}

Tender For Electrical Package 1 For Icgs Samudra Paheredar, kolkata-West Bengal

Cochin Shipyard Limited has published Tender For Electrical Package 1 For Icgs Samudra Paheredar. Submission Date for this Tender is 02-04-2024. Electrical Maintenance Tenders in kolkata West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

42988875
Corrigendum : Tender For Electrical Package 1 For Icgs Samudra Paheredar
Open Tender
Indian
West Bengal
kolkata
02-04-2024

Tender Details

Tender For Electrical Package 1 For Icgs Samudra Paheredar--1 Electrical Repair Package Jobs 2 Lub Oil Priming Pump Motors Of All Four Main Das To Be Overhauled. ( Material Contractor Supply ) . 3 Shaft Generator ( 2300 Kw, 415V, 3- Phase ) – 02 Nos, M / S Avkdeutschand, 4 Overhaul Both ( Port &Stbd ) Shaft Generator As Follows:- ( A ) Examination Of Power Cables, Cable Entry, Cable Shoes And Ct On Terminal Box. ( B ) Cleaning &Examination Of Insulators For Cracks. ( C ) Check And Re-Tightening Of All Screws And Nuts In Aux. Terminal Box. ( D ) Check And Re-Tightening Of All Screws And Nuts In Aux. Terminal Box By Dynamometric Key. ( E ) Inspection Of Stator And Rotor Winding With Endoscope.On Completion Of Overhauling Laser Alignment Of Shaft Generators To Be Carried Out With Main Shaft Of Prime Mover. ( All In Way Jobs / Materials And Spares Under Contractor Scope ) 5 Emergency Switch Board ( M / S Rrmi ) 6 Circuitbreakers { ( Make-Merlingerlin, 400Amps } Tobeoverhauledand Safety Trip Checks ( Over Current, Short Circuit & Under Voltage ) To Be Carried Out. ( A ) Record The Bus Bar Insulation. Insulation Should Be >5 Mega Ohm. ( B ) Rubber Beading Of The Panel Doors To Be Renewed. ( Mat Contractor Supply ) Calibration Certificate To Be Provided. 7 Following Meters To Be Calibrated And Calibration Certificate To Be Provided. 8 Ammeter ( 0 – 1000 Amp ) 9 Voltmeter ( 0 – 600 V ) 10 Frequency Meter ( 45 – 55 Hz ) 11 Calibrate All Meters In Both Msb. Calibration Certificate To Be Provided. 12 Meter Description Range Msb ( P ) Qtymsb ( S ) Qty 13 Voltmeter ( 0 – 300 V ) 01 01 14 Voltmeter ( 0 – 600 V ) 04 05 15 Insulation Meter 0 - 8M? 03 03 16 Ammeter ( 0 – 5000 A ) 0303 17 Ammeter ( 0 – 3000 A ) 0706 18 Kw Tmeter ( -150 To 500 Kw ) 0304 19 Kw Tmeter ( -2875 To +2875 Kw ) 01 02 20 Frequency Tmeter ( 44 - 55 Hz ) 04 05 21 Synchroscope…. 0304 22 Pf Meter ( -0.5 To 1 To+0.5 ) 03 04 23 Transformers ( 99Kva-02 No, 40Kva- 01No. ) 415 / 230V, 3-Phase, M / S Marine Electrical 24 Overhaulthetransformers ( 99Kva-02Noswindingstobe Applied With Air Drying Varnish. Post Overhauling, Transformers Are To Be Proved For Satisfactory Operation. 25 Overhaulthetransformers ( 40Kva–01No ) , Windingstobe Applied With Air Drying Varnish. Post Overhauling, Transformers Are To Be Proved For Satisfactory Operation. 26 Shore Connection Box ( 415V, 3-Phase, 800A ) - 02 No., M / S Marine Electricals 27 Overhauling Of 02 No Shore Connection Box And 01 No Shore Bus Bar Panel To Be Carried Out. Job Includes Following;A ) Undertake Cit Of Mccb-800Ab ) Renew Insulator Bushings Of Bus Bar. 28 Calibration Of Following Meters To Be Carried Out And Calibration Certificate To Be Provided. 29 Voltmeter ( 0-500V ) 30 Ammeter ( 0-1000A ) 31 Kwh Meter 32 Phase sequence meter 33 INTERRING STABILIZER –02 NO, M/S RRMI (INPUT 230 V,AC) 34 Following tests to be carried out as per manual :-(a) 04 different tests for check of the stabilizer logic.(b) Arbitrary periods of roll (10, 15, 20 and 30 sec) to be checked for pneumatic valve and stabilizer valves.(c) RS Test for check of Roll sensor to be carried out. 35 INCINERATOR, M/S TEAMTEC, QTY-01 NO 36 Incineratornon-operationalviewsuspecteddefectivePLCandsystemnotgetting switched-on. Incinerator tobeoverhauled. Defect to berectified andsystemto be proved with correct operation of following alarms.List of alarms: -(a) Flue gas temp. High.(b) Combustion chamber temp. high & low(c) Diesel oil temp high &low(d) Door not closed(e) Motor overload(f) Low and high voltage(g) Low sludge pressure(h) Sludge tank temp. high(j) Low level sludge tank(k) Diesel oil press. Low 37 ELECTRIC SIREN M/S ZETFONE 38 Overhauling of electric siren motor (415 V AC, 3-Phase, 50 HZ, 5.5 KW) and control panel to be carried out. System to be proved for satisfactory operation. (Mat & Spares contractor supply) 39 AIR WHISTLE – 01 NO. M/S KOCKUM SONIC 40 Overhauling of air whistle and control panel to be carried out. System to be proved for satisfactory operation. (Mat & Spares contractor supply) 41 FI-FI control panel to be overhauled. Overhauling includes calibration of OLR (3RV 1011-1 DA10, 2.2 A to 3.2 A, Qty-02 Nos and functional checks of Fi-Fi system in remote and fixed operator panel. Calibration certificate to be provided. (All items contractor supply). 42 REMOTE OPERATED SOLENOID VALVE & RELAY PANEL (M/S ROTEX) 43 Pneumatic remote operated solenoid valve relay panel to be overhauled. The overhaulincludeschecking relays&solenoidswithpneumaticvalves. CalibrationofOLR(0.4-0.63A,TR2M,)tobecarriedout.Calibration certificate to be provided. 44 Overhauling of control panel 45 Checking of relays&solenoidswithpneumaticvalves 46 CalibrationofOLR(0.4-0.63A,TR2M) 47 Overhauling of following ventilation fan motors alongwith blowers to be carried out as per instruction mentioned in technical requirement. 48 Name of Motor SpecificationLocation 49 Supply Fan S-2A415 V, 11 KWMER (P) 50 Supply Fan S-2B415 V, 11 KWMER (S) 51 Supply Fan S-3A415 V, 30 KWAER (P) 52 Supply Fan S-3B415 V, 30 KWAER (S) 53 Overhauling of following ventilation fan starter panels to be carried out as per instruction mentioned in technical requirement. Calibration of over load Relay to be carried out. Calibration certificate to be provided.(All items contractor supply) 54 Name of MotorSpecificationLocation OLR Details 55 Supply Fan S-2A415 V, 11 KW MER (P) LRD 22 (16-24A) 56 Supply Fan S-2B415 V, 11 KW MER (S) LRD 22 (16-24A) 57 Supply Fan S-3A415 V, 30 KW AER (P) LR2D33 (48-65A) 58 Supply Fan S-3B415 V, 30 KW AER (S) LR2D33 (48-65A) 59 Following exhaust ventilation fans are defective. Same to be renewed as per sample. In way job includes removal & refitment of paneling and trunking. (Spares and material contractor Supply) 60 FM -200 Room (415V 0.37 KW) 61 Galley (415 V 1.0 KW) 62 12 Sailor washroom (415V 0.37 KW) 63 Overhauling of following motors to be carried out as per instruction mentioned in technical requirement. (Spares contractor Supply) 64 Name of MotorSpecification Make 65 FW LT circulatingpump Motor for DA & 415V,3-Phase, 50 Hz, 15 KW M/s Brook CromptonME ( LT-1,2,3 & 4) 66 FW LT circulating pump motor (Back up)415V,3-Phase, 50 Hz,22 KW M/s MEZ 67 ME & DASW cooling Pump Motor415V,3-Phase, 50 Hz, 15 KW M/s Brook Crompton 68 FollowingStarterPanels(M/sMarineElectricals)tobeoverhauledasperinstruction mentioned in technical requirement. Overloadrelays(16-24Amp)tobecalibratedandCalibration certificate to be provided. 69 Name of Control Panel 70 FW LT Circulating pump Motor (Back up) 71 FW LTcirculatingpump Motor for DA & ME (LT-1,2,3 & 4) 72 ME & DASW cooling Pump Motor 73 Overloadrelays(16-24Amp) 74 GALLEY OVEN-02 NO. M/S DENKI 75 Overhaulingof electricovenstobecarriedout.Overhaulingincludesthe following:-(a)Examine contactors for carbon deposition and pitting.(b)Check Insulation of control transformer, power supply wiring.(c)Renew all heat proof cables of oven terminal to hotplate terminal posts along with porcelain sleeves from terminal post to hot plate terminal.(d) Check and prove function of thermostat. (Mat &Spares contractor supply) 76 HOT PLATE (GALLEY EQUIPMENT) MAKE: M/S DENKI 77 Following defects observed in hot plate range :- 78 Insulation of heat proof cable pertaining to hot plates found low (approx. length : 50 mtr) to be renewed with 06 no. ceramic connectors. 79 Heat proof Single core control cable from JB to main terminal deteriorated. Same to be renewed. (approx. length: 15 mtrs). 80 Renewal of rotary switch 81 300 LTRS HOT WATER CALORIFIER, M/S DENKI QTY - 02 no. (Location- AC Compartment) 82 Undertake the following routines:-(a)De-scale the heater.(b)Test heater, thermostat for proper insulation resistance etc.(c)Fill water, ensure all parts are watertight and leak proof.(d)Overhaul 02 no. control panel.(e)Clean and paint all parts necessary to prevent rusting.(f) Usenewpacking,gasket,washerswhilerefittingtheapparatusplate,pipe connections.(g)Ensure all electrical components are fixed correctly and wiring connections are appropriate as per terminal markings.(h) Renew Earthing strip.(j) Check the insulation resistance of complete unit including control panel before commissioning of Calorifier. 83 Hot water circulating Pump (monoblock) along with motor (415V, 3-phase, 50 Hz, 0.37KW, M/s Garbaino, Italy) to be overhauled as per instruction mentioned in technical requirement.(Bearing No 6201-ZZ/C3). 84 DRYING TUMBLER CONTROL PANEL &MOTOR M/S STEFAB INDUSTRIES LTD, 85 Drying Tumbler Motor (415 V, 3-ph, 1.5 KW, 02 no.) to be overhauled as per instruction mentioned in technical requirement.(Bearing no- 6204 C3) 86 Drying Tumbler Control Panel to be overhauled as per instruction mentioned in technical requirement. Calibration of 02 no. over-load relays (TDR, 18 A – 25 A) to be carried out. Calibration certificate to be provided. (Spares contractor Supply) 87 Washer Extractor Motor (415V, 3-Ph, 7.5 KW) to be overhauled. Check electromagnetic clutchs gap and ensure it is not more than 0.5 mm. Replace V-belt. (Bearing No – 6306 - ZZ & 6208 - ZZ) (Spares contractor supply) 88 LaundryWasherExtractorcontrolpaneltobeoverhauledasperinstruction mentioned in technical reuirement. (Spares contractor Supply) 89 WATER TIGHT SLIDING DOOR (MAKE: GODREJ), QTY-10 NO. 90 Control panel of watertight sliding door to be overhauled and system to be proved for satisfactory operation. 91 WATER MIST SYSTEM (M/s GRUNDFOSS, HUNGARY) 92 Motor (415V, 3-Phase, 5 KW) to be Overhauled as per instruction mentioned in technical requirement. 93 Starter Panel (at ASP) and Control Panel in DCHQ to be overhauled asperper instruction mentioned in technical requirement.InadditiontothiscalibrationofO/Lrelayandactivationof water mist system from all the 07 locations to be proved. 94 FOAM LIQUID TRANSFER PUMP MOTOR (M/S GRUNDFOSS)

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 25-Mar-2024 CORRIGENDUM 1 Date 02-04-2024
2 27-Mar-2024 CORRIGENDUM 2 Other 02-04-2024

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail