|
| 1 | Contract for Electrical Maintenance Jobs |
| 2 | Preventive Maint of Motor =15kW |
| 3 | Preventive Maint of Motor 15kW< to =30KW |
| 4 | Preventive Maint of Motor30kW< to =100KW |
| 5 | Preventive Maint of Motor100kW< to =300kW |
| 6 | PM OF 11KV Motor rating=1000kW |
| 7 | PM OF 11KV Motor rating1000kW |
| 8 | BREAKDOWN Maint Motor rating =15kW |
| 9 | BREAKDOWN Maint Motor rating 15kW< to =30KW |
| 10 | BREAKDOWN Maint Motor rating 30kW< to =100KW |
| 11 | BREAKDOWN Maint Motor rating 100kW< to =300kW |
| 12 | INSTALLATION Motor rating up to =15kW |
| 13 | INSTALLATION Motor rating up to 15kW< to =30KW |
| 14 | INSTALLATION Motor rating up to 30kW< to =100KW |
| 15 | INSTALLATION Motor rating up to 100kW< to =300kW |
| 16 | INSTALLTION/Removal of 11KV motor =1000kw |
| 17 | INSTALLTION/Rem 11KV M 1000kW |
| 18 | Insta/Removal of MVM =500kW |
| 19 | Insta/Removal of MVM 500kW |
| 20 | SHIFTING OF Motor/PNL/EQP. beyond 100 kg |
| 21 | SHIFTING OF Motor/PNL/EQP.Wt.500KG-3MT |
| 22 | SHIFTING OF Motor/PNL/EQP. More than 3MT |
| 23 | MAINTENANCE OF MV(3.3kV) M rating =500kW |
| 24 | MAINTENANCE of 3.3KV M 500kW |
| 25 | Bearing Replacementof Motor=1.5kW |
| 26 | Bearing Rplcmnt of Motor 1.5< to = 7.5kW |
| 27 | Bearing Rplcmnt of Motor 7.5 < to = 30kW |
| 28 | Bearing Rplcmnt of Motor 30 < to = 45kW |
| 29 | Bearing Rplcmnt of Motor 45 < to = 75kW |
| 30 | Bearing Rplcmnt of Motor 75< to = 90kW |
| 31 | Bearing Rplcmnt of Motor 90 < to = 200kW |
| 32 | Bearing replacement of Motor rating 200KW < to = 500kW |
| 33 | Bearing replacement Motor 500kW |
| 34 | Greasing of Motor 30kW < to = 45kW |
| 35 | Greasing of Motor45kW < to = 75kW |
| 36 | Greasing of Motor 75kW < to = 90kW |
| 37 | Greasing of Motor90kW < to = 200kW |
| 38 | GREASING of 3.3 KV MV Motors |
| 39 | GREASING of 11kV Motors |
| 40 | PM of Generator System |
| 41 | PM of Generator Excitation System |
| 42 | PM of Generatorsystem Control Panel |
| 43 | Gen Shaft earth maint & shaft V Msrmnt |
| 44 | Maintenance of Generator LAVT |
| 45 | PM Generator NGT system |
| 46 | Remove,terminate Pwr&Ctrl Cable LT Mtr |
| 47 | Maintenance of 11KV Switchboard panels |
| 48 | Maintenance of 11KV VCB |
| 49 | Maintenance of 3.3KV SWITCHBOARD PANELS |
| 50 | Maintenance of 3.3KV VCB |
| 51 | Maintenance of 415V LT Switchboard |
| 52 | Preventive Maintenance of 415V ACB |
| 53 | Maintenance of 415V power feeder<32A |
| 54 | Maintenance of 415V power F 32A |
| 55 | Maintenance of 415V power F 63A |
| 56 | Maintenance of 415V power F 125A |
| 57 | Maintenance of 415V power F 250A |
| 58 | Maintenance of 415V power F 400A |
| 59 | Erect & Comm of feeder pillar,250 Amps |
| 60 | Erect & Comm of feeder pillar,125 Amps |
| 61 | Erect & Comm of feeder pillar,63 Amps |
| 62 | LT cable laying under ground <21.5MM OD |
| 63 | LT cable LAY under ground 22 to 50MM OD |
| 64 | LT cable LAY under ground 51 to 100MM OD |
| 65 | Cable Laying above Ground<=21.5MM OD |
| 66 | Cable Laying above Ground 22.5To50MM OD |
| 67 | Cable Laying above Ground 51 To 100MM OD |
| 68 | Cable Laying above Ground>100MM OD |
| 69 | Temporary cable laying OD upto 35 MM |
| 70 | Temporary cable laying OD > 35 MM- 55 MM |
| 71 | Temporary cable laying OD >55 MM - 75 MM |
| 72 | Temporary cable laying OD > 75 MM |
| 73 | Fabric &Erect CableTrayLaying>100To150 MM |
| 74 | Fabric&Erect CableTrayLaying 150MM-250MM |
| 75 | Fabric&Erect CableTrayLaying>250MM- 450MM |
| 76 | Fabric&Erect CableTrayLaying Upto 100MM |
| 77 | Fabric&Erect CableTrayLaying >450MM- 600MM |
| 78 | Fabric&Erect CableTrayLaying >600MM-750MM |
| 79 | Fabric&Erect LAD Tray Bend >600UPTO750MM |
| 80 | Fabric&Erect LAD Tray Bend >450UPTO600MM |
| 81 | Fabric&Erect LAD Tray Bend >150UPTO250MM |
| 82 | Fabric&Erect LAD Tray Bend>100UPTO150MM |
| 83 | Fabric&Erect LAD Tray Bend>750UPTO100MM |
| 84 | Fabric&Erect LAD Tray Bend UPTO 75MM |
| 85 | Excavation of earth for cable laying |
| 86 | BACK FILLING EXCAVATED EARTH |
| 87 | PVC/HDPE Pipe Laying cable<=75MM DIA |
| 88 | PVC/HDPE Pipe Laying cable>75To150MM DIA |
| 89 | PVC/HDPE Pipe Layingcable >150MM DIA |
| 90 | 50 mm dia GI Pipe Laying |
| 91 | 100 mm dia GI Pipe Laying |
| 92 | 150 mm dia GI Pipe Laying |
| 93 | INSTA LT&HT cable route marker MS Channe |
| 94 | End Termination AL 3 X 4 Sqmm |
| 95 | End Termination AL 3 X 6 Sqmm |
| 96 | End Termination AL 3 x 10 sqmm |
| 97 | End Termination AL 3 x 16 sqmm |
| 98 | End Termination AL 3 x 25 sqmm |
| 99 | End Termination AL 3 x 35 sqmm |
| 100 | End Termination AL 3 x 50 sqmm |
| 101 | End Termination AL 3 x 70 sqmm |
| 102 | End Termination AL 3 x 95 sqmm |
| 103 | End Termination AL 3 x 120 sqmm |
| 104 | End Termination AL 3 x 150 sqmm |
| 105 | End Termination AL 3 x 185 sqmm |
| 106 | End Termination AL 3 x 225 sqmm |
| 107 | End Termination AL 3 x 240 sqmm |
| 108 | End Termination AL 3 x 300 sqmm |
| 109 | End Termination AL 3 x 400 sqmm |
| 110 | End Termination AL 4 X 4 Sqmm |
| 111 | End Termination AL 4 X 6 Sqmm |
| 112 | End Termination AL 4 x 10 sqmm |
| 113 | End Termination AL 4 x 16 sqmm |
| 114 | End Termination AL 4 x 25 sqmm |
| 115 | End Termination AL 4 x 35 sqmm |
| 116 | End Termination AL 4 x 50 sqmm |
| 117 | End Termination Cu 3 x 2.5 sqmm cables |
| 118 | End Termination Cu 5 x 2.5 sqmm cables |
| 119 | End Termination Cu 7 x 2.5 sqmm cables |
| 120 | End Termination Cu 10 x 2.5 sqmm cables |
| 121 | End Termination Cu 12 x 2.5 sqmm cable |
| 122 | End Termination Cu14 x 2.5 sqmm cables |
| 123 | End Termination Cu 16 x 2.5 sqmm cables |
| 124 | End Termination Cu 19 x 2.5 sqmm cables |
| 125 | End Termination Cu 3-1/2 x 25 sqmm cable |
| 126 | End Termination Cu 3-1/2 x 35 sqmm cable |
| 127 | End Termination Cu 3-1/2 x 50 sqmm cable |
| 128 | End Termination Cu 3-1/2 x 70 sqmm cable |
| 129 | LT Straight through joint3/3.5/4x35 sqmm |
| 130 | LT Straight through joint3/3.5/4x50 sqmm |
| 131 | LT Straight through joint3/3.5/4x70 sqmm |
| 132 | LT Straight through joint3/3.5 /4x95sqmm |
| 133 | LT Straight through joint3/3.5/4x120sqmm |
| 134 | LT Straight through joint3/3.5/4x150sqmm |
| 135 | LT Straight through joint3/3.5/4x185sqmm |
| 136 | LT Straight through joint3/3.5/4x225sqmm |
| 137 | LT Straight through joint3/3.5/4x240sqmm |
| 138 | LT Straight through joint3/3.5/4x300sqmm |
| 139 | LT Straight through joint3/3.5/4x400sqmm |
| 140 | 11KV HT Straight through joint3x185 sqmm |
| 141 | 11KV HT Straight through joint3x240 sqmm |
| 142 | 11KV HT Straight through joint3x300 sqmm |
| 143 | 11KV HT Straight through joint1x500 sqmm |
| 144 | 3.3KV HT Straight through joint3x185sqmm |
| 145 | 3.3KV HT Straight through joint3x240sqmm |
| 146 | 3.3KV HT Straight through joint3x300sqmm |
| 147 | 11KV HT End Termination 3x150 sqmm |
| 148 | 11KV HT End Termination 3x185 sqmm |
| 149 | 11KV HT End Termination 3x240 sqmm |
| 150 | 11KV HT End Termination 1x500 sqmm |
| 151 | 11KV HT straight through 3 x150 sqmm |
| 152 | 11KV HT straight through 3 x185 sqmm |
| 153 | 11KV HT straight through 3 x240 sqmm |
| 154 | 11KV HT straight through 3 x 300 sqmm |
| 155 | 11KV HT straight through 1 x 500 sqmm |
| 156 | 3.3KV HT straight through 3 x 150 sqmm |
| 157 | 3.3KV HT straight through 3 x 185 sqmm |
| 158 | 3.3KV HT straight through 3 x 240 sqmm |
| 159 | 3.3KV HT straight through 3 x 300 sqmm |
| 160 | 11KV HT End termination 3 x 150 sqmm |
| 161 | 11KV HT End termination 3 x 185 sqmm |
| 162 | 11KV HT End termination 3 x 240 sqmm |
| 163 | 11KV HT End termination 3 x 300 sqmm |
| 164 | 11KV HT End termination 1 x 500 sqmm |
| 165 | CT/PT replacement in 11KV HT Switchboard |
| 166 | CT/PT replacement in 3.KV MV Switchboard |
| 167 | CT/PT replacement in 415V LT Switchboard |
| 168 | Providing earthing with GI strip75X10 MM |
| 169 | Providing earthing with GI strip 75 X5MM |
| 170 | Providing earthing with GI strip 50 X6MM |
| 171 | Providing earthing with GI strip 40X 5MM |
| 172 | Providing earthing with GI strip 25 X5MM |
| 173 | Remove & terminate pwr & ctrl HT cable |
| 174 | Earthing 50 X 5 MM COPPER STRIP |
| 175 | 6 SWG Earthingwithbare GIwire |
| 176 | 8 SWG Earthingwithbare GIwire |
| 177 | 10 SWG Earthingwithbare GIwire |
| 178 | 6 MM EarthingwithGIwirerope |
| 179 | 10 MM EarthingwithGIwirerope |
| 180 | Earthing strt light poles withGI pipe |
| 181 | 64 kg charcoal and 5 kg salt |
| 182 | Earth Pit value checking |
| 183 | Maintenance of Earth Pit |
| 184 | Installation OF Earth Pits AS PER IS3043 |
| 185 | Tightness Clmp,Jmpr,strctr,bolts syrd |
| 186 | Replacement CT/PT/ LA/ BPI/ syrd |
| 187 | Replacement of Breaker pole |
| 188 | PM of Relay Pnl/Mtrng Pnl/RTCCSyd |
| 189 | Maintenance of OLTC of Transformer |
| 190 | Lighting arrester maint. 132KV syrd |
| 191 | FILTRATION OF TRANSFORMER OIL: |
| 192 | Attend oil leak/filling/Filter TRF oil |
| 193 | PM/Replace buch/prv/mog/osr/temp gugTRF |
| 194 | Breather maint/replacement of TRF |
| 195 | maint. of Transformer |
| 196 | PM of Lighting transformer |
| 197 | PM Ele Hoist/Crane upto 3Ton |
| 198 | PM Ele Hoist/Crane upto 3#10Ton |
| 199 | PM Ele Hoist/Crane upto 10#15Ton |
| 200 | PM Ele Hoist/Crane upto 30Ton and above |
| 201 | PM of Distribution Board 115/240V ACDB |
| 202 | PM of Distribution Board 220V DCDB |
| 203 | PM of Distribution Board 415V MLDB |
| 204 | PM of feeder piller Box |
| 205 | PM of welding receptacle |
| 206 | Laying & Termination Telephone CAB-05P |
| 207 | Laying & Termination Telephone CAB-20P |
| 208 | Telephone installation/Remo with its LAN |
| 209 | FO cable laying |
| 210 | FO cable laying termination/Splicing/Testing |
| 211 | LHS cable Laying for Fire Systems |
| 212 | Capacitor bank/APFC Pnl Maintenance |
| 213 | PM of Variable frequency drive |
| 214 | Temp Conn.Hydrojetting M/C upto 200KW |
| 215 | Monsoon Prot LCS/Gearbox/O/L>20- 63Amps |
| 216 | Moonsoon Protn-Exd type power socket |
| 217 | Monsoon Protn-Exd type Light DB |
| 218 | Monsoon protection light JB |
| 219 | Monsoon protection Indust.Light DB |
| 220 | Monsoon protection indust.power socket |
| 221 | CHECK & RECTI.OF LIGHT CIRCUIT NON-HAZ |
| 222 | Check & Recti. of light circuit HAz-Area |
| 223 | Replace of LED/GLS/Floodlight/lamp/Fixtu |
| 224 | Replace LED/DC/GLSlamps Upto100W Fitting |
| 225 | Replace of 20/36/40/80W LED/fluor Tubes |
| 226 | Install LED/HPMV/HPSV/MS/LPS light fixt. |
| 227 | Install of High/M bay LED/Flu T-fixture |
| 228 | Repl of Cond/Starter/High/Medi bay fixture |
| 229 | Removal of high/medium bay fixture |
| 230 | Replacement of Choke/Ballast/Tube fixtur |
| 231 | Replacement of CeilingFan Pin/RubberBush |
| 232 | Repl of starter holder/lamp holder |
| 233 | Repl of protective cover for fittings |
| 234 | Replacement of Toggle switch |
| 235 | Repl of wiring of light/Point upto 6SQMM |
| 236 | Install of ELCB/MCB with connection |
| 237 | Removal of ELCB/MCB with connection |
| 238 | Install of timer/Selector switch conn |
| 239 | Wiring using CSNG&CPNG/RIGID PVC CNDT |
| 240 | Install of flexi conduit PVC all size |
| 241 | Wiring using metallic CNDT |
| 242 | Removal of casing capping/Rigid conduit |
| 243 | Removal of Timer/Selector switch etc |
| 244 | Removal of ceiling fancomplte & wire |
| 245 | Removal of High Bay Fixture |
| 246 | Removal of Lighting Fixtures |
| 247 | Installation of Tube Light Fixture |
| 248 | Removal of Exhaust fan with Wall Opening |
| 249 | Removal of Air circulator |
| 250 | Replace/Installation of MCB box |
| 251 | Removal of ceiling/wall mounted Fan |
| 252 | Concealed wiring with 2.5SQMM PVC wire |
| 253 | Installation of ceiling/wall mount fan |
| 254 | Installation of air circulator |
| 255 | Install of Exhaust fan with wall opening |
| 256 | Relpace/Install of 5/6A Swit/Sock/Plug |
| 257 | Replace/Install of 16/32/63A Swit/sock/P |
| 258 | Replacement/Installation of timers |
| 259 | Installation of 1Ph energy Meter |
| 260 | Install & Wiring of 1-Ph voltage stabili |
| 261 | Installation of 3-Ph energy Meter |
| 262 | Install of 3PH-E switch/welding socket |
| 263 | Replace of TPN isolator Non-MCB,125Amps |
| 264 | Replace of TPN isolator Non-MCB,63Amps |
| 265 | Replacement of TPN isolator MCB type |
| 266 | Installation of Power distribution board |
| 267 | Install of Rod/Spike lighting conductor |
| 268 | Install of Ind.Typ Push button STN-NFLP |
| 269 | Install of Ind.Typ Push button STN-FLP |
| 270 | Replac of TPN isolator Non-MCB,250 Amps |
| 271 | Replac of TPN isolator Non-MCB,400 Amps |
| 272 | Replac of TPN isolator Non-MCB,630 Amps |
| 273 | REM of Indust.Typ Push button STN-FLP |
| 274 | REM of Indust.Typ Push button STN-NFLP |
| 275 | INST.INT JNBox>400x400&<600x600 MM NFP/FP |
| 276 | INST.INTJNBox>200x200& <400x400MM NFP/FP |
| 277 | INST interm JN Box<=200x200MM NFP/FP |
| 278 | PM of FLP TPN welding socket upto 63Amps |
| 279 | PM of NFLP TPN welding socket upto 63Amp |
| 280 | INSTALLATION OF MCP |
| 281 | INST NEW 3/6KEY LOUDOPH POINTS |
| 282 | INST.SMOKE/HEAT DETECTOR ON CEILING |
| 283 | TESTING OF MCPS FOR HEALTHINESS |
| 284 | INST OF LOCAL CONTROL STATION |
| 285 | ARTISTIC LETTER/PAINTING |
| 286 | letter writing:single letter of 1in size |
| 287 | letter writing:single letter of 2in size |
| 288 | letter writing:single letter of 3in size |