|
| 1 | Fixing wood work in frames of false ceiling, partitions etc. sawn and fixed in position :Budloo/Fir Wood (in the shape of truss) |
| 2 | Providing & Fixing wood work in frames of false ceiling, partitions etc. sawn and fixed in position :Budloo/Fir Wood (in the shape of truss) |
| 3 | Erection of the frame structure of BSNL and labour shed, Shoe rack shed, Cloak room shed using steel members, steel pipes and wooden struts etc and carriage of material from SASB store to site of erection before Yatra and dismantling of the same and safe storage after conclusion of Yatra |
| 4 | Fixing corrugated G.S sheet roofing including vertical curved surface fixed with J or L hooks, bolts or self driven screws, nails etc excluding the cost of purlins, rafters and trusses and including cutting to size and shape where ever required. |
| 5 | Engagement of labour for making rackswith materials available in store. Carpenter |
| 6 | Engagement of labour for making rackswith materials available in store. Helper |
| 7 | Providing and fixing of 4mm aluminium composite panel / teak ply of approved brand & Manufacture |
| 8 | Fixing teak wood/hard board for ceiling, partition door and window etc and wall lining of Huts etc complete fixed with required nails and washers etc. |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 10 | Providing and laying vitrified floors in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS:15622 of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1cement :4 coarse sand) including grouting the joints with white cement and matching pigments etc. complete |
| 11 | Dismantling roofing including ridges, hips, valleys and gutters etc and stacking material within 50 meter lead of G.S. sheet. |
| 12 | Dismantling wood work in frames, trusses, purlins and rafters upto 10 m span and 5 meter height includingstacking material within 50 meter lead of sectional area above40 sqcm. |
| 13 | Dismantling wooden boardings in lining of walls and partitions, excluding supporting members but including stacking within 50 meters lead :Thickness above 10 mm upto 25 mm |
| 14 | Carriage of material by head load from Dumail to Holy Cave |
| 15 | Carriage of material by head load from Dumail to Holy Cave |
| 16 | Carriage of sand and bajri by head lead for an avg. lead of6 Kms . |