| 1 | Providing and Applying two coats of polyurethane base paint with one coat ofsuitable primer on vertical gas storage vessels using 1st quality paint from approved manufacturer of approved colour and shade to give an even shade including,scaffolding, removing of rust, cleaning the surface, preparing the surface to receive paint including filling cracks and creaves with suitable putty or other approved filler materials, . cost also includes thinner, filler, putty andother materials, necessary labours, scaffolding etc. complete as directed by Engineer in charge at all heights(up to 15 meter), in all floors. Note:-(1) Surface area of actual painted area will be measured and paid.(2) polyurethane base paint of approved brand(3) Suitable primer for polyurethane base paint of approved brand(4) Thinner to be used as per the Manufacturer\"s specification |
| 2 | Providing and Applying two coats of chlorinated rubber paint with one coat of primer on vertical gas storage vessels using 1st quality paint from approved manufacturer of approved colour and shade to give an even shade including scaffolding, removing of rust, cleaning the surface, preparing the surface to receive paint including filling cracks and creaves with Putty or other approved filler materials, applyingtwo coats of paint to steel work. cost also includes thinner, filler, putty andother materials, necessary labours, scaffolding etc. complete as directed by Engineer in charge at all heights(up to 15 meter), in all floors. Note:-(1) Surface area of actual painted area will be measured and paid.(2) Chlorinated rubber paint of approved brand(3) Suitable primer for chlorinated rubber paintof approved brand(4) Thinner to be used as per the Manufacturer\"s specification |
| 3 | Providing and Applying two coats of Synthetic enamel paint on old doors and windows, MS members using 1st quality paint from approved manufacturer of approved colour and shade to give an even shade including scaffolding, removing of paint that is soft, blistered, loose or flanking & cleaning old surface, preparing the surface to receive paint including filling cracks and creaves with Putty or other approved filler materials, applyingoil primer coats / anti corrosive zinc based yellow primer to steel work. cost also includes thinner, filler, putty, primer andother materials, necessary labours etc. complete as directed by Engineer in charge at all heights, in all floors.Note:- Measurements of doors and windows will be taken as per relevant IS code. Surface area of all MS Members will be taken for measurement (1) Synthitic enamel Paint of approved brand (2) Zinc based yellow Primer(3) Putty suitable to Mild steel members of approved brand (4) Putty on wood work - oil base putty |
| 4 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.Note:- Removing of emulsion paint, white wash, oil paint or enamel paint for Internal wall, exterior paint on external wall (including washing), wood work, steel work etc. by sand paper, wire brush, roll paper etc. to receive fresh coat of paint is also covered under item. Rates also includes scaffolding, covering of wool pile carpet and cleaning the same by vaccum after work completion. Measurements will be done as per relevant IS Code. Complete all as directed by EIC. |
| 5 | Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives.New /old work (Two or more coats applied @ 1.43 litre/ 10 sqm. Over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm, complete in all respect as per the direction of Engineer-in-Charge. Note:- Rates includes scaffolding, surface preparation, crack opening and filling with approved filler material (filling cracks - SBR polymer with cement as per manufacturers specification). The paint coefficient will be 1.00 irrespective of applying on plain / sand face plaster / bricksurface.No extra measurement will be paid for painting on rough or sand face plaster or brick surface with groove. Complete all as directed by EIC |
| 6 | Providing and applying white cement based putty two or more coat to achieve required finish on wall, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.Note:-for internal walls only, Rates includes scaffolding and sand papering of wall after putty. The thickness of putty should be1.0 mm or more. Measurements will be done as per relevant IS Code |
| 7 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : Water thinnable cement primerNote:- For Internal wall only, rates includes scaffolding. Measurements will be done as per relevant IS Code. Complete all as directed by EIC |
| 8 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour In TWO coat.Note:- Rates includes scaffolding, crack opening and filling with approved filler material (filling cracks - SBR polymer with cement as per manufacturers specification). Measurements will be done as per relevant IS Code. Complete all as directed by EIC |
| 9 | Earth work in excavation (includuding mix aggregate) by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 10 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 11 | Providing and laying in position cement concrete of specified grade excluding the cost of centering andshuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40/20 mm nominal size derived from natural sources) |
| 12 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position andbinding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form work for :Foundations, footings, bases for columns |
| 14 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. |
| 15 | Cement plaster 1:3 (1 cement : 3 course sand) finished with a floating coat of neat cement 20 mm cement plasterNote: water proofing plaster for any lead and lift. Water proofing compound material shall be paid under respective item. NOTE: Including scaffolding, curing etc |
| 16 | Providing, laying, spreading and compacting graded stone aggregate (size range 40 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers mannual in sub- base / base course on well prepared surface and compacting with plate vibrator or manual compactor to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge. |
| 17 | Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having sun reflectivity index(SRI) of 105 on top of concrete roof in three coats @ 10.76 litre/10 sqm.One coat of self-priming of elastomeric waterproofing liquid(dilution with water in the ratio of 3:1) and two coats of undiluted elastomeric waterproofing liquid ( dry film thickness of complete application/system not less than 500 microns).The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes,complete in all respect as per the direction of Engineer-in-Charge. |
| 18 | Providing & Applying polymer modified, flexible cementatious negative side waterproofing coating with elastic waterproofing polymers on interior wall plaster surface in three coats @14.35 kg /10 sqm. one coat of self priming of cementatious waterproofing polymer(dilution with water in the ratio of 1:1) and two coats of cementatious waterproofing polymer (dilution with water in the ratio of 3:1 ) after scrapping and properly cleaning the surface to remove pre-existing paint film & loose particles till plaster is visible, complete in all respect as per the direction of Engineer-in-Charge.Note:-Rates includes scaffolding, crack opening and filling with approved filler material. |
| 19 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-chargeIn cement mortar |
| 20 | Providing welder with helper for fixing of chain linking fencing structure at suitable places and other miscellaneous work with required welding tools and tackles etc, as directed by Engineer in charge. Any Consumable material will be provided by Institute. |
| 21 | Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, complete as per directions of Engineer-in-charge.Note - 1. Item to be applicable in urban areas having directions for restricted hours for movement / plying of load carrying motor vehicle of 3.5 cum or more.2. Voids @20% for solids and 50% for rock shall be dedcuted from fully loaded truck measurement to arrive at the net quantity for payment in case of direct measurement is not possible.3. The cost is inclusive of necessary permisiion from statutory authorities for dumping the debris/excess earth outside department premises |
| 22 | Extra for disposal of earth / metal (aggregate) etc over initial lead of 50 mt. and up to 1 Km including mechanical transporation, loading, unloading, stacking etc within campus as directed by engineer in charge |
| 23 | Lettering with suitable paint (Rubber or Polyurethane) of approved colour, brand and manufacture. Note: Rate is for per Letter per cm. height. Work to be carried out at any height(Up to 15 meter) including scaffolding. |
| 24 | Providing Casual labour for soil excavation below chain link fencing structure at helium yard and other miscellaneous works |
| 25 | Providing, fabricating, assembling, hosting / erecting and fixing in position at less heightsall shapes and sizes with all leads and lifts, structural steel angle section flats wherever requiredas per detailed drawing and design including cutting, wastage, welding, bending (shop at site), hoisting, drilling, fixing in position, bolting wherever necessary, in position welding of required lengths, griding, finishing edges all as per instructions, specifications and as directed by Engineer – in – Charge (only standard measurements will be paid) |