}

Supply Of De-Centralized Materials And Work For Capacity Enhancement Of 11/0.4 Kv Substation, Installation Of 11/0.4 Kv Substation , Construction And Bifurcation Of 11 Kv Line And Replacement Ofdamaged Cable 33 Kvfor Work In Mirzapur In Availability Of B., mirzapur-Uttar Pradesh

Purvanchal Vidyut Vitaran Nigam Limited has published Supply Of De-Centralized Materials And Work For Capacity Enhancement Of 11/0.4 Kv Substation, Installation Of 11/0.4 Kv Substation , Construction And Bifurcation Of 11 Kv Line And Replacement Ofdamaged Cable 33 Kvfor Work In Mirzapur In Availability Of B.. Submission Date for this Tender is 29-04-2024. Distribution Box Tenders in mirzapur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

42989313
Corrigendum : Supply Of De-Centralized Materials And Work For Capacity Enhancement Of 11/0.4 Kv Substation, Installation Of 11/0.4 Kv Substation , Construction And Bifurcation Of 11 Kv Line And Replacement Ofdamaged Cable 33 Kvfor Work In Mirzapur In Availability Of B.
Open Tender
Indian
Uttar Pradesh
mirzapur
29-04-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Supply Of De-Centralized Materials And Work For Capacity Enhancement Of 11 / 0.4 Kv Substation, Installation Of 11 / 0.4 Kv Substation , Construction And Bifurcation Of 11 Kv Line And Replacement Ofdamaged Cable 33 Kvfor Work In Mirzapur In Availability Of B.P 2024-25 Under Edd-Ii, Mirzapur - 2 Stone Pad 300X300x75 Mm ( Providing By Contractor ) 3 X-Arms Holding Clamps With Bolts & Nuts For St / Pcc Poles. ( Providing By Contractor ) 4 F-Bracket With Bolts & Nuts For St / Pcc Poles ( Providing By Contractor ) 5 Al. Binding Wire ( Providing By Contractor ) 6 M.S Clamp For Top, T-Off Channel With Bolts & Nuts For St / Pcc Poles ( Providing By Contractor ) 7 P.G Clamps For Weasel Conductor 8 Danger Board With Clamp & Bolts For St / Pcc Poles ( Providing By Contractor ) 9 Barbed Wire Gi ( Providing By Contractor ) 10 E-Bracket With Bolts & Nuts ( Providing By Contractor ) 11 160 Mm Od Pn-4 Pe-80 Grade Uv Stabilized Hdpe Pipe As Per Is: 4984 In 6 Meter ( Providing By Contractor ) 12 G.I Pipe 6 Dia ( Providing By Contractor ) 13 Jointer For G.I Pipe 6 Dia ( Providing By Contractor ) 14 All Lugs 70 / 120 Mm2 ( Providing By Contractor ) 15 Extention Bracket ( Providing By Contractor ) 16 Aluminium Paint ( Providing By Contractor ) 17 Bolt, Nut And Washer ( Providing By Contractor ) 18 Red Oxide Paint ( Providing By Contractor ) 19 Lt Clamp With Nut Bolt ( Providing By Contractor ) 20 Lt Shackle Insulator ( Providing By Contractor ) 21 Z Clamp ( Providing By Contractor ) 22 Earth Wire Clamp ( Providing By Contractor ) 23 Nut Bolt For Shackle Insulator ( Providing By Contractor ) 24 Loop Guard Complete 3 Phese ( Providing By Contractor ) 25 Dead End Clamp For Pole / Bracket With Nuts & Bolts ( Providing By Contractor ) 26 I Hook ( For Dead End Clamp ) ( Providing By Contractor ) 27 33 Kv Cable Jointing Kit 3*300 ( Providing By Contractor ) 28 11 Kv Cable Jointing Kit 3*300 / 185 / 120 / 70 ( Providing By Contractor ) 29 Suspension Clam With Nuts & Bolts ( Providing By Contractor ) 30 33 Kv Straighst Through ( Providing By Contractor ) 31 3 Ph Distribution Box ( Providing By Contractor ) 32 I Hook ( For Suspension Clam ) ( Providing By Contractor ) 33 Cartage Of Following Materials From Esc, Mirzapur To Work Site Including Loading & Unloading Charge. 34 St Poles13 Mtr Long / 11 Mtr Long ( Provided By Department ) 35 Pcc Poles 8.5 Mtr Long ( Provided By Department ) 36 Pcc Poles 11 Mtr Long ( Provided By Department ) 37 Pcc Poles 9 Mtr Long ( Provided By Department ) 38 Line Materials With Acsr Weasel Conductor ( Provided By Department ) 39 Line Materials With Dog Conductor ( Provided By Department ) 40 Catrage Of All Line Materials Lt / 11 / 33 Kv And Lt Pvc Cable 41 Abc 3X95+1X70+1X16mm2 ( Provided By Department ) 42 33 Kv 3X300mm2 Xlpe Cable ( Provided By Department ) 43 33 Kv 3X120mm2 Xlpe Cable ( Provided By Department ) 44 11 Kv 3X300mm2 Xlpe Cable ( Provided By Department ) 45 11 Kv 3X185mm2 Xlpe Cable ( Provided By Department ) 46 11 Kv Vcb O / G, 200 / 100 / 5A ( Provided By Department ) 47 Transformer100 Kva, ( Provided By Department ) 48 Transformer63 Kva, ( Provided By Department ) 49 Transformer25 Kva, ( Provided By Department ) 50 Erection 51 Erection Of Single Support St / Pcc Pole For Construction Of 11 Kv / Lt Line Including Digging Of Pit, Fitting Of All Accessories, Back Filling Of Earth & Others Required Work. 52 Grouting Of Pole With 1:4:8 Ratio Of Cement Sand & Brick Ballast As Per Resspo Norms. ( Cement Sand & Brick Ballast Wil Be Supplied By The Constractoron His Own His Own Cost ) 53 Grouting Of Stay Sets Including Digging Of Pit With 1:4:8 Ratio Of Cement Sand & Brick Ballast As Per Resspo Norms, Fixing Binding And Nuzzling Of Stay Wire. ( Cement Sand & Brick Ballast Wil Be Supplied By The Constractor On His Own His Own Cost ) 54 Earthing Of Poles 55 Stringing & Sagging Of 3 Phase 33 / 11 Kv Line Upto Proper Sag Including Laying Of Acsr Weasel / Dog Conductor , Binding With Insulators & Jumpering. 56 Erection Of Ab Cable Size 3X95+1X70+1X16mm2 As Per Resspo Norms. 57 Erection Of Sectional Double Pole Structure Of Pcc / Stpole Including Digging Of Pit, Fitting Of All Accessories, Back Filling Of Earth, Grouting Of Each Pole & Stay Sets As Per Resspo Norms ( Cement Sand & Brick Ballast Wil Be Supplied By The Constractor On His Own His Own Cost ) 58 Erection Ofdouble Pole Structure For Dp Stpolepcc Pole 8.5 Mtrincluding Fitting Of Accessories, 59 Mounting Of 100 Kva Transformer As Per Resspo Norms. 60 Mounting Of 63 Kva Transformer As Per Resspo Norms. 61 Mounting Of 25 Kva Transformer As Per Resspo Norms. 62 Layingof O / H33 Kv 3X300mm2 Xlpe Cable As Per Resspo Norms. 63 Layingof O / H33 Kv 3X120mm2 Xlpe Cable As Per Resspo Norms. 64 Layingof O / H11 Kv 3X300mm2 Xlpe Cable As Per Resspo Norms. 65 Layingof O / H11 Kv 3X185mm2 Xlpe Cable As Per Resspo Norms. 66 Filling Of I / D / O / D 33 Kv Cable Jointing Kit All Size As Per Resspo Norms. 67 Filling Of I / D / O / D 11 Kv Cable Jointing Kit All Size As Per Resspo Norms. 68 Installation Of 11 Kv Vcb Pannel ( O / G ) , 200 / 100 / 5A As Per Resspo Norms. 69 Drilling Under The Railway Track By Hdd Machine For Crossing The 11 Kv Xlpe Cable 70 Laying Of 160 Mm Od Pn-4 Pe-80 Grade Uv Stabilized Hdpe Pipe As Per Is:4984 In 6 Meter With Jointer 71 Laying Charge Of 33 Kv Allsize Cable From D / P To D / P 72 Laying Charge Of 11 Kv Allsize Cable From D / P To D / P 73 Cartage Of Received Back 10 Kva Transformer From Work Site To Esc, Mirzapur Including Loading & Unloading Charge 74 Cartage Of Received Back 25 Kva Transformer From Work Site To Esc, Mirzapur Including Loading & Unloading Charge 75 Cartage Of Received Back 63 Kva Transformer From Work Site To Esc, Mirzapur Including Loading & Unloading Charge

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 28-Mar-2024 Date Extension 1 Date 04-04-2024
2 04-Apr-2024 Date Extension 2 Date 09-04-2024
3 10-Apr-2024 Date Extension 3 Date 18-04-2024
4 19-Apr-2024 Date Extension 5 Date 24-04-2024
5 24-Apr-2024 Date Extension 7 Date 29-04-2024

Key Value

Document Fees
INR 3540 /-
EMD
INR 74800.0 /-
Tender Value
INR 74.76 Lakhs /-

Attachment

FileName File Description File Size
813f8ded-a1c1-4339-bff6-f23619018019.html Tender Notice 0 KB
BOQ_1588211.xls Tender Document 0 KB
TDno.pdf Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail