| 1 | GST % for the tender Please select the rate of GST in cell AY13. Rate selected shall be applicable for the entire BoQ. |
| 2 | Group-B Supply |
| 3 | Supply of permanently-lubricated HDPE pipe of 40 mm OD (as per TEC GR) with minimum pressure rating of 6 Kg/cm2 and wall thickness of 3.5 mm, along with duct accessories such as couplers, end caps, end sealing plugs, warning tape etc. as per specifications. |
| 4 | Supply ofOFC Jointing kits as per tender specifications. |
| 5 | Supply of full range (upto 8 feet) RF iD Disk type Electronic Markers as per tender specifications |
| 6 | Supply of pre-fabricated printed KM markers for OFC & HDPE as per tender specifications |
| 7 | Supply of Joint pit markers for OFC joint locations as per tender specifications |
| 8 | Supply ofpre-fabricated RCC (1:1.5:3) Joint Box with lid as per tender specifications |
| 9 | Supply of Transition pits for building entry points as per tender specifications |
| 10 | Supply of 89 mm OD, Schedule 80, API 5L Grade-B/ ASTM A106 MS pipe for cable conduit as per tender specifications |
| 11 | Supply of wall mounted Fibre Termination Box (FMS) as per tender specifications |
| 12 | Group-B Services |
| 13 | Laying of HDPE pipe(excluding blowing of OFC) inmainline pipe trench/ independent trench at the bottom in all types of soil (including roads, canals, rivers, nullahs, water course crossings, submerged crossings, saltpan areas etc.) including supply and installation of suitable straps for strapping the HDPE duct with mainline pipe for anti buoyancy, installation of HDPE duct accessories such as plastic couplers, end caps, end plugs, cable sealing plugs, supply and installation of warning tape, consumable guide rods, HDPE jointing, inspection of HDPE joints, testing the installed HDPE duct by blowing \"mandrel\" with compressed air,pressure testing the HDPE pipe after laying as per procedure and performing all work as per drawings, specifications and instruction of the Engineer-in-charge/ Site Engineer and provisions of the contract document for making the duct ready in all respect for OFC blowing. The job includes transportation, loading and unloadingof HDPE ducts in nominal length of 1000 meters and duct accessories such as couplers, end caps, end sealing plugs etc. to various sites along the entire ROW / HDD crossinglocations as per specifications and directions of Engineer-in-charge/ Site Engineer |
| 14 | \"Trenching for laying of HDPE in Independent trench Excavationin unpaved areas of earth in worksites for conventional cable trenches for a depth upto 1.65 metres including shoring,strutting etc. (if necessary), backfilling the trench, as directed byEngineer-in-charge/ Site Engineer,including alllabourand materials complete asper drawings and tender specifications \" |
| 15 | Transportation (loading and unloading) of Owner supplied unarmoured Optical fibre cable (OFC) to various sites along Right of Way (ROW), pre laying testing of each cable drum for each fibre and taking the OTDR traces, submission of OTDR traces (in hard as well as soft copy) to Engineer-in-charge/ Site Engineer, blowing of OFC through contractor laid HDPE, jointing / splicing of OFC, post installation testing of OFC for each fibre for each drum laid & taking OTDR traces, submission of OTDR traces (in hard as well as soft copy) to Engineer-in-charge/ Site Engineer as per the scope, specifications and directions of Engineer-in-charge/ Site Engineer. |
| 16 | Installation of OFC jointing kits as per drawings, specifications and directions of Engineer-in-charge/ Site Engineer |
| 17 | Installation of RF iD type Electronic Markers as per tender specifications. The job includes configuration & programming of the Electronic markers to write information data as per directions of Engineer-in-charge/ Site Engineer. |
| 18 | Installation of pre-fabricated printed KM markers for OFC & HDPE as per tender specifications, drawings and directions of Engineer-in-charge/ Site Engineer |
| 19 | Installation of OFC Joint pit markers at every joint location as per specifications, drawings and directions of Engineer-in-charge/ Site Engineer |
| 20 | Installation of pre-fabricated RCC (1:1.5:3) Joint Box with lidas per tender specifications, drawings and directions of Engineer-in-charge/ Site Engineer. |
| 21 | Installation of Transition Pits at building entry points as per tender specifications, drawings and directions of Engineer-in-charge/ Site Engineer |
| 22 | Installation of wall mounted Fibre Termination Box (FTB) as per tender specifications and directions of Engineer-in-charge/ Site Engineer |
| 23 | Hydrological Data Generation Hydrological data such as High Flood Level (HFL), maximum floods discharge (Q), Av. velocity of flow, extent of flood plain etc. based on previous floods, of the rivers en-route, assessment of scour depth and flow pattern of rivers in the past 10 years. Relevant details shall be collected from the concerned Irrigation Dept. office or other relevant sources. Other data based on hydrological survey of river crossings, as per details mentioned earlier, for design and installation of such crossings. |
| 24 | Cost towards HDD Works in Rocky terrain |
| 25 | Cost towards HDD Works in Normal terrain |
| 26 | Cost towards HDD Works in River area |
| 27 | Group-B Composite |
| 28 | Supply, erection and installation of GI Pipe of 100 mm nominal bore medium Class B as per IS1239 subject to owner\"s approval including the supply & installation of all necessary pipe fittings such as bends, sockets, elbows, tees etc. bending, threading, clamping, plugs, packings, bushing etc. as required for sub ducting HDPE duct as per directions of Engineer-in-charge/ Site Engineer including cost of all labour, tools, materials complete in all respects. |
| 29 | Supply and Installation of GI Pipe of 100 mm nominal bore heavy class as per IS1239, sub ducted by 40 mm OD HDPE pipe (excluding supply of HDPE pipe), by boring or jacking method across railway / road crossing, including all necessary pipe fittings, cost of arranging boring machine, other associated machinery, tools, tackles, skilled manpower, labour etc. job complete in every respects as per the directions of Engineer-in-charge/ Site Engineer. Measurement shall be done by the length of the GI pipe used in the crossings |
| 30 | Supply, installation & fixing of prefabricated perforated G.I cable trays of width 150 mm, 300 mm, 450 mm & 600 mm as per siterequirement for laying of cables with standard rung spacings. Load forsupport span of 2.5 meter as 30, 60, 75 & 90 (in Kg/Mtr) respectivelywith concentric static load as 70 Kg at the centre, with materials,labour, tools and tackles, consumables etc , asper drawings ,specification and directions ofSite Engineer / Engineer-in-Charge |
| 31 | Laying ofHDPE conduit and blowing of OFC cable inside the SV/MOV premises along the boundary wall, line item includes supply & installation ofsuitable clamps , connectors, fixture, corner bends, tools & tackles (comprising of anchor bolts/nuts/accessories etc) required for OFC entry inside SV/MOV loctaionalong theboundary wall by clamping of HDPE conduit at a height of 1 meter above the finished ground level and extending it along the length of boundary wall at 1 meter height upto the transition pit inside SV/RCP building as per attached drawing no. STD-793-00. The line item includes all sevices required for blowing of OFC cable iin HDPE conduit inside the MOV/SV loctaion as per STD - 793 drawing. |
| 32 | Group-B Liasion |
| 33 | Providing ROW Services During Construction Providing services related to opening of Right of Way (ROW) and other activities after ROU acquisition, including serving notice, making of panchnama, collection of rates for crops, preparation of compensation, providing all necessary help in closing of ROW, all complete, as per requirement of pipeline laying works, detailed scope of work, specification of tender document and direction of Site Engineer / Engineer-in-Charge inclusive of all labour, material, equipment etc., complete in all respect. |
| 34 | Establishment of camp office Total monthly payment on account of setting up of camp office in each spread. The unit \"Month\" shall be treated as per month per camp office for payment. Note:- (1) The camp office(s) in different spreads shall be setup after issuance of specific notice,works AS DESCRIBED by EIC. (2) One camp office shall be set up in each spread.Each camp office shall have minimum 1 no.manpower for carrying out day-to-day activities. (3) The total monthly payment for keeping the camp operational with minimum required manpower, as per point (2) above, shall be paid on a lump-sum basis. (4) Merely keeping a camp will not entitle the contractor to claim monthly establishment charges. Monthly charges for keeping the camp operational shall be made after certification from E.I.C that camp with requisite manpower has actually been deployed for achieving the required progress as per schedule. No payment towards monthly charges for camp office shall be made if contractor fails to provide the required services to match with the desired progress as per EIC. The decision of Engineer-in- Charge for certifying the release/non- release of monthly establishment cost will be final and binding. |
| 35 | Obtaining Approvals / Permissions Obtaining approvals / permissions from appropriate respective State / National and other Statutory Authorities for the various pipeline crossings enroute such as National Highways (NH Crossing) |
| 36 | Obtaining Approvals / Permissions Obtaining approvals / permissions from appropriate respective State / National and other Statutory Authorities for the various pipeline crossings enroute such as National Highways, State Highways, other roads, rail, river, canal / drain crossings or any other utility crossings, Forest permission, etc |
| 37 | Obtaining Approvals / Permissions Obtaining approvals / permissions from appropriate respective State / National and other Statutory Authorities for the various pipeline crossings enroute such as National Highways, State Highways, other roads, rail, river, canal / drain crossings or any other utility crossings, Forest permission, etc |
| 38 | Obtaining Approvals / Permissions Obtaining approvals / permissions from appropriate respective State / National and other Statutory Authorities for the various pipeline crossings enroute such as National Highways, State Highways, other roads, rail, river, canal / drain crossings or any other utility crossings, Forest permission, etc |
| 39 | Obtaining Approvals / Permissions Obtaining approvals / permissions from appropriate respective State / National and other Statutory Authorities for the various pipeline crossings enroute such as National Highways, State Highways, other roads, rail, river, canal / drain crossings or any other utility crossings, Forest permission, etc |
| 40 | Obtaining Approvals / Permissions Obtaining approvals / permissions from appropriate respective State / National and other Statutory Authorities for the various pipeline crossings enroute such as National Highways, State Highways, other roads, rail, river, canal / drain crossings or any other utility crossings, Forest permission, etc |