Tender For Increasing Capacity Of Sub Station From 1X5 To 2 Plus 5 Mva Of 33 11 Kv Ss Marwatiya Basti- 1 Decentralised Items 2 Control Cable 3 4X2.5 Mm² 4 2X2.5 Mm² 5 Rubber Mat 6 Alluminium P.G. Clamp For Dog 7 24 Volt Battery And Inverter Set 8 Substation Works 9 Shifting, Loading & Carriage Of Following Material From Store Center Siddharthnagar To 33 / 11 Kv S / S Marwatya 10 Shifting, Loading & Carriage From Store Center To Work Site Including Succesfully Loading, Unloading & Proper Stackingof 33 Kv L.A. / 33 Kv Fuse, Post Insulator, Bus Isolator, Top Channel , Structures Etc.Including T&P And Labour. 11 Shifting, Loading & Carriage From Store Center To Work Site Including Succesfully Loading, Unloading & Proper Stackingof33 Kv Transformer Control Pannel, 33 Kv Vcb With Structure, 11 Kv I / C, O / G, Bus Coupler Pannel , C.T.Complete With Structure , Including T&P And Labour. 12 Shifting, Loading & Carriage From Store Center To Work Site Including Succesfully Loading, Unloading & Proper Stackingof 11 Kv 3*300Sqmm And 3*120Sqmm Sqmm Xlpe Cables Including T&P And Labour. 13 Construction Of Plinth & Foundation For New 33 Kv Vcb Structure. 14 Erection & Grouting Of 33 Kv Vcb Structure , 33 Kv La Structure., 33 Kv Fuse Set, Bus Isolator Structure, Post Insulator Structure, 33 Kv Ct Structure. With Structure Including T&P And Labour. 15 Mounting & Fitting Of 33 Kv Vcb & 33 Kv C.T., 33 Kv Bus Isolator On Erected Structure With Complete Fitting, Including T&P And Labour. 16 Mounting & Fitting Of 33 Kv La & 33 Kv Fuse Set, 33 Kv Post Insulator, On Erected Structure With Complete Fitting, Including T&P And Labour. 17 Dismentling Of Existing Security Fencing & Re-Erection After Completion Of Work, Including All T&P And Labour. 18 Making Of New 5Mva Transformer Plinth, Including All T&P, Material And Labour. 19 Shifting / Dragging Of 5 Mva T / F About 50 Mtr. Distance & Placing On Plinth, Erection Of Conservator Tank, Radiators, Silica Gel Box, Air Vent, Filling Of T / F Oil, Removing Of Air Trapped In Transformer, Tightening Of Lv / Hv Bushing, Making Lv / Hv Connections, Including T&P And Labour. 20 Opening Of Gasket And Filling Of Oil Including Reclamation Of Full Transformer By Centrifusing Machine On Site Including All T&P , Material And Labour Incase Of Old & Used Tansformer Received From Store Center In Cluding General Maintenance Work With Supply Ofoti / Wti If Required. 21 Shifting / Removing / Dismantalling Of Old Switchgear Panels To Make Space For New Switchgear Panels, Including All T&P And Labour. 22 Installation Of New 11 Kvincoming Vcb, 11 Kv Outgoing Vcb, 11 Kv Bus Coupler, 33 Kv Transforme Control Panel In Control Room, Including All T&P And Labour. 23 Fabrication Of Neutral Stand And Cable Stand With Ms Items Like Top Channel And Angle Including Cutting, Welding Etc. Complete Work, Including All T&P And Labour. 24 Erection And Grouting Of Neutral Stand And Cable Stand Including All Material, Labour And T&P. 25 Laying Of 11 Kv Cable By Digging Of Trench, Properly Laying Of 11Kv 3*300Sqmm, 3*120Sqmm Cable In It With Bricks And Sand Including Cost Of Brick, Sand, T&P And Labour. 26 Cable Jointing Charges With Cable Jointing Kit. 27 Installation Battery And Invertor With Cabinet In Control Room Along With Its Proper Connections 28 Termination Of 11 Kv Cable With Transformer And 11 Kv Panels, Including, All T&P And Labour. 29 Laying Of 11 Kv Cable In Air With 6 Inch Gi Pipe 30 Laying Of Control Cable Of Size 2*2.5Sqmm 31 Laying Of Control Cable Of Size 4*2.5Sqmm 32 Making Control Cable Drawing, Termination And Making Proper Connections Including Providing Ferrules With Switchgear Equipments From 33 Kv Transformer Control Panel To 33 / 11 Kv Power Transformers Bucholz Relay, Oti, Wti, Etc, 33 Kv Transformer Control Panel To 33 Vcb & 33 Kv C.T., 33 Kv Pts, 11 Kv Vcb Panels, Giving Ac / Dc Supply Including All T&P And Labour. 33 Power Tf 1 No. Delta Neutral Earthing , With Providing ( Gi Pipe 1.5 Inch 20 Mtr Length Of Each Pipe 1 No.Of Copper Cone And 6 Mmsq Copper Wire As Per Req. ) With Coal And Salt, Copper Flexible Mess Including All T&P And Labour. 34 Power Transformer 2 No. Body Earthing , With Providing ( Gi Pipe 1.5 Inchdia 20 Mtr Length Of Each Pipe 1 No.Of Copper Cone And 6 Mmsq Copper Wire As Per Req. ) With Coal And Salt And Welding It With Earthmat Including All T&P And Labour. 35 Making Hv Connection With Acsr Dog Conductor From 33 Kv Bus-Bar To 33 Kv Post Insulator-33 Kv Bus Isolator-33 Kv Fuse Set-33 Kv Vcb-33 Kv Cts-33 Kv La-33 / 11 Kv Power Transformer Appox 8No.Work Including All T&P And Labour As Per Site Requirements. 36 Earthmat Half Of Switchyard Area Including Supply And Fabrication With All T&P And Labour. 37 Earthing Of Indoor And Outdoor Equipments With Existing Earthing Arrangements With Ms Flat 25Mm 38 Providing & Painting Of S / S Structures, Earth Strip & Equipments With Red Oxide, Green And Allumunium Paints. 39 All Other Small Works, Materials & Arrangements Like Allumunium Lugs, Ct Connectors, Clamps, Nut&Bolts, Etc. Required To Complete The Project. 40 Giving Proper Support, Giving Ac Supply And Making Necessary Arrangements For Testing Of Cts, Vbcs, Transformer, After Completion Of Work To Departmental Test Team. 41 33 / 11Kv S / S Bansi Tehsil Siddharth Nagar 42 Decentralised Items 43 Control Cable 44 4X2.5 Mm² 45 2X2.5 Mm² 46 Rubber Mat 47 Alluminium P.G. Clamp For Dog 48 Battery 24 Volt & Invertor 49 Substation Works 50 Shifting, Loading & Carriage Of Following Material From Esc Siddharthnagar To Work Site Of Ss Bansi Tehsil 51 Shifting, Loading & Carriage From Store Center To Work Site Including Succesfully Loading, Unloading & Proper Stackingof 33 Kv L.A , 33 Kv Fuse Set , 33 Kv Bus Isolator , Structures & Top Channeletc.Including T&P And Labour. 52 Shifting, Loading & Carriage From Store Center To Work Site Including Succesfully Loading, Unloading & Proper Stackingof33 Kvcontrol Pannel , 33 Kv Vcbwith Structure, 33 Kv C.Ts., Including T&P And Labour. 53 Shifting, Loading & Carriage From Store Center To Work Site Including Succesfully Loading, Unloading & Proper Stackingof 11 Kv 3*300 Sqmm Xlpe Cables Including T&P And Labour. 54 Dismentling Of Existing Security Fencing , Iron Gate, Piller, Boundry Wall & Re-Erection After Completion Of Work, Including All T&P And Labour. 55 Shifting / Dragging Ofexisting 5 Mva T / F About 50 Mtr. Distance From Plinth, Including Opening Of Jumpers, Earthing, Conservator Tank, Radiator & Emptying Of T / F Oil & Complete Work, Including T&P And Labour. 56 Carriage Of Old Transformer From Work Site To Store Centre, Including Loading At Site And Unloading At Store Center , Including T&P And Labour. 57 Shifting / Dragging Of 10 Mva T / F About 50 Mtr. Distance & Placing On Plinth, Erection Of Conservator Tank, Radiators, Silica Gel Box, Air Vent, Filling Of T / F Oil, Removing Of Air Trapped In Transformer, Tightening Of Lv / Hv Bushing, Making Lv / Hv Connections, Including T&P And Labour. 58 Repairing Old Existing T / F Plinth For New 10 Mva T / F Including All Material , T&P And Labour. 59 Construction Of Plinth & Foundation For New 33 Kv Vcb Structure. 60 Dismentalling Of Old Switchyard Structures To Make Space For New Structures Including All T&P And Labour. 61 Erection & Grouting Of 33 Kv Vcb Structure, 33 Kv Fuse Set Structure Including T&P And Labour. 62 Mounting & Fitting Of 33 Kv Vcb & 33 Kv C.T., 33 Kv Bus Isolator On Erected Structure With Complete Fitting, Including T&P And Labour. 63 Mounting & Fitting Of 33 Kv La & 33 Kv Fuse Set On Erected Structure With Complete Fitting, Including T&P And Labour. 64 Shifting / Removing / Dismantalling Of Old Switchgear Panels To Make Space For New Switchgear Panels, Including All T&P And Labour. 65 Installation Of New 33 Kv Transformer Control Panel In Control Room, Including All T&P And Labour. 66 Fabrication Of Neutral Stand And Cable Stand With Ms Items Like Top Channel And Angle Including Cutting, Welding Etc. Complete Work, Including All T&P And Labour. 67 Erection And Grouting Of Neutral Stand And Cable Stand Including All Material, Labour And T&P. 68 Laying Of 11 Kv Cable By Digging Of Trench, Properly Laying Of 11Kv 3*300Sqmm Cable In It With Bricks And Sand Including Cost Of Brick, Sand, T&P And Labour. 69 Cable Jointing Charges With Cable Jointing Kit. 70 Termination Both Side Of 11 Kv Cable With Transformer And 11 Kv Panels Including, All T&P And Labour. 71 Laying Of Control Cable Of Size 2*2.5Sqmm 72 Laying Of Control Cable Of Size 4*2.5Sqmm 73 Making Interconnection Drawing, Control Cable Termination And Proper Connections Including Providing Ferrules With Switchgear Equipments From 33 Kv Transformer Control Panel To 33 / 11 Kv Power Transformers Bucholz Relay, Oti, Wti, Etc, 33 Kv Transformer Control Panel To 33 Vcb & 33 Kv C.T., 33 Kv Pts, 11 Kv Vcb Panels, 24Volt Battery With Inverter Set Providing, Giving Ac / Dc Supply, Including All T&P And Labour. 74 Power Tf 1 No. Delta Neutral Earthing , With Providing ( Gi Pipe 1.5 Inchdia 60 Feet Length Of Each Pipe 1 No.Of Copper Cone And 6 Mmsq Copper Wire As Per Req. ) With Coal And Salt, Copper Flexible & Earthing Pipe Chamber With Top Cover Sheet & Ness Including All T&P And Labour. 75 Power Transformer 2 No. Body Earthing , With Providing ( Gi Pipe 1.5 Inchdia 60 Feetlength Of Each Pipe 1 No.Of Copper Cone And 6 Mmsq Copper Wire As Per Req. ) With Coal And Salt And Welding It With Earthmat & Earthing Pipe Chamber With Top Cover Sheet & Including All T&P And Labour. 76 Making Hv Connection With Acsr Dog Conductor From 33 Kv Bus-Bar To 33 Kv Post Insulator-33 Kv Bus Isolator-33 Kv Fuse Set-33 Kv Vcb-33 Kv Cts-33 Kv La-33 / 11 Kv Power Transformer, Appox. 08 No.Work Including All T&P And Labour As Per Site Requirements. 77 Earthing Of Indoor And Outdoor Equipments With Existing Earthing Arrangements With Ms Flat Of 25Mm Including All T&P And Labour. 78 Providing & Painting Ofnew S / S Structures, Earthing Flats & Equipments With Red Oxide, Green And Allumunium Paints. 79 All Other Small Works, Materials & Arrangements Like Allumunium Lugs, Ct Connectors, Clamps, Nut&Bolts, Etc. Required To Complete The Project. 80 Giving Proper Support, Providing Ac Connections, Changeover Switch And Making Necessary Arrangements For Testing Of Cts, Vbcs, Transformer, After Completion Of Work To Departmental Test Team. 81 Loading, Unloading & Carraige Chargesfrom Ss To Esc Siddharthnagar For R / B Of 33Kv Scrape Old Steel / Iron Material ( Vcb, Coontrol Pannel, Ct , Structure, Etc. )