Power Boards / Undertakings / PSU Closing in 0 days TDR #43001055

Work Of Carriage Of Galvanized Substation Structures, Dismantling Of Old 132 Kv Sf-6 Circuit Breaker And Installation Of New 132 Kv Sf-6 Circuit Breaker Alongwith Other Associated Works At 220 Kv Badaun Substation And 132 Kv Aonla Substation For Bareilly

Issued by Boards / Undertakings / PSU · budaun, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
26 Mar 2024
0 days left
EMD
2000
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
budaun → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Work Of Carriage Of Galvanized Substation Structures, Dismantling Of Old 132 Kv Sf-6 Circuit Breaker And Installation Of New 132 Kv Sf-6 Circuit Breaker Alongwith Other Associated Works At 220 Kv Badaun Substation And 132 Kv Aonla Substation For Bareilly Dairy Bay Work Under E.T.D., Budaun., Against E-Tender No. 06 / W / Etd ( Bdn ) / 2023-24.- 1 A. Supply Component ( I ) Supply Of 132 Kv Isolator Clamp Type Duly Made Of Lm-6 Aluminium Alloy, Suitable For Single Acsr Panther Conductor Complete Withg.I. Bolts, Nuts, Spring & Plain Washers As Per Sample. 2 ( Ii ) Supply Of Pg Clamp Duly Made Of Lm-6 Aluminium Alloy, Suitable For Acsr Panther Topanther Conductor Complete With 3 No. 20X 75 Mm Size G.I. Bolts, Nuts, Spring & Plain Washers, As Per Sample 3 ( Iii ) Supply Of 132 Kv Ct Clamp Type Duly Made Of Lm-6 Aluminium Alloy, Suitable For Single Pantherconductor Complete Withg.I. Bolts, Nuts, Spring & Plain Washers As Per Sample 4 75X10 Mm Ms Flat For Grounding / Earthing System 5 50X6 Mm Ms Flat For Grounding / Earthing System 6 B. Work Component 1. Transportation Of Galvanized Substation Structures From Efu, Naini, Prayagraj To 220 Kv Badaun Substation For Erection Of 132 Kv Transfer Bus Coupler System And Other O&M Works At 220 Kv Badaun Substation And 132 Kv Aonla S / S For Bareilly Dairy Bay Work ( Approximate Distance : 550 Km ) Note: This Work Will Be Completed Depending On Availability Of Thegalvanized Substation Structures At Efu, Naini, Prayagraj, Alloted Vide L. No : 456-Esdc-Ii / U / Efu Allotment Dt 27.06.2023, And 840-Esdc-Ii / U / Efu Allotment Dt 23.12.2023 . ( I ) Sorting, Counting, Weighing And Loading Of Galvanized Substation Structures As Per Bom At Efu Naini, Prayagraj Including Cost Of All Labour, T&P, Hydra Etc For Proper Completion Of Work. ( Bbl : 03 Nos With Approx 500.96 Kg For Each Set, Bct : 03 Nos With Approx 179.26 Kg For Each Set, Cgr : 01 Nos With Approx 304.76 Kg For Each Set, Alp : 09 Nos With Approx 121.00 Kg For Each Set, Abl : 04 Nos With Approx 341.00 Kg For Each Set ) 7 ( Ii ) Safe Transportation Of Galvanized Substation Structures By Private Truck Arranged By The Contractor From Efu, Naini, Prayagraj To 220 Kv Badaun Substation And 132 Kv Aonla Substation ( Approximate Distance : 550 Km ) ( Not More Than 9 Mt On 1 No Truck, 1 Job Per Truck ) Including All Toll Charges Incurred During The Journey 8 ( Iii ) Unloading Of Galvanized Substation Structures From The Truck , Sorting, Weighing And Proper Stacking In The Store As Per Bom At 220 Kv Badaun Substation Including Cost Of All Labour, T&P, Hydra Etc. ( Bbl : 03 Nos With Approx 500.96 Kg For Each Set, Bct : 03 Nos With Approx 179.26 Kg For Each Set ) 9 ( Iv ) Unloading Of Galvanized Substation Structures From The Truck , Sorting, Weighing And Proper Stacking In The Store As Per Bom At 132 Kv Aonla Substation Including Cost Of All Labour, T&P, Hydra Etc ( Cgr : 01 Nos With Approx 304.76 Kg For Each Set, Alp : 09 Nos With Approx 121.00 Kg For Each Set, Abl : 04 Nos With Approx 341.00 Kg For Each Set ) . 10 2. Dismantling Of Old & Defective 145 Kv Circuit Breakerinstalled At 132 Kv Capacitor Bank In Switchyard Of 220 Kv Badaun Substation ( I ) Dismantling Of Old & Defective 145 Kv Circuit Breaker By Cutting Its Earthing, Opening Of Jumpers, Opening Of Cable Termination Including Shifting Of Of Dismantled Material From From Site To Outside The Open Store With All Men, Materials, T&P Like Grinding / Cutting Machine Etc To Be Arranged By The Contractor At His Own Cost 11 3. Installation And Commissioning Of New 145 Kv Circuit Breaker Installed At 132 Kv Capacitor Bank In Switchyard Of 220 Kv Badaun Substation. Note: This Work Will Be Completed After Modification / Construction Of Foundation By Civil Wing. ( I ) Erection Of New 145 Kv Circuit Breaker With Its Structure In Place Of Old 145 Kv Circuit Breaker On Modified Foundation With The Help Of Skilled Labour, Hydra / Crane Etc To Be Arranged By The Contractor 12 ( Ii ) Jumpering Work Of New Circuit Breaker By Acsr Panther Conductor Including Fixing And Tightening Of Circuit Breaker Clamp With All Associated Work ( Total 06 Nos. Of Jumper ) 13 ( Iii ) Earthing Of New Circuit Breaker By 75X10 / 50X6 Mm Ms Flat With All Associated Works 14 ( Iv ) Laying Of Any Size Control Cable ( 2Cx2.5 Sqmm / 4Cx2.5 Sq Mm / 6Cx2.5 Sq Mm ) In Cable Trenches From Control And Relay Panel In Control Room To Various Equipments, Junction Boxes Etc In Switchyard As Per Cable Schedule Including Shifting Cable In Drums From Storage Place At The Substation To Erection Site And Shifting Back The Balance Cables To Stores At The Substation 15 ( V ) Termination Of Various Sizes Control Cables Already Laid / Newly Laid For 145 Kv Circuit Breaker At Circuit Breaker End, C&R Panel End Including Extension Of Dc Supply From Dcdb , Ac Supply From Acdb To Control Panels And Equpments Including Drilling Of Holes, Providing And Fixing Of Cable Glands, Ferrules And Crimping Type Lugs, Testing And Commissioning Of This Newly Installed Circuit Breaker In Presence Of Commissioning Engineer And T&C Team Etc.

BOQ

Name of Work : Work of Carriage of Galvanized substation structures, dismantling of old 132 Kv SF-6 Circuit Breaker and installation of new 132 kV SF-6 Circuit Breaker alongwith other associated works at 220 Kv Badaun Substation and 132 Kv Aonla Substation for Bareilly Dairy Bay Work under E.T.D., Budaun.,against E-Tender No. 06/W/ETD(BDN)/2023-24.
Sl. No. Item Description
1A. Supply Component(i) Supply of 132 kV Isolator Clamp type duly made of LM-6 Aluminium Alloy, suitable for Single ACSR Panther Conductor complete withG.I. Bolts, Nuts, Spring & Plain Washers as per Sample.
2(ii) Supply of PG Clamp duly made of LM-6 Aluminium Alloy, suitable for ACSR Panther toPanther Conductor complete with 3 No. 20x 75 mm size G.I. Bolts, Nuts, Spring & Plain Washers,as per Sample
3(iii) Supply of 132 kV CT Clamp type duly made of LM-6 Aluminium Alloy, suitable for Single PantherConductor complete withG.I. Bolts, Nuts, Spring & Plain Washers as per Sample
475X10 mm MS Flat for Grounding/ Earthing System
550X6 mm MS Flat for Grounding/ Earthing System
6B. Work Component 1. Transportation of Galvanized substation structures from EFU, Naini, Prayagraj to 220 Kv Badaun Substation for erection of 132 Kv Transfer Bus Coupler system and other O&M works at 220 Kv Badaun Substation and 132 kV Aonla s/s for Bareilly Dairy Bay work (Approximate Distance : 550 Km) Note: This work will be completed depending on availability of theGalvanized substation structures at EFU, Naini, Prayagraj, alloted vide L. No : 456-ESDC-II/U/EFU Allotment Dt 27.06.2023, and 840-ESDC-II/U/EFU Allotment Dt 23.12.2023 .(i) Sorting, counting, weighing and loading of Galvanized substation structures as per BOM at EFU Naini, Prayagraj including cost of all labour, T&P, hydra etc for proper completion of work. (BBL : 03 Nos with approx 500.96 kg for each set, BCT : 03 Nos with approx 179.26 kg for each set,CGR : 01 Nos with approx 304.76 kg for each set, ALP : 09 Nos with approx 121.00 kg for each set, ABL : 04 Nos with approx 341.00 kg for each set)
7(ii) Safe transportation of Galvanized substation structures by private truck arranged by the contractor from EFU, Naini, Prayagraj to 220 Kv Badaun Substation and 132 kV Aonla Substation(Approximate Distance : 550 Km)(Not more than 9 MT on 1 No truck, 1 job per truck) including all Toll charges incurred during the journey
8(iii) Unloading of Galvanized substation structures from the truck , sorting, weighing and proper stacking in the store as per BOM at 220 Kv Badaun Substation including cost of all labour, T&P, hydra etc.(BBL : 03 Nos with approx 500.96 kg for each set, BCT : 03 Nos with approx 179.26 kg for each set)
9(iv) Unloading of Galvanized substation structures from the truck , sorting, weighing and proper stacking in the store as per BOM at 132 kV Aonla Substation including cost of all labour, T&P, hydra etc(CGR : 01 Nos with approx 304.76 kg for each set, ALP : 09 Nos with approx 121.00 kg for each set, ABL : 04 Nos with approx 341.00 kg for each set).
102. Dismantling of old & defective 145 Kv Circuit Breakerinstalled at 132 Kv Capacitor Bank in switchyard of 220 Kv Badaun Substation (i) Dismantling of old & defective 145 Kv Circuit Breaker by cutting its earthing, opening of jumpers, opening of cable termination including shifting of of dismantled material from from site to outside the open store with all men, materials, T&P like grinding/cutting machine etc to be arranged by the contractor at his own cost
113. Installation and commissioning of new 145 Kv Circuit Breaker installed at 132 Kv Capacitor Bank in switchyard of 220 Kv Badaun Substation. Note: This work will be completed after modification/construction of foundation by Civil wing.(i) Erection of new 145 Kv Circuit Breaker with its structure in place of old 145 Kv Circuit Breaker on modified foundation with the help of skilled labour, hydra/crane etc to be arranged by the contractor
12(ii) Jumpering work of new Circuit Breaker by ACSR Panther Conductor including fixing and tightening of Circuit Breaker clamp with all associated work (Total 06 nos. of jumper)
13(iii) Earthing of new Circuit Breaker by 75X10/50X6 mm MS Flat with all associated works
14(iv) Laying of any size control cable(2CX2.5 sqmm/ 4CX2.5 sq mm/ 6CX2.5 sq mm) in cable trenches from control and relay panel in control room to various equipments, junction boxes etc in switchyard as per cable schedule including shifting cable in drums from storage place at the substation to erection site and shifting back the balance cables to stores at the substation
15(v) Termination of various sizes control cables already laid/ newly laid for 145 Kv Circuit Breaker at Circuit Breaker end, C&R panel end including extension of DC supply from DCDB , AC supply from ACDB to control panels and equpments including drilling of holes, providing and fixing of cable glands, ferrules and crimping type lugs, testing and commissioning of this newly installed Circuit Breaker in presence of commissioning engineer and T&C team etc.

AI Tender Summary

OUR REF NO 43001055
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 26-03-2024
Authority
Authority Name Uttar Pradesh Power Transmission Corporation Limited
Work Description Work Of Carriage Of Galvanized Substation Structures, Dismantling Of Old 132 Kv Sf-6 Circuit Breaker And Installation Of New 132 Kv Sf-6 Circuit Breaker Alongwith Other Associated Works At 220 Kv Badaun Substation And 132 Kv Aonla Substation For Bareilly Dairy Bay Work Under E.T.D., Budaun., Against E-Tender No. 06 / W / Etd ( Bdn ) / 2023-24.- 1 A. Supply Component ( I ) Supply Of 132 Kv Isolator Clamp Type Duly Made Of Lm-6 Aluminium Alloy, Suitable For Single Acsr Panther Conductor Complete Withg.I. Bolts, Nuts, Spring & Plain Washers As Per Sample. 2 ( Ii ) Supply Of Pg Clamp Duly Made Of Lm-6 Aluminium Alloy, Suitable For Acsr Panther Topanther Conductor Complete With 3 No. 20X 75 Mm Size G.I. Bolts, Nuts, Spring & Plain Washers, As Per Sample 3 ( Iii ) Supply Of 132 Kv Ct Clamp Type Duly Made Of Lm-6 Aluminium Alloy, Suitable For Single Pantherconductor Complete Withg.I. Bolts, Nuts, Spring & Plain Washers As Per Sample 4 75X10 Mm Ms Flat For Grounding / Earthing System 5 50X6 Mm Ms Flat For Grounding / Earthing System 6 B. Work Component 1. Transportation Of Galvanized Substation Structures From Efu, Naini, Prayagraj To 220 Kv Badaun Substation For Erection Of 132 Kv Transfer Bus Coupler System And Other O&M Works At 220 Kv Badaun Substation And 132 Kv Aonla S / S For Bareilly Dairy Bay Work ( Approximate Distance : 550 Km ) Note: This Work Will Be Completed Depending On Availability Of Thegalvanized Substation Structures At Efu, Naini, Prayagraj, Alloted Vide L. No : 456-Esdc-Ii / U / Efu Allotment Dt 27.06.2023, And 840-Esdc-Ii / U / Efu Allotment Dt 23.12.2023 . ( I ) Sorting, Counting, Weighing And Loading Of Galvanized Substation Structures As Per Bom At Efu Naini, Prayagraj Including Cost Of All Labour, T&P, Hydra Etc For Proper Completion Of Work. ( Bbl : 03 Nos With Approx 500.96 Kg For Each Set, Bct : 03 Nos With Approx 179.26 Kg For Each Set, Cgr : 01 Nos With Approx 304.76 Kg For Each Set, Alp : 09 Nos With Approx 121.00 Kg For Each Set, Abl : 04 Nos With Approx 341.00 Kg For Each Set ) 7 ( Ii ) Safe Transportation Of Galvanized Substation Structures By Private Truck Arranged By The Contractor From Efu, Naini, Prayagraj To 220 Kv Badaun Substation And 132 Kv Aonla Substation ( Approximate Distance : 550 Km ) ( Not More Than 9 Mt On 1 No Truck, 1 Job Per Truck ) Including All Toll Charges Incurred During The Journey 8 ( Iii ) Unloading Of Galvanized Substation Structures From The Truck , Sorting, Weighing And Proper Stacking In The Store As Per Bom At 220 Kv Badaun Substation Including Cost Of All Labour, T&P, Hydra Etc. ( Bbl : 03 Nos With Approx 500.96 Kg For Each Set, Bct : 03 Nos With Approx 179.26 Kg For Each Set ) 9 ( Iv ) Unloading Of Galvanized Substation Structures From The Truck , Sorting, Weighing And Proper Stacking In The Store As Per Bom At 132 Kv Aonla Substation Including Cost Of All Labour, T&P, Hydra Etc ( Cgr : 01 Nos With Approx 304.76 Kg For Each Set, Alp : 09 Nos With Approx 121.00 Kg For Each Set, Abl : 04 Nos With Approx 341.00 Kg For Each Set ) . 10 2. Dismantling Of Old & Defective 145 Kv Circuit Breakerinstalled At 132 Kv Capacitor Bank In Switchyard Of 220 Kv Badaun Substation ( I ) Dismantling Of Old & Defective 145 Kv Circuit Breaker By Cutting Its Earthing, Opening Of Jumpers, Opening Of Cable Termination Including Shifting Of Of Dismantled Material From From Site To Outside The Open Store With All Men, Materials, T&P Like Grinding / Cutting Machine Etc To Be Arranged By The Contractor At His Own Cost 11 3. Installation And Commissioning Of New 145 Kv Circuit Breaker Installed At 132 Kv Capacitor Bank In Switchyard Of 220 Kv Badaun Substation. Note: This Work Will Be Completed After Modification / Construction Of Foundation By Civil Wing. ( I ) Erection Of New 145 Kv Circuit Breaker With Its Structure In Place Of Old 145 Kv Circuit Breaker On Modified Foundation With The Help Of Skilled Labour, Hydra / Crane Etc To Be Arranged By The Contractor 12 ( Ii ) Jumpering Work Of New Circuit Breaker By Acsr Panther Conductor Including Fixing And Tightening Of Circuit Breaker Clamp With All Associated Work ( Total 06 Nos. Of Jumper ) 13 ( Iii ) Earthing Of New Circuit Breaker By 75X10 / 50X6 Mm Ms Flat With All Associated Works 14 ( Iv ) Laying Of Any Size Control Cable ( 2Cx2.5 Sqmm / 4Cx2.5 Sq Mm / 6Cx2.5 Sq Mm ) In Cable Trenches From Control And Relay Panel In Control Room To Various Equipments, Junction Boxes Etc In Switchyard As Per Cable Schedule Including Shifting Cable In Drums From Storage Place At The Substation To Erection Site And Shifting Back The Balance Cables To Stores At The Substation 15 ( V ) Termination Of Various Sizes Control Cables Already Laid / Newly Laid For 145 Kv Circuit Breaker At Circuit Breaker End, C&R Panel End Including Extension Of Dc Supply From Dcdb , Ac Supply From Acdb To Control Panels And Equpments Including Drilling Of Holes, Providing And Fixing Of Cable Glands, Ferrules And Crimping Type Lugs, Testing And Commissioning Of This Newly Installed Circuit Breaker In Presence Of Commissioning Engineer And T&C Team Etc.
Basic Detail
Tender No T06
Bidding Type Tender
Location
City budaun
State Uttar Pradesh
Key Dates
Publish Date 19 Mar 2024
Submission Date 26 Mar 2024
Open Date 27 Mar 2024
Finance
Tender Value Ref. Documents
Tender Fee 590
EMD 2000
Exemption Not Available
Document List
7abf0ec1-5146-459c-a141-938e79844e85.html
BOQ_1588346.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 19, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 26, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 27, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

7abf0ec1-5146-459c-a141-938e79844e85.html

xls

BOQ_1588346.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders