Public Health Engineering Department-PHED has published Tender For Work Of Repair And Rewinding Of Mono-Block/Centrifugal Pump Set Under Sub Division Degana. Submission Date for this Tender is 27-03-2024. Electrical Maintenance Tenders in merta Rajasthan. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Rewinding of three phase squirrel cage induction motor ofMonoblock pump sets including all necessary material and of the same characteristics as original with required size of super enameled copper wire (including cost of copper wire),"E" class insulation material and testing of motor on no load but to be guaranteed against testing on load at site, including transportation of motor pump to and from Div/AEn/JEn store complete as per direction of engineer in charge. |
2 | 3 H.P. |
3 | 5 H.P. |
4 | 7.5 HP |
5 | 10.00 HP |
6 | 12.5 HP |
7 | 15.00 HP |
8 | 17.50 HP |
9 | 20.00 HP |
10 | SUPPLY & FIXING OF SPARE PARTS (MOTOR + PUMP) |
11 | Connection Plates |
12 | up to 10 HP |
13 | 10 HP to 20 HP |
14 | Cooling Fan |
15 | up to 10 HP |
16 | 10 HP to 20 HP |
17 | GM/SS bush |
18 | Upto 10 HP |
19 | 10 HP to 20 HP |
20 | Mechanical reconditioning of Bearing sheet |
21 | Upto 10 HP |
22 | 10 HP to 20 HP |
23 | Mechanical reconditioning ofImpeller sheet and Key way slot |
24 | Upto 10 HP |
25 | 10 HP to 20 HP |
26 | Oil seal |
27 | Upto 10 HP |
28 | 10 HP to 20 HP |
29 | Labour charge for opening and fitting of pump sets |
30 | Upto 10 HP |
31 | 10 HP to 20 HP |
32 | Rewinding of three phase squirrel cage induction motor of HSC pump sets including all necessary material and of the same characteristics as original with required size of super enamelled copper wire (including cost of copper wire) "E" class insulation material and testing of motor on no load but to be guaranteed against testing on load at site, including making electric connection at site of installation of motor with starter, alignment with pump setsand transportation to and fro from installation site complete as per direction of engineer in charge at site. |
33 | Above 15.00 HP but upto 17.50 HP |
34 | Above 17.50 HP but upto 20.00 HP |
35 | Above 20.00 HP but upto 25.00 HP |
36 | Above 25.00 HP but upto 30.00 HP |
37 | Above 30.00 HP but upto 35.00 HP |
38 | Above 35.00HP but upto 40.00 HP |
39 | Above 40.00 HP but upto 45.00 HP |
40 | Above 45.00 HP but upto 50.00 HP |
41 | Above 50.00 HP but upto 60.00 HP |
42 | Above 60.00 HP but upto 75.00 HP |
43 | Above 75.00 HP but upto 100.00 HP |
44 | Above 100.00 HP but upto 125.00 HP |
45 | Above 125.00 HP but upto 150.00 HP |
46 | Above 150.00 HP but upto 175.00 HP |
47 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) |
48 | Connection Plates |
49 | 5 HP to 20 HP |
50 | 20 HP to 30 HP |
51 | 30 HP to 50 HP |
52 | Above 50 HP to 100 HP |
53 | Above 100 HP to 150 HP |
54 | Above 150 HP to 175 HP |
55 | Cooling Fan |
56 | 5 HP to 20 HP |
57 | 20 HP to 30 HP |
58 | 30 HP to 50 HP |
59 | Above 50 HP to 100 HP |
60 | Above 100 HP to 150 HP |
61 | Above 150 HP to 175 HP |
62 | Fan Cover |
63 | 5 HP to 20 HP |
64 | 20 HP to 30 HP |
65 | 30 HP to 50 HP |
66 | Above 50 HP to 100 HP |
67 | Above 100 HP to 150 HP |
68 | Above 150 HP to 175 HP |
69 | G.M./SS Gland Guide Bush |
70 | 5 HP to 20 HP |
71 | 20 HP to 30 HP |
72 | 30 HP to 50 HP |
73 | Above 50 HP to 100 HP |
74 | Above 100 HP to 150 HP |
75 | Above 150 HP to 175 HP |
76 | Shaft with Sleeve Chuck Nut |
77 | 5 HP to 20 HP |
78 | 20 HP to 30 HP |
79 | 30 HP to 50 HP |
80 | Above 50 HP to 100 HP |
81 | Above 100 HP to 150 HP |
82 | Above 150 HP to 175 HP |
83 | Shaft Chuck Nut |
84 | 5 HP to 20 HP |
85 | 20 HP to 30 HP |
86 | 30 HP to 50 HP |
87 | Above 50 HP to 100 HP |
88 | Above 100 HP to 150 HP |
89 | Above 150 HP to 175 HP |
90 | G.M. Neck Ring |
91 | 5 HP to 20 HP |
92 | 20 HP to 30 HP |
93 | 30 HP to 50 HP |
94 | Above 50 HP to 100 HP |
95 | Above 100 HP to 150 HP |
96 | Above 150 HP to 175 HP |
97 | Bush Shaft Sleeve of G.M. |
98 | 5 HP to 20 HP |
99 | 20 HP to 30 HP |
100 | 30 HP to 50 HP |
101 | Above 50 HP to 100 HP |
102 | Above 100 HP to 150 HP |
103 | Above 150 HP to 175 HP |
104 | G.M. Gland Cover |
105 | 5 HP to 20 HP |
106 | 20 HP to 30 HP |
107 | 30 HP to 50 HP |
108 | Above 50 HP to 100 HP |
109 | Above 100 HP to 150 HP |
110 | Above 150 HP to 175 HP |
111 | S.S. Shaft (Non Magnetic) |
112 | 5 HP to 20 HP |
113 | 20 HP to 30 HP |
114 | 30 HP to 50 HP |
115 | Above 50 HP to 100 HP |
116 | Above 100 HP to 150 HP |
117 | Above 150 HP to 175 HP |
118 | G.M. Shaft Sleeve Check Nut |
119 | 5 HP to 20 HP |
120 | 20 HP to 30 HP |
121 | 30 HP to 50 HP |
122 | Above 50 HP to 100 HP |
123 | Above 100 HP to 150 HP |
124 | Above 150 HP to 175 HP |
125 | M.S. Shaft Check Nut |
126 | 5 HP to 20 HP |
127 | 20 HP to 30 HP |
128 | 30 HP to 50 HP |
129 | Above 50 HP to 100 HP |
130 | Above 100 HP to 150 HP |
131 | Above 150 HP to 175 HP |
132 | Cooling pipe set with nozzle & Nut |
133 | 5 HP to 20 HP |
134 | 20 HP to 30 HP |
135 | 30 HP to 50 HP |
136 | Above 50 HP to 100 HP |
137 | Above 100 HP to 150 HP |
138 | Above 150 HP to 175 HP |
139 | AIR Cock |
140 | 5 HP to 20 HP |
141 | 20 HP to 30 HP |
142 | 30 HP to 50 HP |
143 | Above 50 HP to 100 HP |
144 | Above 100 HP to 150 HP |
145 | Above 150 HP to 175 HP |
146 | JOB WORK FOR REPAIR OF PUMP MOTOR |
147 | Bearing Housing (rebuilding, turning & finishing) |
148 | 5 HP to 20 HP |
149 | 20 HP to 30 HP |
150 | 30 HP to 50 HP |
151 | Above 50 HP to 100 HP |
152 | Above 100 HP to 150 HP |
153 | Above 150 HP to 175 HP |
154 | Bearing Cap (rebuilding, turning & finishing) |
155 | 5 HP to 20 HP |
156 | 20 HP to 30 HP |
157 | 30 HP to 50 HP |
158 | Above 50 HP to 100 HP |
159 | Above 100 HP to 150 HP |
160 | Above 150 HP to 175 HP |
161 | Impeller Reconditioning for all type of Pump |
162 | 5 HP to 20 HP |
163 | 20 HP to 30 HP |
164 | 30 HP to 50 HP |
165 | Above 50 HP to 100 HP |
166 | Above 100 HP to 150 HP |
167 | Above 150 HP to 175 HP |
168 | Labour Charges for Dismantling & Assembling of Pump |
169 | 5 HP to 20 HP |
170 | 20 HP to 30 HP |
171 | 30 HP to 50 HP |
172 | Above 50 HP to 100 HP |
173 | Above 100 HP to 150 HP |
174 | Above 150 HP to 175 HP |
175 | Coupling with stud and rubber bush |
176 | 5 HP to 20 HP |
177 | 20 HP to 30 HP |
178 | 30 HP to 50 HP |
179 | Above 50 HP to 100 HP |
180 | Above 100 HP to 150 HP |
181 | Above 150 HP to 175 HP |
182 | Supply & Fixing of tyre coupling sets according torelevant IS code in Centrifugal couple pump sets of approved make Unit. This job also included re-alignment of centrifugal couple pump set after fixing of tyre coupling set as per directed by Engineer-in charge. |
183 | Type 14 Nos. set |
184 | Type 15 Nos. set |
185 | Type 16 Nos. set |
186 | Type 17 Nos. set |
187 | Supply and fixing Ball bearing of Various size for centrifugal/monoblock pump set of ISI Mark as per specification and approved make by EIC. |
188 | 6304 or equivalent size |
189 | 6305 or equivalent size |
190 | 6306 or equivalent size |
191 | 6307 or equivalent size |
192 | 6308 or equivalent size |
193 | 6309 or equivalent size |
194 | 6310 or equivalent size |
195 | 6311 or equivalent size |
196 | 6312 or equivalent size |
197 | 6316 or equivalent size |
198 | 6317 or equivalent size |
199 | 6318 or equivalent size |
200 | 6319 or equivalent size |
201 | NU319C or equivalent size |
202 | Suuplying of super enamal copper wire suitable for rewindind of induction motor (only procured for motor rewinding) |
203 | Preventive Maintenance |
204 | Routine maintenance of centrifugal coupled pump and motorincluding opening, cleaning, greasing and refitting / changing of ball bearing if required, gland refilling and replacing all rusted studs, replacing rubber bushes & coupling nut & bolts for coupling pulley, tightening all nut & bolts of foundation, baseplate, pump & motor etc. Checking & correcting alignment of pump & motor including necessary materials i.e. grease, nut & bolts, studs, washers, gland packing and rubber bushes etc. work done at site complete job |
205 | 5 HPto 20 HP |
206 | 20 HPto 30 HP |
207 | Above 30 HP and up to 50 HP |
208 | Above 50 HP and up to 100 HP |
209 | Above 100 HP and up to 150 HP |
210 | Above 150 HP and up to 175 HP |
211 | Cleaning of pump house by air blower/ vacuum cleaner or other means including removing of JALA from ceiling and walls etc. complete Job. |
212 | Cleaning of Electric PanelPMCC by air blower/vacuum cleaner or other means including tightening of loose connections etc. complete job. |
213 | Replacing of damaged/broken gland packing plate with new gland packing plate suitable for centrifugal pump shafts and nut&bolts etc. complete job. |
214 | 5 HP to 20 HP |
215 | Above 20 HP and up to 30 HP |
216 | Above 30 HP and up to 50 HP |
217 | Above 50 HP and up to 100 HP |
218 | Above 100 HP and up to 150 HP |
219 | Above 150 HP and up to 175 HP |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy