Various Distributions Under Business Plan 2024-25 ( Summer Plan ) In The Working Area Of 33 / 11 Kv Substation Rewadi, Kalaam And Oil Under The Area Of Electricity Distribution Section-Mitauli, Lakhimpur Work To Be Done In Anticipation Of Receiving Financial Approval For Increasing The Capacity Of Transformers.- 1 Loading, Carriage & Unloading Of 250Kva New Tf From Centre Storeto Work Site At Atkohna, Village Bagiya Tola Oel, Village Belwa Form, Village Bel And Village Chimni With Its Stacking. Dismounting & Carriage Of Old Tf Of 100Kva From Site To Dtc Centre And Proper Connection At Ht / Lt Of New T / F And Successfully Energization Under Work Area Ofsub Division Oelunder Edd-Mitauli. 2 Construction New Plinth Of 250 Kva Distribution Transformer Of Size 5X5x4 Fit With First Class Bricks, Cement And Coarse Sand As Per Respo Norms Alongwith Cost Of Materials. To Work Site Atkohna, Village Bagiya Tola Oel, Village Belwa Form, Village Bel And Village Chimni Work Area Ofsub Division Oelunder Edd-Mitauli. 3 Construction New Fencing Of 250Kva Distribution Transformers Installed At Atkohna, Village Bagiya Tola Oel, Village Belwa Form, Village Bel And Village Chimni Work Area Ofsub Division Oelunder Edd-Mitauli. By Ms Sqaremesh Fabricated On Ms Angles Of Size 50X50x6mm And Ms Striphaving Overall Dimension Complete With One No Gate With Provision Of Hinges Roller & Lacking Arrangement Properly Grouted And Painted With One Coat Of Red Oxide Primer And Two Coasts Of Bus Green Super Enamel Paint. 4 Loading, Carriage & Unloading Of 63Kva New Tf From Centre Storeto Work Site Bednapur, Village Panyora, Village Piparacheet, Village Duha, Village Iqbalpur, Village Bhagautipur And Village Madrahi With Its Stacking. Dismounting & Carriage Of Old Tf Of 25Kva From Site To Dtc Centre And Proper Connection At Ht / Lt Of New T / F And Successfully Energization Underwork Area Sub Division Oel Under Edd-Mitauli. 5 Holding Clamp For Pcc Pole 8.5 Mtr. 6 Loading, Carriage & Unloading Of 25Kva New Tf From Centre Storeto Work Site Vill Daudpur Ganv, Vill Basaigapur Ganv, Vill Lodhaura, Musepur Markhapur, Markhapur, Vill Jhasiya, Vill Ambarsot, Vill Daudpur, Village Sadinama, Village Surat Sari, Village Kushbhariya, Village Lilakunwa Andvillage Ramuwapur Road With Its Stacking. Dismounting & Carriage Of Old Tf Of 16Kva From Site To Dtc Centre And Proper Connection At Ht / Lt Of New T / F And Successfully Energization Underwork Area Sub Division Oel Under Edd-Mitauli. 7 Holding Clamp For Pcc Pole 8.5 Mtr. 8 Proper Grauting Of Stay 9 Supply Of Nut & Bolt 10 Stay Loop Insulator 11 Grouting Of Pcc / Stp Pole With All Accessories As Per Respo Norms. 12 Supply Of Stay Clamp 13 Loading, Carriage & Unloading Of 25Kva New Tf From Centre Storeto Work Site Mallabehad, Musepur Kala, Mahediya, Pahar Kha Purwa, Laluapur, Takiya, Julahanpurwa, Sunsi, Koraiya, Pipra Udyan, Goriyapurwa, Bel-1, Bel-02, Ramuapur, Chandpura-01 And Chandpura-02 Road With Its Stacking. Dismounting & Carriage Of Old Tf Of 10Kva From Site To Dtc Centre And Proper Connection At Ht / Lt Of New T / F And Successfully Energization Under Work Area Sub Division Oel Under Edd-Mitauli. 14 Holding Clamp For Pcc Pole 8.5 Mtr. 15 Proper Grauting Of Stay 16 Supply Of Nut & Bolt 17 Stay Loop Insulator 18 Grouting Of Pcc / Stp Pole With All Accessories As Per Respo Norms. 19 Supply Of Stay Clamp