Bharat Coking Coal Limited-BCCL has published Tender For Various Job Such As Rope (25Mm Dia) Transportation, Rope Laying,Rope Splicing, Ng Sleeper Transportation ,60Lbs Rail Crossing Transportation Etc.For Smooth Transportation Of Materials In D-18 Panel Ofxvi(T)Seam At Moonidih Colliery W.J Area.. Submission Date for this Tender is 21-03-2024. Man Power Supply Tenders in moonidih Jharkhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Various job such as Rope (25mm dia) transportation, rope laying,rope splicing, NG sleeper transportation ,60lbs rail crossing transportation etc.for smooth transportation of materials in D-18 Panel ofXVI(T)seam at Moonidih Colliery W.J Area. |
2 | Transportationof six nos crossings of 60 lbs rails from surface to D18 panel by manual & by track/haulage in XVI (T) seam. Total nos of Trolley required = 6, Required manshift= 6 manshift x 2shift per trolley. Total manshift= 6x2x6= 72 |
3 | Transportationof 25mm haulage rope for JSDB-19 (230m) winch & JSDB-30 (700m) winch from Pit top to 40MH pit bottom including loading. Manshift required for loading of ropes= 10 manshift(Unskilled) |
4 | Transportation of haulage ropes from surface to UG & laying thereoffor JSDB-19 (230m) winch & JSDB-30 (700m).Manshift required For transportation= 6 manshift x 4 shift= 24 unskilled For laying=10 manshift x 2 shift= 20 unskilled. Total=44 manshift |
5 | Transportation of 8nos empty trolley form D-18 panel to surface for repairing. Manshift required= 6manshift x 2shift= 12 manshift (unskilled) |
6 | Dismantling of two nos of Endless haulage pulley from D-17 TG & transportingOne from D-17TG tail end to D-17 BG tail-end and other from D17 TG/6th dip jn to D18TG tail-end. Manshift required= 8manshift (unskilled) x 2shift+8manshift (unskilled) x 2shift= 32 manshift |
7 | Shifting of 60 lbs tracklines for alignment according to Endless rope in D-18 TG for smooth transportation. Manshift required= 8manshift x 4shift= 32 manshift (unskilled) |
8 | Transportation of Controller and its cables from old 8th dip 500MH loco level to surface for repairing. Manshift required= 8manshift x 2shift= 16 manshift(unskilled) |
9 | Endless haulage rope laying &splicingin D-18 TG. Manshift required= 8manshift x 2shift= 16 manshift (unskilled) |
10 | Transportation of 500NG sleepers from 5th dip/400MH Jn. to 8th dip/D-18 BG by manually. Manshift required=10 sleeper/manshift(Unskilled)=500/10=50 manshift |
11 | CMPF |
12 | CMPF, Pension and admin. Charge of Employee Un Skilled |
13 | Total impact of GST for the purpose of CTC |