Tender For Rate Contract For A Period Of 2 Years To Appoint The Contractors For Attending The After-Sales Service Requisite, Preventive Breakdown Maintenance Of Png Customers For Cgd Network Of Mngl, Nashik., nashik-Maharashtra

Maharashtra Natural Gas Ltd-MNGL has published Tender For Rate Contract For A Period Of 2 Years To Appoint The Contractors For Attending The After-Sales Service Requisite, Preventive Breakdown Maintenance Of Png Customers For Cgd Network Of Mngl, Nashik.. Submission Date for this Tender is 03-04-2024. Man Power Supply Tenders in nashik Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

43016748
Tender For Rate Contract For A Period Of 2 Years To Appoint The Contractors For Attending The After-Sales Service Requisite, Preventive Breakdown Maintenance Of Png Customers For Cgd Network Of Mngl, Nashik.
Open Tender
Indian
Maharashtra
nashik
03-04-2024

Tender Details

Rate Contract For A Period Of 2 Years To Appoint The Contractors For Attending The After-Sales Service Requisite, Preventive Breakdown Maintenance Of Png Customers For Cgd Network Of Mngl, Nashik.

Key Value

Document Fees
Refer document
EMD
INR 120000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: "Tender for Rate Contract for a period of 2 (Two) years to appoint the contractors for attending the After-Sales service requisite, preventive & Breakdown maintenance of PNG customers for CGD Network of MNGL, Nashik."
Sl. No. Item Description
1PART (A) : Maintenance and Emergency Work for MNGL Assets
2AMC of PNG Domestic Connection (Testing,Painting,Clamping,Emergency no marking & inspection of rubber tube etc)
3AMC of GI Pipeline (Risers) All Dia (Testing,Painting,Clamping,Riser Marking etc)
4AMC of MDPE Pipeline all Dia (SR Network)(Testing,Painting,TF Testing,Riser/SR Marking etc
5AMC of Commercial Connection
6Emergency Work (Rectification & Repairs work etc.)
7Removal of GI Pipe(Threaded or Welded) All Size
8Installation of GI Pipe(Threaded or Welded) All Size
9MDPE Line Re-routing, rectification etc. 32mm to 90mm Dia
10MDPE Line Re-routing, rectification etc. 125mm Dia
11Civil Work - Riser/ TF Pedustal with sand filling, painting etc.
12Civil Work - Repair of SR foundation with painting and sand filling etc.
13Civil Work - Construction of SR foundation with painting and sand filling etc.
14Civil Work - Sand filling of TF Pedustal
15Civil Work - Sand filling of SR foundation
16Civil Work - PCC, RCC ,Paver Blocks /Farshi etc
17Replacement of Appliance valves
18Replacement of RIV,MCV1 & MCV2
19Replacement of Reguletor
20PART (B) : After Sales Service Request by PNG Customer
21Temporary Dissconnection of Domestic Meter (Customer Request)
22Contractor has to perform the "Temporary Disconnection" request as per SLA and it covers the removal of meter copper with all accesories from MCV2 , provide the safe isolation/plugging by GI end plug, Handover all the materials removed i.e Meter, Copper pipe,Regulators etc. to customers in good and reusable conditions, meter reading etc. and get it recorded in the report with cutomers signature.
23Permanent Dissconnection of Domestic Connection (Customer Request)
24Contractor has to perform the "Permanent Disconnection" request as per SLA and it covers the removal of GI form MCV-I to MCV-II, meter-copper with all accesories, provide the safe isolation/plugging by GI end plug at MCV-I, restoration of wall holes with cement etc., record all the activity, materials removed i.e GI, Meter, Copper pipe,Regulators etc. in the report with final/last meter reading and get the certfication of cutomers on the same. The removed material shall be handed over to MNGL.
25Reconnection, Rerouting, Modification of Domestic PNG connection (Customer Request)
26The SOR covers the service, labour, consumable, fittings, tools etc. foruser request of "Reconnection"after Temporary disconnection, "Rerouting ", Modification, Reinstallation etc inside the kitchen (From MCV-II) excpet rerouting of GI (from MCV-I to MCV-II etc. which is payable under SOR 2), Test of the installation, Restore the gas supply up to stove. Contractor can claim the useded material under Part C-SOR No: 1 to 12 and extra material other then this SORs if required to complete the job shall be supplied by the contrcator on his cost. Also the SOR covers the all consumabels like installation of PVC clips (Cu claimping), restoretion, sholdering, scrow etc.
27Testing of Domestic meters with master calibrated meter (For low/high/zero consumption.) & Replacement(Customer Request)
28The SOR covers the labour, manpower, consumables, tools, equiepment, mobilization, transportetion leak testing of asset etc which is required to complet or close the Customer Request as "Meter Running Fast" , "Meter Running Slow", "Meter Not Moving", "Faulty meter" or any other meter related complaints. Contractor has to perform the testing of the customers meter as per the standard procedure of MNGL with or without using of Standard Calibrated Meter provided by MNGL. In caseof faulty, Meter not running etc. contrcator has to replace such meter with new meter and has to record all the data like old meter No, closing reading, new meter no, opening reading etc. The contractor will submit the service report with all required details, duly signed by MNGL & the customer.
29Testing of Domestic meters with master calibrated meter (For Fast /Slow Running Meter)
30D.Meter replacement Without Alteration
31Conversion of LPG Stove to PNG gas stove All Size & Types(Customer Request)
32The SOR covers the labour, manpower, consumables, tools, equiepment, Nozzles, mobilization, transportetion, leak testing of asset etc which is required to complet or close the Customer Request as "Conversion of LPG Stove to PNG Gas Stove" or any other meter related complaints. Contractor has to perform the testing of the customers Gas Stove as per the standard procedure of MNGL after the conversion. The contractor will submit the service report with all required details, duly signed by MNGL & the customer.
33Rerouting/Shifting/Replacment (Bulk Customer Request)
34SOR covers the supply of tools, equipment’s, fittings, manpower, machine, consumable, transportation, coordination with MNGL/ Customer/ Society/ authority, collection of the payment against the service, obtaining permission, scheduling the requetes/activities, taking cost approval from EIC/Customer/society etc. whichever is required to complete the job as per the SLA and satitisfaction & direction of EIC. Contractoralso needs to prepair or maintain the activity reports along with all documents, photo etc and submit to MNGL. Contractor has to perform the "Request" as per SLA and it covers the completion of Job, removal/installation of Pipeline GI-MDPE-copper with all accesories, provide the safe isolation/plugging, ensuring safety complainces at site, Handover of all materials removed i.e GI,MDPE, Meter, Copper pipe,Regulators, Valves etc. to MNGL or Re-Use as per the direction of EIC. ALso ensureing the continuous supply of PNG to the customers. The jobs under "Rectification & Repairs" may call for immediate actions, in order to maintain the continouse gas supply to the customers. The contractor should also maintain / arrange workforce to respond and attend "Rectification & Repairs" as an urgent / emergency requirement with in the given timeline or immidate basis.
35Removal of GI Pipe(Threaded or Welded) Size 1",1/2",3/4",1.5" & 2" (Bulk Customer Request)
36Installation of GI Pipe(Threaded or Welded) Size 1",1/2",3/4",1.5" & 2" (Bulk Customer Request)
37SR Shifting (Bulk Customer Request)
38SOR covers the complete activities which required to shift the SR from one location to another and, construction of SR foundation, Filling of sand, Sleeves, commissioning,Testing with necessary modification in MDPE pipline (if required), Re construction of SR foundation-painting-letter weitting etc. as per the direction of EIC.
39Construction of SR frondation
40Laying, Shifting, re-routing of MDPE 32mm to 90mm
41Laying, shifting, re-routing of MDPE 125mm
42After Sales Services - Commercial Customers
43RE-connection/ Re-routing of Commercial Connection. (Customer Request)
44The SOR covers Rerouting and reconnection of commercial connection as per MNGL instruction. First, the vendor has to disconnect the existing connection remove the Meter, regulator, TF & GI. Then, he has to finalize the route in consultation with the customer and take the approval from EIC of the approved route on SLD. Then he has to start the installation activity of the TF & GI Pipe from the new route finalized by MNGL clamping the pipe at every 1 meter. To protect TF, he has to install a sleeve, construct the pedestal, & fill the sand in the TF pedestal. After the installation, the gas line is under positive pressure for testing to check leakages & after that, reinstall Meter and regulator at the new location. If leakage is observed during testing vendor has to rectify it and again put the installation for testing under positive pressure. In case of no leakage identified, then the vendor has to commission the new installation in the presence of MNGL to restore the gas supply, but before that, painting of GI pipe, clamps and pedestal should be completed after the commissioning vendor has to submit all the materials,Meter, regulator and pipes to MNGL stores and take NOC from MNGL and submit the commissioning/service report.The service, labour, consumable cost etc., for "Reconnection"and "Rerouting "is payable along with SOR E.01 to E.15. The extra/additional/new material not listed in SOR E.01 to E.15 but required to complete the job shall be supplied by the contractor. The use of list items will be chargeable for customer and contractor can claim accordingly and at actual as recorded in-service report, duly signed by the customer and MNGL.
45Upgradation of Commercial Connection (Customer Request)
46The SOR covers the up-gradation of commercial connection as per MNGL instruction. First, the vendor has to disconnect the existing connection remove the Meter, regulator, TF & GI. Then, he has to finalize the route in consultation with the customer and the upgraded equipment list(GI Pipe size, meter size, Regulator size) and take the approval from EIC of the approved route on SLD and upgraded equipment. Then he has to start the installation activity of the TF & GI Pipe from the new route finalized by MNGL clamping the pipe at every 1 meter. To protect TF, he has to install a sleeve, construct the pedestal, & fill the sand in the TF pedestal. After the installation, pneumatic testing is done by keeping the gas line under positive pressure for testing to check leakages & after that, reinstall Meter and regulator at the new location. If leakage is observed during testing vendor has to rectify it and again put the installation for testing under positive pressure. In case of no leakage is identified, then the vendor has to commission the new installation in the presence of MNGL to restore the gas supply. However, before that, painting of GI pipe, clamps and pedestal should be completed after the commissioning vendor has to submit all the materials, old Meter, regulator and pipes to MNGL stores and take NOC from MNGL and submit the commissioning/service report. The service, labour, consumable cost are payable along with SOR E.01 to E.15. The extra/additional/new material not listed in SOR E.01 to E.15 but required to complete the job shall be supplied by the contractor. The use of list items will be chargeable for customer and contractor can claim accordingly and at actual as recorded in-service report, duly signed by the customer and MNGL.
47Visit charges / Technical Support on Customer Request(The SOR covers the technical services at Customer premises to estimate the job to be carried out with cost expences upon Customers Request. The SOR includes the cost of Transportation, Tools & Tackles, consumables etc.)
48PART (C) : Supply & Installation (Contractor Supplied Material)
49Supply and installation of Rubber tube Upto 1.5 m
50Supply and installation of Clamping on the CU pipe upto 12 MM
51Supply and Installation of Brass fitting
52Supply and installation of Meter bracket
53Supply and Installation of copper fittings
54Supply and installation of Core cutting PCC/ RCC up to 2"
55Supply and installation of PVC sleev upto 2 inch (L-12")
56Supply and installation of Clamping on the GI pipe upto 2 inch
57Supply and Installation GI thread fitting 1/2 inch,3/4 inch & 1 inch
58Supply and Installation GI forged fitting 1/2 inch,3/4 inch,1 & 2 inch
59Supply and Installation Plate markets etc.
60Supply and Installation RCC Route markets etc.
61Supply and Installation of Pressure gauge etc. (0-500mbar)
62Supply and Installation of Pressure gauge etc. (0-4bar)
63Supply and Installation of Pressure gauge etc. (0-10bar)
64Supply and Installation of Transition Fitting 1"
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail