Supply, Design Manufacture, Installation, Commissioning Of Modular Supply, Design Manufacture, Installation, Commissioning Of Modular Accommodation In Wet Compartment On Turnkey Basis Under Gow Due To Mod Of Y 12707 Of P15b , Wash Basin With Splash Back & Mirror Material No.150000000000076649 , Combined Shower/Wc Cubical Should Be Of B15 Class Panel With Both Sides Ss.304 Gr With All Pumbing Fittings Within Cubical Material No.150000000000072335 , Wall Panels 25Mm Ss304 To Ss304 Material No.150000000000076650 , Double Flap Door Non Fire Class Ss304 Material No.150000000000076651 , Geyser 25L Racold Make Material No.150000000000076652 , Washing Machine Cum Dryer (Lg 9/5 Kg 5 Star Invereter Fully Automatic Front Load Washer Dryer Fhd0905sws.Assqeil,Steam Wash Technology, Silver) Material No.150000000000076653 , Cloth Dryer Arrangement (Gorillaline - Retractable Clothesline Heavy Duty Clothes Drying Laundry Line) Material No.150000000000076654 , Copper Pipe 10Nb Material No.150000000000076656 , Copper Pipe 20Nb Material No.150000000000076657 , Brass Union Coupling 20Nb Material No.150000000000076658 , Brass Union Coupling 10Nb Material No.150000000000076659 , Brass Unequal Tee 20X20x10 Material No.150000000000076660 , Ball Valve 1/2 Inch Material No.150000000000076665 , Brass Connector 1/2 Inch Male Thread To 10Nb Pipe Material No.150000000000076663 , Brass Equal Tee 10X10x10 Material No.150000000000076664 , Led Tube Light 24W With Semi Milky Diffuser Material No.150000000000076666 , Led Light 3W Red Shade Panelled Material No.150000000000076667 , Led Light, 12W With Semi Milky Diffuser Material No.150000000000076668 , Wash Basin With Splash Back & Mirror 1066X385x1680 Material No.150000000000076707 , Wc Cubicle With Accessories Material No.150000000000076708 , Shower Cubicle With Panels 25Mm And Accessories Material No.150000000000076709 , Deck Covering Material Wet Compartment Material No.150000000000076710 , Dado Area Wet Compartment Material No.150000000000076711 , Services For Modification & Installation To Convert For Off Wc And Bath Into Lady Hod Wc/Bath A) Removal/Degutting Of Hotwork For Wc Cubical From Officer Wc&Bath For Creation Of Enclosure For Lady Hod Wc/Bath B)Fitment Of Two Half Door C)Installation Of New Wash Basin In The Compartment D)Fitment Of Accessories For Bath/Wc(Gratings, Pipes,Showers,Handhold,Etc) In Ladyhod Wc/Bath E)Fitment Of Scrupper, Deck Fittings For Drainage& Connecting Same In Down Below Compartment To Header Line F)Modification Of Hvac Trucking As Required G)Modification Of Local Cable Route& Light Fittings As Required . H)Modification Of Gws Pipes As Per New Layout (Fabrication,Installation &Testing And Connections Within Compartment)/Material Required To Be Supplied By Yard I)Modification Of Vac Pipes As Per New Layout (Fabrication, Installation,& Testing And Connections)/Material Required To Be Supplied By Yard J)Laying Of Fws Pipes As Per New Layout (Inclusive Of New Material, Fabrication, Installation & Testing & Connections) , Services For Modification & Installation To Convert Br Locker Db Cabin 01 Into Lady Officers Bath & Wc A) Installation Of Long Modular Partition Bhd For Creation Of New Compartment Lady Officers Wc/Bath B)Fitment Of 2Wc Cubicles In Newly Created Lady Officers Wc/ Bath Along With All Accessories C)Installation Of 2 Shower Cubicals & Sink In Lady Officers Bath D)Fitment Of Door In Lady Officers Wc /Bath. E)Modification Of Hvac Trucking F)Modification Of Local Cable Route& Light Fittings G)Laying Of Deck Covering As Required H)Modification Of Gws Pipes As Per New Layout (Fabrication,Installation &Testing And Connections Within Compartment)/Material Required To Be Supplied By Yard I)Modification Of Vac Pipes As Per New Layout (Fabrication, Installation,& Testing And Connections)/Material Required To Be Supplied By Yard J)Modification Of Fws Pipes As Per New Layout (Inclusive Of New Material, Fabrication, Installation & Testing & Connections) , Services For Modification & Installation To Convert Catering Office And Ru Store To Lady Sailors Wc/Bath A)Intallation Of 2Wc Cubical In Catering Office Along With All Piping And Accessories B)Removal Of Existing Seatings From Catering Office And Ru Store. C)Installation Of 2 Shoer Cubical In Catering Office Along With All Piping & Accessories D)Modification Of Hvac Trucking As Required E)Modification Of Local Cubical Route& Light Fittings As Required In Ss Bath F)Laying Of Deck Covering As Required In Catering Office And Ru Store G)Modification Of Gwas Pipes As Per New Layout ((Fabrication,Installation &Testing And Connections Within Compartment)/Material Required To Be Supplied By Yard H)Modification Of Vac Pipes As Per New New Layout ((Fabrication,Installation &Testing And Connections Within Compartment)/Material Required To Be Supplied By Yard I)Laying Of Fws Pipes As Per New Layout (Inclusive Of New Material, Fabrication, Installation & Testing & Connections)