Supply Of Materials For Construction Of Nrlm Shed In Handignur Village Of Belagavi Taluka. - Add Sundries Charges At, 2 % On Material,Add Brush, Putty Glue At 5% On Cost Of Paint,Blacksmith 1St Class.,.,Carpender 1St Class.,.,Fitter(Grade1).,.,Mason (Brick Layer) Ist Class.,.,Carpenter (Average).,.,Carpenter 2Nd Class.,.,Mason (Brick Layer )2Nd Class.,.,Enamel Paint,.,Add Brush, Putty, Sand Paper At 5%, On Cost Of Paint,Enamel Primer,,Add Brush, Putty, Sand Paper At 2% On Cost Of Paint.,.,Water Proofing Cement Paint,.,Whitening,.,Dry Distemper.,.,Add Brush At 1% On Cost Of Paint.,,Enamel Metal Paint.,,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint.,,Ready Mix Primer Paint (Ready Mix Red Lead Paint).,,Add Hom Of Welding And Grinding Machine At 4% On Materi,Welder Grade 1.,Fitter Class 1,M.S Rods_,Add Hom Of Welding And Grinding Machine At 2% On Material,Fabricator_.,Plain Glass 5.50 Mm Thick_,Chrominum Plated Screws.,.,Cleat Angles_,Alluminium Handles - 15 Mm.,.,Alluminium Tower Bolt - 20 Cm.,.,Pvc Edge Beading.,Rubber Beading For Shutters Beading.,,Nylon Rollers.,.,Aluminium Window Frame Section 1.20 Mm Thick,,Unit Cost As Per The Specification,,Mathi/Nandi Wood Scantling,,Hom Of Machinaries For Planing,.,Add Cutting And Other Wastage 5%,,Mathi/Nandi Wood Planks For Panels 25 Mm Thick,,Mason Class I (With Tools),,Sealer For Vitrified Tiles,,Spacers For Vitrified Tiles,,Grout For Vitrified Tiles,,Adhesive For Tiles,,Vitrified Tiles 10 Mm Thick 600 X 600, Mm,Painter Class I.,,Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint.,,White Cement Based Putty At 2Sqm / Kg At Rs. 1050 Per Kgs.,,Add Providing And Removing Scaffolding At 3% On Labour.,,Binding Wire,.,Tmt Bars Fe 500,.,Add Handling Loading And Unloading At 1% On Material.,,Mixer (Concrete Small Used In Culvert.),Burnt Bricks Class 35 (Non Modular).,,Casurina Poles 75 - 100 Mm Dia.,Add Handling Loading And Unloading At 2% On Material.,,Bolts And Nuts,,Ms Flat,.,Casurina Poles 100 - 150 Mm.,,Silver Oak, Or Equivalent Planks 38 Mm Thick.,,Jungle Wood Runners And Plank.,,Hom Of Vibrator 0.71 Days.,,Broken Stone Aggregate 20 Mm Size,,Add Sundries Charges At, 1 % On Material.,Add Watering Charges At 1 % On Material.,,Mixer (Concrete) - 1 Cum Capacity.,,Plasticizer / Super Plasticizer.,.,Portland Cement,.,Coarse Sand (Zone Iii),,Broken Stone Aggregate 12 Mm To 10 Mm Size,