| 1 | Electrical Items : |
| 2 | Earth wire clamp with N&B |
| 3 | STAY CLAMP FOR SP-21 WITH NUT & BOLT |
| 4 | SUSPENSION CLAMP EYE HOOK LT ABC CABLE |
| 5 | PP & CLAMP FOR SP-23 WITHOUT NUT & BOLT |
| 6 | Piercing Connector 35 Sq.mm-35Sq.mm |
| 7 | Connecting Cable XLPE AL. 1x35 sq. mm. |
| 8 | LT AB Cable 3x35+1x25 sqmm |
| 9 | LT DISTRIBUTION BOX 1 PHASE |
| 10 | Aluminium lug 25 sq. mm |
| 11 | LABOUR (SERVICE) |
| 12 | ERECTION OF EARTHING ROD |
| 13 | FABRICATION OF STEEL |
| 14 | EXCAVATION OF PIT FOR STAY SET |
| 15 | ERECTION OF LT STAY SET |
| 16 | ERECTION OF 11 KV STAY SET |
| 17 | GROUTING OF STAY SET |
| 18 | EXCAVATION OF PIT FOR POLE |
| 19 | ERECTION OF SINGLE SP-21 POLE |
| 20 | ERECTION OF SINGLE SP-23 POLE |
| 21 | GROUTING OF POLE |
| 22 | MUFFING OF POLE |
| 23 | DISMANTLING OF LT LINE 1 P 2 W(WEASEL) |
| 24 | DISMANTLING OF 16 KVA DTR |
| 25 | INST. OF 25 KVA DTR ON POLE STRUCTURE |
| 26 | FIXING OF FUSE SET |
| 27 | FIXING OF LT FUSE SET |
| 28 | LAYING OF RABBIT CONDUCTOR IN HT LINE |
| 29 | CARTAGESP-21/23 POLE, 150-200KM |
| 30 | CARTAGE OF PETTY MATERIAL,150-200KM |
| 31 | CARTAGE OF 16/25 KVA DTR, 100-150KM |
| 32 | CARTAGE OF 16/25 KVA DTR, 150-200KM |
| 33 | HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM) |
| 34 | HEADLOAD CARTAGE OF MATERIAL(1-3 KM) |
| 35 | HEADLOAD CARTAGE OF 16 KVA DTR(1-3 KM) |
| 36 | HEADLOAD CARTAGE OF 25 KVA DTR(1-3 KM) |
| 37 | LAYING OF LT AB CABLE 3X35+1X25 SQMM |
| 38 | Installation of LT DB 1 Ph for LT AB |