation. After Installation Of New Protection Equipments ( 33Kv Vcb, C.T & Double T / F, Single T / F Control Panel ) The Contractor Will Ensure Its Testing On His Own Expences. 69 Carriage Of Received Back Material From Site To Concerned Electricity Store Center : 05 / 08Mva Transformer ( Old & Used ) If Required

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 15-Apr-2024 Date Extend Date 25-04-2024
2 25-Apr-2024 Date Extend 2nd Date 30-04-2024

Key Value

Document Fees
INR 3540 /-
EMD
INR 33000.0 /-
Tender Value
INR 33 Lakhs /-

Attachment

FileName File Description File Size
433626e6-fadf-4721-a340-dffbf04ea0f2.html Tender Notice 0 KB
BOQ_1590278.xls Tender Document 0 KB
doc46.pdf Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail